L-2014-150, St. Lucie, Units 1 and 2 - Environmental Protection Plan Report, Biological Plan of Study Implementation for St. Lucie Plant EPU, Report of Preliminary Findings
ML14163A504 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 05/23/2014 |
From: | Katzman E S Florida Power & Light Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML14163A503 | List:
|
References | |
L-2014-150 | |
Download: ML14163A504 (1) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Environmental Protection Plan
MONTHYEARL-2021-073, Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit2021-04-16016 April 2021
[Table view]Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2020-095, Environmental Protection Plan Iww Permit No. FL0002208 Minor Permit Revision for Chlorine Dioxide2020-06-0909 June 2020 Environmental Protection Plan Iww Permit No. FL0002208 Minor Permit Revision for Chlorine Dioxide L-2018-128, Environmental Protection Plan Report Unusual or Important Environmental Event - Turtle Mortality2018-06-14014 June 2018 Environmental Protection Plan Report Unusual or Important Environmental Event - Turtle Mortality L-2017-160, Environmental Protection Plan Report Minor Permit Revision Request for Blowdown Sample Panel Discharge Iww Permit No. FL00022082017-09-13013 September 2017 Environmental Protection Plan Report Minor Permit Revision Request for Blowdown Sample Panel Discharge Iww Permit No. FL0002208 L-2017-012, Environmental Protection Plan Report2017-01-24024 January 2017 Environmental Protection Plan Report L-2016-069, Environmental Protection Plan Report - Request to Renew Industrial Wastewater Facility Permit2016-03-29029 March 2016 Environmental Protection Plan Report - Request to Renew Industrial Wastewater Facility Permit ML15313A3992015-10-0707 October 2015 St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study L-2015-260, St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study2015-10-0707 October 2015 St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study ML15313A4742015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names ML15313A4652015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data ML15313A4412015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info ML15313A4402015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All ML15313A4392015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans ML15313A4382015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered ML15313A4372015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers ML15313A4222015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time ML15313A4212015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data ML15313A4202015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data ML15313A4192015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas ML15313A4032015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data ML15313A4022015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight ML15313A4012015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas ML15313A4002015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents L-2015-260, Biological Plan of Study Implementation, Water Quality Data - Tables 1-202015-04-30030 April 2015 Biological Plan of Study Implementation, Water Quality Data - Tables 1-20 ML15314A5872015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data ML15314A5862015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data ML15314A5842015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas ML15314A5832015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data ML15314A5812015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans ML15313A4662015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Final Report L-2015-146, Florida Power & Light Company - Biological Plan of Study Implementation for St. Lucie Plant EPU Final Report - August 2011 - February 20152015-04-30030 April 2015 Florida Power & Light Company - Biological Plan of Study Implementation for St. Lucie Plant EPU Final Report - August 2011 - February 2015 L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas L-2015-260, St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans 2021-04-16 Category:Letter MONTHYEARIR 05000335/20240032024-11-0707 November 2024
[Table view]Integrated Inspection Report 05000335/2024003 and 05000389/2024003 ML24291A2862024-11-0101 November 2024 – Relief Request: Proposed Alternative in Accordance with 10 CFR 50.55a(Z)(1), Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 ML24228A2962024-09-0606 September 2024 NRC to NMFS, Designation of FPL as the Non-Federal Representative for St. Lucie IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report 2024-09-09 |
Text
0 IPL.May 23, 2014 L-2014-150 10 CFR 50.4 EPP 3.2.2 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Industrial Wastewater Facility Permit No. FL0002208 Environmental Protection Plan Report Biological Plan of Study Implementation for St. Lucie Plant EPU, Report of Preliminary Findings Pursuant to Section 3.2.2 of the St. Lucie Environmental Protection Plan, Florida Power & Light Company (FPL) is hereby providing the enclosed copy of the biological plan of study (BPOS) report of preliminary findings submitted to the State of Florida Department of Environmental Protection.
Please contact Vince Munn6 (772) 263-2847 should you have any questions on this matter.Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/rcs Enclosure (VPPSL053)
Florida Power & Light Company CfL 6501 S. Ocean Drive, Jensen Beach, FL 34957