Core Operating Limits Report (COLR) for Cycle 22
ML14149A388
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/27/2014
From: Gatlin T
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14149A388 (33)


Text

Thomas D. Gatlin Vice President,Nuclear Operations 803.345.4342 May 27, 2014 A SCANA COMPANY U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (UNIT 1)

DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 CORE OPERATING LIMITS REPORT (COLR) FOR CYCLE 22 In accordance with Section 6.9.1.11 of the Virgil C. Summer Nuclear Station Technical Specifications, South Carolina Electric & Gas Company, acting for itself and as an agent for South Carolina Public Service Authority, hereby submits the Core Operating Limits Report for Cycle 22.

Should you have any questions, please call Bruce Thompson at (803) 931-5042.

Very truly yours, Thomas D. Gatlin BJDiTDG/rp

Attachment:

V. C. Summer Unit 1 Cycle 22 Core Operating Limits Report Revision 1 c: Without Attachment unless noted K. B. Marsh V. M. McCree (w/attachment)

S. A. Byrne S. A. Williams (w/attachment)

J. B. Archie S. E. Jenkins N. S. Carns NRC Resident Inspector (w/attachment)

J. H. Hamilton NSRC J. W. Williams RTS (LTD 320)

W. M. Cherry File (RR 5000)

K. M. Sutton DMS (RC-14-0080)

Virgil C.Summer Station. Post Office. Box 88- Jenkinsville, SC. 29065 . F(803) 941-9776

SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 CORE OPERATING LIMITS REPORT FOR CYCLE 22 REVISION 1 MAY 2014

LIST OF EFFECTIVE PAGES PAGE REVISION i 1 ii 1 iii 1 1 1 2 1 3 1 4 1 5 1 6

7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 1 24 1 25 1 26 1 27 1

Table of Contents Section Page 1.0 Core Operating Limits Report 1 2.0 Operating Limits 2 2.1 Moderator Temperature Coefficient (Specification 3.1.1.3) 2 2.2 Shutdown Rod Insertion Limits (Specification 3.1.3.5) 2 2.3 Control Rod Insertion Limits (Specification 3.1.3.6) 3 2.4 Axial Flux Difference (Specification 3.2.1) 3 2.5 Heat Flux Hot Channel Factor - FQ(z) (Specification 3.2.2) 3 2.6 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FNH (Specification 3.2.3) 4 2.7 Power Distribution Measurement Uncertainty (Specifications 3.2.2 and 3.2.3) 4 3.0 References 6 Revision I

List of Tables Table Page Table 1. RAOC W(z) at 150 MWD/MTU V. C. Summer- Cycle 22 11 Table 2. RAOC W(z) at 3000 MWD/MTU V. C. Summer - Cycle 22 12 Table 3. RAOC W(z) at 5000 MWD/MTU V. C. Summer - Cycle 22 13 Table 4. RAOC W(z) at 8000 MWD/MTU V. C. Summer - Cycle 22 14 Table 5. RAOC W(z) at 10000 MWD/MTU V. C. Summer - Cycle 22 15 Table 6. RAOC W(z) at 14000 MWD/MTU V. C. Summer - Cycle 22 16 Table 7. RAOC W(z) at 20000 MWD/MTU V. C. Summer- Cycle 22 17 Table 8. RAOC FQ Margin Decreases in Excess of 2% Per 31 EFPD - Cycle 22 18 Table 9. Baseload W(z) at 150 MWD/MTU V. C. Summer - Cycle 22 19 Table 10. Baseload W(z) at 3000 MWD/MTU V. C. Summer - Cycle 22 20 Table 11. Baseload W(z) at 5000 MWD/MTU V. C. Summer - Cycle 22 21 Table 12. Baseload W(z) at 8000 MWD/MTU V. C. Summer - Cycle 22 22 Table 13. Baseload W(z) at 10000 MWD/MTU V. C. Summer - Cycle 22 23 Table 14. Baseload W(z) at 14000 MWD/MTU V. C. Summer - Cycle 22 24 Table 15. Baseload W(z) at 20000 MWD/MTU V. C. Summer - Cycle 22 25 Table 16. Baseload FQ Margin Decreases in Excess of 2% Per 31 EFPD -Cycle 22 26 ii Revision 1

List of Figures Figure Paue Figure 1. Moderator Temperature Coefficient Versus Power Level V. C. Summer - Cycle 22 7 Figure 2. Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation V. C. Summer - Cycle 22 8 Figure 3. Axial Flux Difference Limits as a Function of Rated Thermal Power V. C. Summer-Cycle 22 9 Figure 4. K(z) - Normalized FQ(z) as a Function of Core Height V. C. Summer - Cycle 22 10 Figure 5. RCS Total Flowrate vs. R for Three Loop Operation V. C. Summer - Cycle 22 27 iii Revision I

V. C. Summer Cycle 22 May 2014 1.0 Core Operating Limits Report This Core Operating Limits Report (COLR) for V. C. Summer Station Cycle 22 has been prepared in accordance with the requirements of Technical Specification 6.9.1.11.

The Technical Specifications affected by this report are listed below:

3.1.1.3 Moderator Temperature Coefficient 3.1.3.5 Shutdown Rod Insertion Limits 3.1.3.6 Control Rod Insertion Limits 3.2.1 Axial Flux Difference 3.2.2 Heat Flux Hot Channel Factor 3.2.3 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor 3.3.3.11 Power Distribution Measurement Uncertainty I Revision 1

V. C. Summer Cycle 22 May 2014 2.0 Operating Limits The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the subsections which follow. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.9.1.11.

2.1 Moderator Temperature Coefficient (Specification 3.1.1.3):

2.1.1 The Moderator Temperature Coefficient (MTC) limits are:

The BOL/ARO-MTC shall be less positive than the limits shown in Figure 1.

The EOL/ARO/RTP-MTC shall be less negative than -4.8x 104 Ak/k/°F (-48 pcm/°F).

where: BOL stands for Beginning of Cycle Life ARO stands for All Rods Out RTP stands for RATED THERMAL POWER EOL stands for End of Cycle Life 2.1.2 The MTC Surveillance limit is:

The 300 ppmn/ARO/RTP-MTC should be less negative than or equal to -4.1x104' Ak/k/°F

(-41 pcm/°F).

2.1.3 The Revised Predicted near-EOL 300 ppm MTC shall be calculated using the following algorithm from Reference 2:

Revised Predicted MTC = Predicted MTC + AFD Correction*+ Predictive Correction**

  • AFD Correction is 0.05 pcm/°F/%AAFD.
    • Predictive Correction is -3 pcm/°F.

If the Revised Predicted MTC is less negative than the SR 4.1.1 .3b limit of

-4.1x10 4 Ak/k/ 0F, and all of the benchmark data contained in the surveillance procedure are met, then an MTC measurement in accordance with SR 4.1.1.3b is not required.

2.2 Shutdown Rod Insertion Limits (Specification 3.1.3.5):

The shutdown rods shall be withdrawn to at least 230 steps.

Revision I

V. C. Summer Cycle 22 May 2014 2.3 Control Rod Insertion Limits (Specification 3.1.3.6):

Control Bank A and B rods shall be withdrawn to at least 230 steps. Control Bank C and D Rod Insertion Limits are specified by Figure 2. Control rod overlap is 102 steps.

2.4 Axial Flux Difference (Specification 3.2.1):

2.4.1 The Axial Flux Difference (AFD) Limits for Relaxed Axial Offset Control (RAOC) operation for Cycle 22 are shown in Figure 3.

2.4.2 The Axial Flux Difference (AFD) target band during base load operations for Cycle 22 is:

BOL - EOL (0 - 23,000 MWD/MTU): +/-5% about a measured target value.

~~~~~ND' s7%o E 2.4.3 The minimum allowable power level for base load operation, APLo, is 75% of RATED THERMAL POWER.

2.5 Heat Flux Hot Channel Factor - FQ(z) (Specification 3.2.2):

F QTP FQ (Z) < -* x K(Z) for P > 0.5 P

F RTPThraPoe

_< x K(Z) forP _<0.5 where: P Thermal Power FQ (Z) *Q 0.5 Rated Thermal Power 2.5.1 F TP =2.45 2.5.2 K(z) is provided in Figure 4.

2.5.3 Elevation dependent W(z) values for RAOC operation at 150, 3000, 5000, 8000, 10000, 14000, and 20000 MWD/MTU are shown in Tables I through 7, respectively. This information is sufficient to determine W(z) versus core height in the range of 0 MWD/MTU to EOL burnup through the use of three point interpolation. A 2% penalty factor shall be used for RAOC operation to increase FQm(z) as per Surveillance Requirement 4.2.2.4e. A 2% penalty factor shall be used at all burnups.

3 Revision I

V. C. Summer Cycle 22 May 2014 2.5.4 Elevation dependent W(Z)BL values for Baseload operation between 75 and 100% of rated thermal power with the item 2.4.2 specified target band about a measured target value at 150, 3000, 5000, 8000, 10000, 14000, and 20000 MWD/MTU are shown in Tables 8 through 14, respectively. This information is sufficient to determine W(z)BL versus core height for burnups in the range of 0 MWD/MTU to EOL burnup through the use of three point interpolation. Table 15 shows FQ margin decreases for base load operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase FQf(z) as per Surveillance.

2.6 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FH (Specification 3.2.3):

- where: P = Thenral Power R=

FRTPH(I + PFNH x (1 - P)) Rated Thermal Power 2.6.1 FRTP =1.62 2.6.2 PFH =0.3 2.6.3 The Acceptable Operation Region from the combination of Reactor Coolant System total flow and R is provided in Figure 5.

2.7 Power Distribution Measurement Uncertainty (Specifications 3.2.2 and 3.2.3):

If the Power Distribution Monitoring System is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UFAH, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNAH shall be calculated by the following formula:

UA

-1.0 + AH UFAH 100.0 where: UAH = Uncertainty for enthalpy rise as defined in equation (5-19) in Reference 1 or 4.0, whichever is larger.

4 Revision 1

V. C. Summer Cycle 22 May 2014 If the Power Distribution Monitoring System is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:

UFQ 1.0 + ioo.j Ue, where: UQ = Uncertainty for FQ(z) = 5.0 when confirming FQ(z) for RAOC or Base Load operation, or as defined in equation (5-19) in Reference 1 for all other purposes.

U, = Engineering uncertainty factor.

= 1.03 If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UFAH, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNAH shall be calculated by the following formula:

U*F*H U R where: U FAHm =Base FAH measurement uncertainty.

= 1.04 If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:

UFQ = Uqu

  • Ue where: Uqu = Base FQ measurement uncertainty.

= 1.05 U, = Engineering uncertainty factor.

= 1.03 5 Revision 1

V. C. Summer Cycle 22 May 2014 3.0 References

1) WCAP-12472-P-A, "BEACON Core Monitoring and Operations Support System," August, 1994, (W Proprietary)

WCAP-12472-P-A, Addendum 1-A, "BEACON Core Monitoring and Operations Support System," January 2000, (W Proprietary).

2) WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient," March 1997, (W Proprietary).

6 Revision 1

V. C. Summer Cycle 22 May 2014 Figure 1. Moderator Temperature Coefficient Versus Power Level V.C. Summer - Cycle 22 1.00 0.90 0.80 LI "i 0.70 0

a 0.60 0

o 0

0.50 ME0.40 zS0.40 0

0 c-I-

0.20 0.10 0.00 0 10 20 30 40 50 60 70 80 90 100 Percent of Rated Thermal Power 7 Revision 1

V. C. Summer Cycle 22 May 2014 Figure 2. Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation V. C. Summer - Cycle 22 230 220 210 200 190 180 170 160 r- 150 0

4,m 140 0 130 2.,

120 (0 110 L- 100 0

-o 90

-a 80 0

70 60 50 40 30 20 10 0

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction Of Rated Thermal Power 8 Revision I

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Figure 3. Axial Flux Difference Limits as a Function of Rated Thermal Power V. C. Summer - Cycle 22 120 100 80 0

0~

60 a.-

40 20 0

-40 -30 -20 -10 0 10 20 30 40 Axial Flux Difference (%AI) 9 Revision 1

V. C. Surnmer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Figure 4. K(z) - Normalized FQ(z) as a Function of Core Height V. C. