UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER AND LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 60 License No. DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Carolina Power and Light Company (the licensee) dated August 27, 1981, as revised by letter dated August 28, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by the addition of a new paragraph 3.1 to Facility Operating License No. DPR-23 to read as follows:

3.1 The following operating license condition is effective from the time H. B. Robinson Unit 2 returns to power operation subsequent to the August 1981 steam generator inspection and to remain in effect until the next refueling outage:

a. A primary to secondary pressure test at approximately 1900 psi differential shall be performed after operation at power levels such that estimated corrosion is equivalent to or less than 8109090202 810828 PDR ADOCK 05000261 P

PDR

-2 that of 24 effective full power days operation as shown in figure 4.3.3 in Attachment B of CP&L's letter of August 21, 1981.

A period of seven additional calendar days is permitted for flexibility for scheduling the test.

b. At the end of core life of the present cycle, an eddy current examination will be performed. The scope of this inspection will be submitted to the NRC for approval at least 45 days calendar days prior to this end of core life inspection.
c. During the remainder of the cycle 8 operations, the following steam generator tube leakage criteria shall be in effect.

Specifically, the plant shall be shut.down if the verified primary to secondary leakage in one steam generator exceeds any of the following:

1. A sudden increase of 0.1 gallon per minute (gpm) if the total leakage rate in that steam generator exceeds 0.2 gpm.
2. If the leakage rate in that steam generator exceeds 0.2 gpm and an upward trend in leakage rate in excess of 0.02 gpm per day is verified. This trend will be established using at least five valid consecutive daily samples.
d. Should the plant be required to shut down to repair a steam generator tube leak as indicated in item (c) above, an inspec tion shall be performed as mutually agreed upon by the NRC Staff and CP&L.
e. The NRC Staff shall be provided with a summary of the results of the eddy current examination performed under item (b) above.
3. This license amendment is effective as of the date of its issuance.

FOR THE NUGLEAR REGULATORY COMMISSION

' Steven A. Varga, Chief

/

Operating Reactors) Branch #1 Division of Lice sina

Attachment:

Changes to License No. DPR-23 Date of Issuance:

August 28, 1981

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.

60 TO FACILITY OPERATING LICENSE NO.

DPR-23 DOCKET NO. 50-261 Revise License as follows:

Remove Pages Insert Pages 4a 4a 4b 4b

4a 3.1 The following operating license condition is effective from the time the H. B. Robinson Unit 2 returns to power operation subsequent to the August 1981 steam,.generator inspection and to remain in effect until the next refueling outage:

a. A primary to secondary pressure test at approximately 1900.psi differential shall be performed after operation at power levels such that estimated corrosion is equivalent to that of 24 effective full power days operation as shown in figure 4.3.3 in Attachment B of CP&L's letter of August 27, 1981.

A period of seven additional calendar days is permitted for flexibility for scheduling the necessary test.

b. At the end of core life of the present cycle, an eddy current examination shall be performed.

The scope of this inspection will be submitted to the NRC for approval at least 45 calendar days prior to this end of core life inspection.

c. During the remainder of the cycle 8 operations, the following steam generator tube leakage criteria shall be in effect.

Specifically, the plant shall be shut down if the verified primary to secondary leakage in one steam generator exceeds any of the following:

1. A sudden increase of 0.1 gallon per minute (gpm) if the total leakage rate in that steam generator exceeds 0.2 gpm.
2. If the leakage rate in that steam generator exceeds 0.2 gpm and an upward trend in leakage rate in excess of 0.02 gpm per day is verified. This trend will be established using at least five valid consecutive daily samples.
d. Should the plant be required to shut down to repair a steam generator tube leak as indicated in item (c) above, an inspection shall be performed as mutually agreed upon by the NRC Staff and CP&L.
e. The NRC Staff shall be provided with a summary of the results of the eddy current examination performed under item (b) above.

T4*

'o

~a OU r U

t tzd n--4 r c meme-' s~

4~oect~o of A'0 rcV en.1aro. ment as a e -v in 1=)

S.

a~t thri y es abli bed nde Fed ral ad St e

ad s as et ed b th Co ss on t be a. lic le o e 7 ci it cov red by t is 0 eraqing icene.

Iis on spo ap 1 y t (a) radbbog al ifec s sin e s& b f ct r

ceal vi in oth r pr isi as f thi ope-tic 1 CE or (bk ter, of -ate qua ity ove ed b' ect e i(b of th Federal Wa er 11u ton ot 1 Ac Amendment No. 60

4b

5.

This license is effective as of the date of issuance, and shall expire at midnight April 13, 2007.

FOR TE ATMIC ENERGY COI*2SSION Crirgial Signed by Faer A. Mrris Peter A. Morris, Director Division of Reactor Licensing ttachm ent Appenix A -

Technical Specifications rate of Issuance:

JUL 3 1 70 Amendment No. 60