L-2014-150, St. Lucie, Units 1 and 2 - Environmental Protection Plan Report, Biological Plan of Study Implementation for St. Lucie Plant EPU, Report of Preliminary Findings

From kanterella
(Redirected from ML14163A504)
Jump to navigation Jump to search
St. Lucie, Units 1 and 2 - Environmental Protection Plan Report, Biological Plan of Study Implementation for St. Lucie Plant EPU, Report of Preliminary Findings
ML14163A504
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/23/2014
From: Katzman E S
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14163A503 List:
References
L-2014-150
Download: ML14163A504 (1)


Text

0 IPL.May 23, 2014 L-2014-150 10 CFR 50.4 EPP 3.2.2 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Industrial Wastewater Facility Permit No. FL0002208 Environmental Protection Plan Report Biological Plan of Study Implementation for St. Lucie Plant EPU, Report of Preliminary Findings Pursuant to Section 3.2.2 of the St. Lucie Environmental Protection Plan, Florida Power & Light Company (FPL) is hereby providing the enclosed copy of the biological plan of study (BPOS) report of preliminary findings submitted to the State of Florida Department of Environmental Protection.

Please contact Vince Munn6 (772) 263-2847 should you have any questions on this matter.Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/rcs Enclosure (VPPSL053)

Florida Power & Light Company CfL 6501 S. Ocean Drive, Jensen Beach, FL 34957