MONTHYEARML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22081A2222022-03-22022 March 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 1, License Amendment Request to Revise Allowable Value for TS Table 3.3.2-1, Function 6.e(1) ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML22131A1902022-02-23023 February 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Request to Revise the Reactor Vessel Surveillance Capsule Withdrawal Schedule ML22046A0392022-02-15015 February 2022 NRR E-mail Capture - Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22011A0382022-01-10010 January 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-205-A, Rev. 3 and TSTF-563-A ML21306A2452021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21252A0912021-09-0909 September 2021 NRR E-mail Capture - Request for Comments on Proposed Issuance of Amendments to Watts Bar Nuclear Plant, Unit 2 - Revise Steam Generator Secondary Side Water Level ML21223A2592021-08-11011 August 2021 Affidavit - Prop Slides - Partially Closed Meeting with TVA Potential Watts Bar, Unit 2 Tube Locking LAR ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21215A1152021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21215A1142021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21197A0452021-07-15015 July 2021 WBN U1 Isi/Sgisi Request for Information (RFI) Letter ML21193A2422021-07-12012 July 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 2 Technical Specifications Related to Steam Generator Inspection/Repair Program Provisions ML21189A0202021-06-29029 June 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specifications 3.3.6 and 3.3.7 Re Radiation Monitor Redundant Unit of Measure 2024-01-22
[Table view] |
Text
NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, June 16, 2014 7:33 AM To: garent@tva.gov; rhbryan@tva.gov Cc: Quichocho, Jessie; Poole, Justin; Brezovec, Michael; Barss, Dan; LaVie, Steve
Subject:
Watts Bar, Unit 2 - RAIs for Radiological Emergency Plan (NP-REP, Rev. 103)
Attachments: REQUEST FOR ADDITIONAL INFORMATION.DOCX Attached please find the RAIs for the subject matter so that you can address them in Rev. 104 of NP-REP that is due on Aug. 15, 2014. These RAIs have been generated after reviewing Rev. 103 of NP-REP, and also comparing Rev. 92 (the basis of SSER-22) with Rev. 103.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LP-WB)
Watts Bar Nuclear Plant, Unit 1 Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 1381 Mail Envelope Properties (Siva.Lingam@nrc.gov20140616073300)
Subject:
Watts Bar, Unit 2 - RAIs for Radiological Emergency Plan (NP-REP, Rev. 103)
Sent Date: 6/16/2014 7:33:12 AM Received Date: 6/16/2014 7:33:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:
"Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Brezovec, Michael" <Michael.Brezovec@nrc.gov>
Tracking Status: None "Barss, Dan" <Dan.Barss@nrc.gov>
Tracking Status: None "LaVie, Steve" <Steve.LaVie@nrc.gov>
Tracking Status: None "garent@tva.gov" <garent@tva.gov>
Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 559 6/16/2014 7:33:00 AM REQUEST FOR ADDITIONAL INFORMATION.DOCX 25654 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION WATTS BAR NUCLEAR PLANT, UNIT 2 RADIOLOGICAL EMERGENCY PLAN TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-391 Note: RAI numbers continue from the sequence in the previous requests for additional information in NRC letters dated March 11, 2010 and May 28, 2010. Please do not submit safeguards information. Also, information requests regarding multiple site response are not related to the Fukushima Near-Term Task Force recommendations.
- 24. Confirmatory Item 37 in Table HH, Watts Bar Unit 2 Action Items Table, of SSER-22 requires the NRC to review the NP-REP, including the combined WBN Unit 1 and 2 Appendix C to confirm that changes made to NP-REP since Revision 92 do not affect the bases of the staffs findings in the Supplemental Safety Evaluation 22 (SSER-22).
The staff requests additional information to support this review.
- a. Revision 103xx of Appendix C, Fission Product Barrier Matrix emergency action level 1.1.2, shows loss of sub cooling thresholds for both units. For Unit 1, the threshold is (<65°F indicated), [85°F ADV]. For Unit 2, the threshold is (<42°F indicated), [42°F ADV]. The staff understands the Unit 2 indicated values are different from the Unit 1 values. Please confirm that 42°F is correct for both indicated and ADV at Unit 2.
- b. By letter dated April 27, 2010, TVA responded to RAI 5.a, stating that the use of ARWs as a compensatory measure for radiation protection (RP) technicians remains correct with regard to Unit 2. Please identify where in Appendix C this use of ARWs is described, and how many such individuals are assigned.
