NRR E-mail Capture - FW: Acceptance REVIEW-(LAR)-SURRY Power Station, Units 1 and 2, Relocation of Augmented Inspection Requirements, from TS 4.2 and TS 4.15 to Technical Requirements Manual
ML14153A085
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/30/2014
From: V Sreenivas
Plant Licensing Branch II
To: Heacock D
Dominion
References
MF4028, MF4029
Download: ML14153A085 (2)


Text

1 NRR-PMDAPEm Resource From:

Sreenivas, V Sent:

Friday, May 30, 2014 3:36 PM To:

'david.heacock@dom.com' (david.heacock@dom.com)

Cc:

'Gary D Miller'; 'david.sommers@dom.com' (david.sommers@dom.com); Pascarelli, Robert; Hemphill, Khadijah; Dean, Jeremy

Subject:

FW: ACCEPTANCE REVIEW-(LAR)-SURRY POWER STATION, UNITS 1 AND 2, RELOCATION OF AUGMENTED INSPECTION REQUIREMENTS, FROM TS 4.2 AND TS 4.15 TO TECHNICAL REQUIREMENTS MANUAL (TAC MF4028 AND MF4029)

By letter dated April 11, 2014, Virginia Electric and Power Company (Dominion) submitted a license amendment request to revise the Surry Units 1 and 2 Technical Specifications (TS). Specifically, TS 4.2, "Augmented Inspections," and TS4.15, "Augmented Inservice Inspection Program for High Energy Lines Outside of Containment," will be relocated to the Surry Technical Requirements Manual (TRM). In addition, TS 6.4.U, "Augmented Inspections and Examinations," will be added to the Administrative Controls Section 6.4, "Unit Operating Procedures and Programs." The proposed relocation of the TS 4.2 and TS 4.15 requirements to the TRM is appropriate since these requirements do not satisfy the categories and criteria of 1 OCFR50.36(c) for inclusion in the TS. Along with the relocation of the TS 4.2 and TS 4.15 requirements to the TRM, the Bases for TS 4.2 and TS 4.15 are also being relocated to the TRM. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this proposed amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plants.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at 301-415-2597.

V. Sreenivas, PH.D., C.P.M.,

Project Manager, LPL2-1, North Anna and Surry Power Stations Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier:

NRR_PMDA Email Number:

1323 Mail Envelope Properties (V.Sreenivas@nrc.gov20140530153600)

Subject:

FW: ACCEPTANCE REVIEW-(LAR)-SURRY POWER STATION, UNITS 1 AND 2, RELOCATION OF AUGMENTED INSPECTION REQUIREMENTS, FROM TS 4.2 AND TS 4.15 TO TECHNICAL REQUIREMENTS MANUAL (TAC MF4028 AND MF4029)

Sent Date:

5/30/2014 3:36:13 PM Received Date:

5/30/2014 3:36:00 PM From:

Sreenivas, V Created By:

V.Sreenivas@nrc.gov Recipients:

"'Gary D Miller'" <gary.d.miller@dom.com>

Tracking Status: None

"'david.sommers@dom.com' (david.sommers@dom.com)" <david.sommers@dom.com>

Tracking Status: None "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov>

Tracking Status: None "Hemphill, Khadijah" <Khadijah.Hemphill@nrc.gov>

Tracking Status: None "Dean, Jeremy" <Jeremy.Dean@nrc.gov>

Tracking Status: None

"'david.heacock@dom.com' (david.heacock@dom.com)" <david.heacock@dom.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2515 5/30/2014 3:36:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: