Amend 73 to License DPR-23,removing 3 Effective full-power Months During Cycle 9 Operations
ML14175A755
Person / Time
Site: Robinson 
Issue date: 12/10/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14175A756 List:
References
DPR-23-A-073 NUDOCS 8212220470
Download: ML14175A755 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER AND LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

73 License No. DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The appl-ication for amendment by Carolina Power and Light Company (the licensee) dated July 13, 1982, as supplemented by September 24, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.,

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8212220470 821210 PDR ADOCK 05000261 P

PDR

-2

2. Accordingly, the license is amended by changes to paragraph 3..a of Facility Operating License No. DPR-23 to read as follows:

3.1.

The following operating license condition is effective from the time the H. B. Robinson Unit 2 returns to power operation for cycle 9 and to remain in effect until the next refueling outage:

a. Cycle 9 operation shall not continue beyond a total of six effective full-power months at which time a steam generator eddy current examination will be performed.

The scope of the inspection to be performed will be submitted to the NRC for approval at least 45 calendar days prior to the inspection.

3. This license amendment is effective as of the date of its issuance.

F THE NUC A EGULATORY COMMISSION

&en

,e

!Operating Reactor anch No. 1 Division of Licen in

Attachment:

Changes to the Technical Specifications Date of Issuance: December 10, 1982