ML14175A846

From kanterella
Jump to navigation Jump to search
Corrected Tech Spec Pages for 841107 Amend 87 to License DPR-23,correcting Pagination Errors
ML14175A846
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/20/1984
From:
NRC
To:
Shared Package
ML14175A847 List:
References
NUDOCS 8412030697
Download: ML14175A846 (4)


Text

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 87 FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Revise Appendix A as follows:

Remove Pages Insert Pages 2.1-1 thru 2.1-8 2.1-1 thru 2.1-4 2.3-1 thru 2.3-6 2.3-1 thru 2.3-6 3.1-1 thru 3.1-3a.

3.1-1 thru 3.1-3b 3.1-11 thru 3.1-12 3.1-11 thru 3.1-12 3.5-10 and 3.5-11 3.5-10 and 3.5-11 3.5-15 3.5-15 3.6-1 thru 3.6-2 3.6-1 thru 3.6-2 3.6-2a 3.6-3 3.8-6 3.8-6 3.10-2 thru 3.10-7 3.10-2 thru 3.10-7b 3.10-12 3.10-12 3.10-14 thru 3.10-20 3.10-14 thru 3.10-20 3.10-22 3.10-22 thru 3.10-24 3.11-1 thru 3.11-2 3.11-1 thru 3.11-2 4.11-1 thru 4.11-3 4.11-1 thru 4.11-3 5.3-1 thru 5.3-2 5.3-1 thru 5.3-2 8412e-0306978411 2 M~~b~002oO61 PDR ADOC pDR P

(HBaR-ll)

TABLE 3.5-1 ENGINEERED SAFETY FEATURE SYSTEM INITIATION INSTRUKENT SETTING LIMITS NO.

FUNCTIONAL UNIT CHANNEL ACTION SETTING LIMIT

1.

High Containment Pressure (HI Level)

Safety Injection*

< 5 paig

2.

High Containment Pressure (HI-HI Level)

a. Containment Spray**

< 25 paig

b. Steam Line Iolation
3.

Pressurizer Low Pressure Safety Injection*

> 1700 paig

4.

High Differential Pressure Between any Safety Injection*

K 150 psi Steam Line and the Steam Line Header

5.

High Steam Flow in 2/3 Steam Lines***

a. Safety Injection*

< 40% (at zero load) of

b. Steam Line Isolation full steam flow

< 40% (at 20% load) of full steam flow D 110% (at full load) of full steam flow Coincident with Low Tav or Low Steam

> 541OF T Line Pressure

> 600 psig steam line pressure M

6.

Loss of Power

a. 480V Emerg. Bus Undervoltage Trip Normal Supply Breaker 328 Volts + 1 Volt (Loss of Voltage) Time Delay

.75 +.25 sec.

(H1Bk-Il)

TABLE 3.5-1 (Continued)

ENGINEERED SAFETY FEATURE SYSTEM INITIATION INSTRUMENT SETTING LIHITS NO.

FUNCTIONAL UNIT CHANNEL ACTION SETTING LIMIT

6.
b. 480V Emerg. Bus Undervoltage Trip Normal Supply Breaker 412 Volta + I Volt (Cont'd)

(Degraded Voltage) Time Delay 10.0 SeconT Delay +

0.5 sec.

7.

Containment Radioactivity High Ventilation Isolation

< 2 X Reading at the Time the Alarm is Set with Known Plant Conditions rt CO Initiates also containment isolation (Phase A), feedwater line isolation and starting of all containment fans.

Initiates also containment isolation (Phase B).

Derived from equivalent AP measurements.

(HBR-1l)

TABLE 3.5-3 (Continued)

INSTRUiENTATION OPERATING CONDITIONS FOR ENGINEERED SAFETY FEATURES 3

1 2

OPERATOR ACTION MINIMLIM MIN IMLIM IF CONDITIONS OF CHANNELS DEGREE OF COLUAN I OR 2 NO.

FUNCTIONAL UNIT OPERABLE REDUNDANCY CANNOT BE MET

2.

CONTAIM ENT SPRAY

a. Manual*

2 0**

Cold Shutdown

b. High Containment Pressure*

2/set 1/set Cold Shutdown (Hi-Hi Level)

3.

LOSS OF POWER

a. 480V Emerg.

Bus Undervoltage 2/bus(a) 1/bus(b)

Main Hot Shutdown (Loss of Voltage)

b.

480V Emerg. Bus Undervoltage 2/bus 1/bus Maintain Hot Shutdown(c)

(Degraded Voltage) 0 Also initiates a Phase B containment isolation.

Must actuate two switches simultaneously.

When primary pressure is less than 2000 psig, channels may be blocked.

When primary temperature is less than 547*F, channels may be blocked.

In this case the 2/3 high steam flow is already in the trip mode.

(a) During testing and maintenance of one channel, may be reduced to 1/bus.

(b) During testing and maintenance of one channel, may be reduced to 0/bus.

(c) The reactor may remain critical below the power operating conditions with this feature inhibited for the purpose of starting reactor coolant pumps.