- c. By letters dated April 27, 2010 and October 11, 2010, TVA responded to RAI 5.c by committing to add text clarifying the staffing time requirements for the Technical Support Center (TSC) and the Onsite Support Center (OSC). As identified in §13.2.2.2 of SSER-22, the staff found the proposed language acceptable. The staff confirmed that the language had been incorporated in
§ C.5 of Revision 103 of NP-REP. The staff also noted that the language in § 3.1 (page 11) appropriately referenced the site-specific information in § C.5.
However, §§ 6.1.1 and 6.1.2 state that the activation time of the TSC and OSC is conditional on time of day, weather conditions, or immediate availability of personnel. This is the language the staff sought to resolve with the RAI. Please resolve the inconsistency between TVAs response to RAI 5.c and §§ 6.1.1 and 6.1.2 or provide justification as to why resolution is not necessary.
- d. Figures 10-1 and 10-2 of Revision 103 of NP-REP are significantly different from those reviewed for SSER-22. The staff has one concern regarding the branches that start with the decision Is the GE declared due to Hostile Action, and Is there an ongoing Hostile Action. The staff believes that the logic of the figures would always lead to a sheltering protective action even if the ongoing Hostile Action had initiated a significant radioactivity release. There appears to be no
path to a dose-based protective action recommendation until the hostile action is terminated, which, like ongoing, is not clearly defined in the figures. At what point in a protracted response to a hostile action, would TVA make a dose-based protective action recommendation for the public? Please provide a justification for this approach. [The staff understands that this figure will be revised in Revision 104, but wants to ensure that the concern isnt carried over to the new figures.]
- 25. The issuance of SSER-22 preceded the EP rulemaking by several months. The implementation of changes to 10 CFR Part 50 Appendix E at Unit 2 was explicitly addressed in Section I.6 of Appendix E. This rule allowed TVA to meet the requirements of the final rule for Unit 2 on the same schedule applicable to Unit 1. This clause was added to prevent the rule implementation from delaying the issuance of the Unit 2 operating license, then-expected in April 2012. The implementation dates for the majority of the rule provisions have since passed. An applicant has to demonstrate compliance with all effective rules prior to the issuance of an operating license under Part 50. In reviewing Revision 103 of NP-REP, the staff identified the need for additional information to make this determination:
- a. Section IV.A.7 of Appendix E to 10 CFR Part 50 requires licensees to identify and describe the assistance expected from appropriate State, local, and Federal agencies with responsibility for coping with emergencies, including hostile action by June 23, 2014. Please provide a description of the arrangements for this assistance which demonstrates that this requirement has been met. If this is already addressed in the NP-REP, please provide a citation.
- b. Section IV.A.8 of Appendix E to 10 CFR Part 50 requires licensees to perform a detailed analysis of on-shift staffing. This rule did not require that holders of operating licensee submit this analysis for staff review. However, Unit 2 is an applicant for an operating license under Part 50 and compliance with this requirement must be demonstrated before the operating license may be issued.
Please provide a copy of the current staffing analysis that addresses the staffing for Unit 2.
- c. Section IV.E.8.c of Appendix E to 10 CFR Part 50 requires that emergency operations facility (i.e. CECC) have certain capabilities by June 20, 2012, including, in part, (2) the capability to support response to events occurring simultaneously at more than one nuclear power reactor site if the emergency operations facility serves more than one site. Section 8.2 of NP-REP does not appear to address this capability nor does CECC-EPIP-1. Please provide a description of the CECC capabilities to serve as the EOF for simultaneous events at more than one site.
- d. The staff understands that Revision 104 will address the new requirements for an alternate facility (Appendix E IV.E.8.d), which must be implemented prior to December 23, 2014. If the staffs understanding is in error, please describe how TVA plans to demonstrate compliance prior to the issuance of the Unit 2 operating license.
- f. Section 14.4 of NP-REP addresses the performance of critiques for exercises and drills. Section 15 addresses training. However, neither section appears to
address the requirement in § IV.F.2.g, which also requires formal critiques for training that provides performance opportunities to develop, maintain, or demonstrate key skills. This particular requirement became effective on December 23, 2013. Please resolve this omission or provide justification for why resolution is not necessary.