MONTHYEARML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 ML24044A1772024-02-14014 February 2024 RAI for 180 Days Steam Generator Report ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22278A0972022-10-0606 October 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Fire Protection Program Changes ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 IR 05000334/20220102022-01-13013 January 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000334/2022010 and 05000412/2022010 ML21292A0482021-10-19019 October 2021 Ti 2515/194 Inspection Documentation Request ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20290B0082020-10-0808 October 2020 Draft Request for Additional Information - Steam Generator Letter ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20072N0402020-03-12012 March 2020 Request for Additional Information - Control Envelope Habitability LAR ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18242A3642018-08-29029 August 2018 Request for Additional Information (Final) -Steam Generator Technical Specification LAR ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML18024B3642018-01-24024 January 2018 NRR E-mail Capture - Beaver Valley 10 CFR 50.54(f) - NTTF 2.1 SPRA Review ML18019A0722018-01-18018 January 2018 NRR E-mail Capture - Beaver Valley Unit No. 1: Request for Additional Information - Modified Rtpts Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17353A1582017-12-19019 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17352B2612017-12-18018 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17256A2502017-09-13013 September 2017 NRR E-mail Capture - Beaver Valley Power Station Units 1&2: Request for Additional Information for Emergency Plan EAL Change to Adopt NEI 99-01, Rev. 6, ML17220A2342017-08-0808 August 2017 E-mail Regarding Request for Additional Information for NFPA 805 License Amendment Request ML17093A7622017-04-10010 April 2017 Request for Additional Information Regarding Emergency Action Level Scheme Change License Amendment Request ML17031A0362017-02-0303 February 2017 Request for Additional Information Regarding Relief Request Numbers PR6 and PR7 ML16333A0162016-12-0202 December 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16147A2842016-06-14014 June 2016 Request for Additional Infomation Regarding Fall 2015 Refueling Steam Generator Tube Inspections ML16071A1222016-04-0707 April 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16084A8442016-03-30030 March 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16060A0122016-02-29029 February 2016 FENOC - Email RAI to Licensee Regarding LAR for Changes to TS 5.3.1 CAC Nos. MF7118, MF7119, and MF7120 ML15320A4132015-11-24024 November 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15280A0742015-10-0909 October 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15279A1252015-10-0505 October 2015 Licensed Operator Positive for Fitness-for-Duty-Test ML15181A2142015-07-14014 July 2015 Request for Additional Information Regarding License Amendment Request to Revise Steam Generator Technical Specifications to Reflect TSTF-510 and to Revise Alloy 800 Sleeve Technical Specifications (TAC Nos. MF6054 & MF6055) ML15125A4162015-05-11011 May 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 (TAC Nos. MF3301 & MF3302) ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information 2024-07-17
[Table view] |
Text
DRAFT REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-425 TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM BEAVER VALLEY POWER STATION - UNITS 1 AND 2 DOCKET NO. 50-344 AND 50-412 By letter dated October 18, 2013,1 FirstEnergy Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) for Beaver Valley Power Station, Units 1 and 2 (BVPS). The proposed amendment would modify the BVPS technical specifications by relocating specific surveillance frequencies to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, Revision 1, Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies.2 To complete its review, the Nuclear Regulatory Commission (NRC) staff requests a response to the questions below.
RAI 1: The finding pertaining to IF-D5-01, located in Table 2 of Enclosure B of the LAR, observes that the licensee uses outdated Internal Flooding Pipe and Tank Break frequencies for their Internal Flood (IF) assessment. The peer review team suggested that the licensee should update this Surveillance Requirement (SR) to reflect more recent experience and should include plant specific experience. The licensee addressed this by stating that the latest IF model and focused peer review supersedes this finding and that the resolution is documented. Please describe the result of this SR in the updated PRA model and focused peer review and its associated resolution.
RAI 2: The finding pertaining to IF-D5-02, also located in Table 2 of Enclosure B of the LAR, observes that the licensee uses generic capacity factor data, which lowers the Initiating Event Frequency (IEF) and causes inconsistent IF IEFs for pipe break. The peer review team suggested that the calculation for IF IEF be revised to be consistent with the focused Peer Review Facts and Observations (F&Os) as well as with the method used for other IEFs. The licensee addressed this by stating that the latest IF model and focused peer review supersedes this finding and that the resolution is documented.
Please describe the result of this SR in the updated PRA model and focused peer review and its associated resolution.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML13295A006.
2 ADAMS Accession No. ML071360456.
DRAFT
RAI 3: Please describe, in more detail, how fire and seismic events will be assessed in terms of NEI 04-10 guidance. The licensee discusses the use of a Seismic and Fire PRA in Section 3.0, External Events Considerations, of Enclosure C of the LAR, and states that it has not been peer reviewed. However, the licensee indicated that they plan to use these models to quantify Surveillance Test Interval changes. NEI 04-10 states, in part, that Plants implementing TSTF-425 shall evaluate their PRAs in accordance with
[Regulatory Guide (RG) 1.200, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, Revision 13]. The statements made in the submittal indicated that the fire and seismic portions of the BVPS PRA have not been assessed against the PRA Standard referenced in RG 1.200, Revision 2.4 For fire and seismic external events, please explain whether a qualitative or bounding (step 10), or detailed risk analyses (step 11) described in the NEI 04-10 guidance will be used (PRA model for step 11 should meet technical adequacy of RG 1.200 Revision 2).
RAI 4: In the F&O related to SY-B1, located in Table 2 of Enclosure C of the LAR, the licensee resolved the peer review teams unmet finding by using a different source of information than what was prescribed in the American Society of Mechanical Engineers (ASME) RA-Sb-2005, Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications, PRA standard (ASME PRA Standard). The licensee further states that Westinghouse Commercial Atomic Power (WCAP)-16672-P was used because it addressed the concerns that were raised regarding the consistency and correctness of the CCF [common-cause failure] events included in the NRC CCF database. Please provide the points of deviation between the WCAP and NUREG/CR-5497 and their potential impact on the risk result.
RAI 5: The submittal highlights the licensees PRA model changes and peer reviews against the ASME PRA standard. The ASME PRA Standard and RG 1.200 Revision 2 clarify the definition of a model update versus an upgrade. Please provide clarification on the model changes as to whether they were updates or upgrades.
RAI 6: The licensee discusses all of the PRA model changes and a subsequent peer reviews in the submittal but does not provide any information regarding the resolution of the F&Os that were considered to be documentation. Please provide those applicable F&Os and their resolution.
3 ADAMS Accession No. ML070240001.
4 ADAMS Accession No. ML090410014.