ML14174A997
| ML14174A997 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/28/1991 |
| From: | Lawyer L, Mcwhorter R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML14174A996 | List: |
| References | |
| 50-261-OL-91-02, 50-261-OL-91-2, NUDOCS 9104230092 | |
| Download: ML14174A997 (2) | |
Text
N AR REG&
UNITED STATES NUCLEAR REGULATORY COMMISSION As, REGION I 101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30323 ENCLOSURE 1 EXAMINATION REPORT -
50-261/OL-91-02 Facility Licensee: Carolina Power and Light Company Facility Name:
H. B. Robinson Steam Electric Generating Plant Facility Docket No.:
50-261 Facility License No.: DPR-23 Examinations were administered at the H. B. Robinson Nuclear Plant near Hartsville, South Carolina.
Chief Examiner:
Rich d D. McWhorter Date Signed Approved By:
L'wrence L. Lawyer, Chief Date Signed Operator Licensing Section 1 Division of Reactor Safety
SUMMARY
The examination was administered on March 14, 1991.
An operating test retake was administered to one RO applicant.
The applicant passed.
9104230092 910401 PDR ADOCK 05000261 V
REPORT DETAILS
- 1.
Facility Employees Contacted:
- C. Bethea, Training Manager
- S.
Allen, License Training Manager
- H. Carter, Operator Instructor
- G. Levy, Operator Instructor.
- D. McCaskill, Shift Supervisor
- Attended Exit Meeting
- 2. *R. McWhorter, NRC, Region II
- Chief Examiner
- 3.
Exit Meeting:
At the conclusion of the site visit, the examiner met with representatives of the plant staff to discuss the results of the examination. No significant problems were noted.
The cooperation given to the examiner was also noted and appreciated.
The licensee did not identify as proprietary any material provided to or reviewed by the examiner.