ML14175A732

From kanterella
Jump to navigation Jump to search
Amend 69 to License DPR-23,revising Tech Specs to Enlarge Capacity of Spent Fuel Pool from 276 Fuel Assemblies to 534 Assemblies
ML14175A732
Person / Time
Site: Robinson 
Issue date: 06/08/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14175A734 List:
References
DPR-23-A-069 NUDOCS 8206290582
Download: ML14175A732 (4)


Text

RE O)

.UNITED STATES 0

'NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER AND LIGHT COMPANY DOCKET NO, 50-261 H, B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No, 69 License No, DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Carolina Power and Light Company (the licensee) dated December 1, 1980, as modified by letters dated April 10, May 11, June 15, June 18, August 28, 1981 and April 2, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that.the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8206290582 820608 PDR ADOCK 05000261 p

PDR

we

-2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-23 is hereby amended to read as follows:

(B) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.69, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications,.

3. This license amendment is effective as of the date of its issuance.

FOR HE NUCLEAR REGULATORY COMMISSION Steven A.-V

,Chef Operating Reactors Branch #1 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 8, 1982

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 6 9 TO FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Revise Appendix A as follows:

Remove Page Insert Page 5.4-1 5.4-1

5.4 FUEL STORAGE 5.4.1 The new and spent fuel pit structures are designed to-withstand the anticipated earthquake loadings as Class I structures. The spent fuel pit has a stainless steel liner to ensure against loss of water.(1) 5.4.2 The new and spent fuel storage racks are designed so that it is impossible to insert assemblies in other than the prescribed locations. The fuel is stored vertically in an array with the sufficient center-to center distance between assemblies to assure k

<0.95 even if unborated water were used to fill the eff pit.

5.4.3 The spent fuel storage pit is filled with borated water at a concentration to match that used in the reactor cavity and refueling canal during refueling operations, whenever there is fuel in the pit, except.for initial new fuel storage and initial fuel loading.

5.4.4 The design of the spent fuel storage pool provides a storage location for 534 fuel assemblies.

Reference (1) FSAR Section 9.5 5.4-1 Amendment No.

69