ML14170B219

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review Results Regarding Relief Request PRR-24: ASME Code Case N-702 and BWRVIP-241 (MF4187)
ML14170B219
Person / Time
Site: Pilgrim
Issue date: 06/18/2014
From: Nadiyah Morgan
Division of Operating Reactor Licensing
To: Byrne R
Entergy Nuclear Operations
References
MF4187
Download: ML14170B219 (2)


Text

NRR-PMDAPEm Resource From: Morgan, Nadiyah Sent: Wednesday, June 18, 2014 3:58 PM To: Byrne, Robert M M. (rbyrne@entergy.com); Williams, Murray (mwill13@entergy.com); Lobo, Walter

Subject:

Acceptance Review Results Regarding Relief Request PRR-24: ASME Code Case N-702 and BWRVIP-241 (MF4187)

Bob, By letter dated March 12, 2014 (Agencywide Documents Access and Management System Accession No. ML14077A175), Entergy Operations, Inc., the licensee, submitted Relief Request PRR-24 for authorization to implement alternative examination requirements based on the American Society of Mechanical Engineers Code Case N-702 and Boiling Water Reactor Vessel Inspection Program-241for Pilgrim Nuclear Power Station. The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of PRR-24. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Thanks, Dee Nadiyah S. Morgan Calvert Cliffs and Pilgrim Project Manager, NRR US Nuclear Regulatory Commission O-8F4 (301) 415-1016 Nadiyah.Morgan@NRC.GOV 1

Hearing Identifier: NRR_PMDA Email Number: 1388 Mail Envelope Properties (Nadiyah.Morgan@nrc.gov20140618155700)

Subject:

Acceptance Review Results Regarding Relief Request PRR-24: ASME Code Case N-702 and BWRVIP-241 (MF4187)

Sent Date: 6/18/2014 3:57:53 PM Received Date: 6/18/2014 3:57:00 PM From: Morgan, Nadiyah Created By: Nadiyah.Morgan@nrc.gov Recipients:

"Byrne, Robert M M. (rbyrne@entergy.com)" <rbyrne@entergy.com>

Tracking Status: None "Williams, Murray (mwill13@entergy.com)" <mwill13@entergy.com>

Tracking Status: None "Lobo, Walter" <wlobo@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1977 6/18/2014 3:57:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: