eltember 20, 1989 Docket No. 50-261 MEMORANDUM FOR:
Elinor G. Adensam, Director Project Directorate II-1 Division of Reactor Projects -
I/II FROM:
Ronnie H. Lo, Senior Project Manager Project Directorate II-1 Division of Reactor Projects -
I/II
SUBJECT:
FORTHCOMING MEETING WITH CAROLINA POWER AND LIGHT COMPANY (CP&L) REGARDING H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (HBR-2)
DATE & TIME:
Thursday, September 28, 1989 1:00 P.M.
LOCATION:
One White Flint North 11555 Rockville Pike Rockville, Maryland 14/B/11 PURPOSE:
To discuss Auxiliary Feedwater System Operability Issues and Restart of HBR-2 (Agenda enclosed).
- PARTICIPANTS:
NRC CP&LC G. Lainas W. Hehl T. Watson El Adensam P. Kellogg C. Dietz R. Lo L. Garner R. Morgan L. Garner S. Varga L. Loflin J. Wermiel T. Sullivan R. Prunty W. Lefave J. Shepard A. Thadani C. Crawford J. Koosterman, et.al.
Original Signed By:
Ronnie H. Lo, Senior Project Manager Project Directorate II-1 Division of Reactor Projects -
I/II
Enclosure:
As stated cc w/enclosure:
See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy,"
43 Federal Register 28058, 6/28/78.
},-01 r" I A
OFC
- LA:
PMDI
- D:P NAME :PA son
- RLo:bld*
- EAdensam DATE :09/
/89
- 09/io/89 09/jV/89 UrILIAL LU U LUPY Uocument Name:
KUBINSUN MELIlNb UCll 8909260334 890920 PDR ADOCK o5000261 P__
PNU
H. B.*Robinson Steam Electric
'Plant, Unit No. 2 cc:
Mr. R. E. Jones, General Counsel Mr. Dayne H. Brown, Chief Carolina Power & Light Company Radiation Protection Branch P. 0. Box 1551 Division of Facility Services Raleigh, North Carolina 27602 Department of Human Resources 701 Barbour.Drive Raleigh, North Carolina 27603-2008 Mr. H. A. Cole Special Deputy Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director P. 0. Box 629 Public Staff -
NCUC Raleigh, North Carolina 27602 P. 0. Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Mr. C. R. Dietz Resident Inspector's Office Manager, Robinson Nuclear Project H. B. Robinson Steam Electric Plant Department Route 5, Box 413 H. B. Robinson Steam Electric Plant Hartsville, South Carolina 29550 P. 0. Box 790 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. Heyward G. Shealy, Chief 101 Marietta Street Bureau of Radiological Health Suite 2900 South Carolina Department of Health Atlanta, Georgia 30323 and Environmental Control 2600 Bull Street Mr. R. Morgan Columbia, South Carolina 29201 General Manager H. B. Robinson Steam Electric Plant Mr. Lynn W. Eury P. 0. Box 790 Executive Vice President Hartsville, South Carolina 29550 Power Supply Carolina Power& Light Company Post Office Box 1551 Raleigh, North Carolina 27602
DISTRIBUTION FOR MEETING NOTICE DATED:
September 20, 1989 Docket-F-i e NRC & Local PDRs PDII-1 Reading T. Murley/J. Sniezek J. Partlow S. Varga G. Lainas R. Lo C. Haughney OGC E. Jordan B. Grimes Receptionist (WFN)
NRC Participants ACRS (10)
GPA/PA V. Wilson L. Thomas R. Borchardt, (17/G/21)
K. Clark, Region II P. Anderson R. Lobel, (11/E/22)
E. Imbro C. McCracken T. Marsh J. Huang cc:
Licensee/Applicant & Service List
AGENDA H. B. ROBINSON STARTUP CONFERENCE I. Introduction A. Participant Introduction B. Description of Condition C. Agenda Review II. Brief History of Auxiliary Feedwater System (including Condensate Storage Tank)
A. Major System Configuration Stages
- 1. Initial Plant Startup
- 2. Post-TMI
- 3. Present (pre-shutdown)
B. Design Basis
- 1. Technical Specifications
- 2. Configurations/Modifications C. Operations
- 1. Procedures
- 2. Surveillance/Performance
- 3. Maintenance III.
Summary of CP&L Investigations A. Inadequate NPSH B. Seismic Qualification of Condensate Storage Tank C. Physical Damage/Status of AFW Pumps and Motors D. Other Systems
- 1. NPSH
- 2. Surveillance Testing
- 3. Preventative Maintenance E. Independent Evaluation of Previously Identified Issues F.
Internal Investigation
IV. Corrective Actions A. Conformance with Design Basis B. Suction Piping Modification C. Post-MOD Acceptance Testing D. Procedure Changes E. Problem Identification/Followup F. DBD Program Review V.
Summary