Notification of Date Change for 891010 Meeting W/Util in Rockville,Md to Discuss Auxiliary Feedwater Sys Operability Issues & Plant Restart.Meeting Originally Scheduled on 890928.Agenda Encl
ML14176A463
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/20/1989
From: Lo R
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8910050016
Download: ML14176A463 (5)


Text

September 20, 19*

Docket No. 50-261 MEMORANDUM FOR:

Elinor G. Adensam, Director Project Directorate II-1 Division of Reactor Projects -

I/II FROM:

Ronnie H. Lo, Senior Project Manager Project Directorate II-1 Division of Reactor Projects -

I/II

SUBJECT:

FORTHCOMING MEETING WITH CAROLINA POWER AND LIGHT COMPANY (CP&L) REGARDING H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (HBR-2)

DATE & TIME:

ThursdW, C t ber 2&,-19 1:00 P.M.

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, Maryland 14/B /11 PURPOSE:

To discuss Auxiliary Feedwater System,-Qperability Issues and Restart of HBR-2 (Agenda enclosed).

  • PARTICIPANTS:

F NRC CP&LC G. Lainas W. Hehl T. Watson E. Adensam P. Kellogg C. Dietz R. Lo L. Garner R. Morgan L. Garner S. Varga L. Loflin J;-Wermiel T. Sullivan R. Prunty W. Lefave J. Shepard A.- Thadani C. Crawford J. Koosterman, et.al.

Original Signed By:

Ronnie H. Lo, Senior Project Manager Project Directorate II-1 Division of Reactor Projects I/Is

Enclosure:

As stated cc w/enclosure:

See next page

  • Meetings between NRC technical staff and pplicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"

43 Federal Register 28058, 6/28/78.

NAME :PA song ERL.bld R

EAdensam P

.Di DATE :09/

89

09/j,/

.09h/&

_M IC PDR ADOCK 05000261 P

PNU

H. B. Robinson Steam Etectric Plant, Unit No. 2 cc:

Mr. R. E. Jones, General Counsel Mr Dayne H. Brown, Chief Carolina Power & Light Company Radiation Protection Branch P. 0. Box 1551 Division of Facility Services Raleigh, North Carolina 27602 Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. H. A..Cole Special Deputy Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director P. 0. Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 P. 0. Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Mr. C. R. Dietz Resident Inspector's Office Manager, Robinson Nuclear Project H. B. Robinson Steam Electric Plant Department Route 5, Box 413 H. B. Robinson Steam Electric Plant Hartsville, South Carolina 29550 P. 0. Box 790 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. Heyward G. Shealy, Chief 101 Marietta Street Bureau of Radiological Health Suite 2900 South Carolina Department of Health Atlanta, Georgia 30323 and Environmental Control 2600 Bull Street Mr. R. Morgan Columbia, South Carolina 29201 General Manager H. B. Robinson Steam Electric Plant Mr. Lynn W. Eury P. 0. Box 790 Executive Vice President Hartsville, South Carolina 29550 Power Supply Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602

AGENDA H. B. ROBINSON STARTUP CONFERENCE I. Introduction A. Participant Introduction B. Description of Condition C. Agenda Review II. Brief History of Auxiliary Feedwater System (including Condensate Storage Tank)

A. Major System Configuration Stages

1. Initial Plant Startup
2. Post-TMI
3. Present (pre-shutdown)

B. Design Basis

1. Technical Specifications
2.

Configurations/Modifications C. Operations

1. Procedures
2. Surveillance/Performance
3. Maintenance III.

Summary of CP&L Investigations A. Inadequate NPSH B. Seismic Qualification of Condensate Storage Tank C. Physical Damage/Status of AFW Pumps and Motors D. Other Systems

1. NPSH
2. Surveillance Testing
3. Preventative Maintenance E.

Independent Evaluation of Previously Identified Issues F. Internal Investigation

IV. Corrective Actions A. Conformance with Design Basis B. Suction Piping Modification C. Post-MOD Acceptance Testing D. Procedure Changes E. Problem Identification/Followup F. DB Program Review V. Summary

DISTRIBUTION FOR MEETING NOTICE DATED: September 20, 1989 Doc-ket-File NRC & Local PDRs PDHI-1 Reading T. Murley/J. Sniezek J. Partlow S. Varga G. Lainas R. Lo C. Haughney OGC E. Jordan B. Grimes Receptionist (WFN)

NRC Participants ACRS (10)

GPA/PA V. Wilson L.

Thomas R. Borchardt, (17/G/21)

K.

Clark, Region I'

/-

P. Anderson R. Lobel, (11/E/22)

E. Imbro C. McCracken T. Marsh J. Huang cc:

Licensee/Applicant & Service List