ML14175A867

From kanterella
Jump to navigation Jump to search
Amend 90 to License DPR-23,changing Tech Specs Requiring Station Batteries Equalizing Charge to Be Performed Annually
ML14175A867
Person / Time
Site: Robinson 
Issue date: 05/13/1985
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14175A869 List:
References
DPR-23-A-090 NUDOCS 8505240531
Download: ML14175A867 (4)


Text

  • R REG&

A 1UNITED STATES LEAR REGULATORY COMMISSION o

WASHINGTON, D. C. 20555 CAROLINA POWER AND LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

90 License No. DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Carolina Power and Light Company (the licensee) dated September 19, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance n that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.3 of Facility Operating License No. DPR-23 is hereby amended to read as follows:

8505240531 850513 PDR ADOCK 05000261 P

PDR

-2 (B) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. g0, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR EGULATORY COMMISSION even Y.

rga, hi Operating Reactors rnch'#1 Division of Licensi

Attachment:

Changes to the Technical Specifications Date of Issuance: May 13, 1985

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 90 FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Revise Appendix A as follows:

Remove Page Insert Page 4.6-2 4.6-2

(HBR-14) bypasses listed in Specification 3.7.1.d shall be demonstrated to be operable by simulating a trip signal to each of the trip devices that is bypassed and observing that the diesel does not trip.

4.6.1.3 Each diesel generator shall be inspected at each refueling.

4.6.1.4 Diesel generator electric loads shall not be increased beyond the long term rating of 2500 kW.

4.6.2 Diesel Fuel Tanks A minimum fuel oil storage of 19,000 gallons will be maintained at all times in the diesel generator fuel oil storage tank and an additional 6,000 gallons available in the I-C turbine fuel oil storage tank or in the diesel generator fuel oil storage tank.

'4.6.3 Station Batteries 4.6.3.1 The voltage and temperature of a pilot cell in each battery shall be measured and recorded daily, 5 days/week.

4.6.3.2 The specific gravity and voltage to the nearest 0.01 volt, the temperature reading of every fifth cell, the height of electrolyte and the amount of water added to each cell shall be measured and recorded monthly.

4.6.3.3 Each battery shall be subjected to an equalizing charge annually.

The requirements in 4.6.3.2 above shall be performed after each equalizing charge.

4.6.3.4 At each time data is recorded, new data shall be compared with old to detect signs of abuse or deterioration.

4.6-2 Amendment No. 90