Notice of Violation from Insp on 860811-15
ML14175B423
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/17/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML14175B422 List:
References
50-261-86-21, NUDOCS 8610020236
Download: ML14175B423 (2)


Text

ENCLOSURE 1 NOTICE OF VIOLATION Carolina Power and Light Company Docket No. 50-261 H. B. Robinson License No. DPR-23 During the Nuclear Regulatory Commission (NRC) inspection conducted on August 11-15,

1986, a violation of NRC requirements was identified.

The violation involved a failure to provide adequate training to members of the emergency organization in accordance with the emergency plan and procedures. In accordance with the "General Statement of Policy and Procedure for NRC Enforce ment Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:

10 CFR 50.54(q) requires that nuclear power reactor licensees follow and maintain in effect emergency plans which meet the requirements of 10 CFR 50, Appendix E and the Planning Standards of 10 CFR 50.47(b).

10 CFR 50.47(b)(15) requires that radiological emergency response training be provided to those who may be called upon to assist in an emergency.

10 CFR 50, Appendix E, Section IV.F requires that specialized initial and periodic retraining be provided for nine categories of emergency personnel, including Damage Control and Accident Assessment Teams. Section 5.6.1.1 of the Emergency Plan requires that training for emergency response personnel be provided in accordance with Plant Emergency Procedure-0653, "Performance of Training, Drills, and Exercises."

Contrary to the above, all personnel expected to respond in the event of an emergency have not been trained in accordance with the training procedure.

"On-call" personnel were identified who had either not received initial emergency training or had-not been retrained within the applicable time frame. In addition, no personnel were designated as Accident Assessment or Damage Control Team members; nor had any training, initial or retraining, been provided to personnel in these areas.

This is a Severity Level IV violation (Supplement VIII).

Pursuant to the provisions of 10 CFR 2.201, Carolina Power and Light Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including:

(1) admission or denial of the violation, (2) the reason for the violation if

admitted, (3) the corrective steps which have been taken and the results 8610020236 860917 PDR ADOCK 05000261 G

PDR

Carolina Power and Light Company Docket No. 50-261 H. B. Robinson 2

License No. DPR-23

achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Luis A. Reyes

/for Roger D. Walker, Director Division of Reactor Projects Dated at Atlanta, Georgia this 17 day of September 1986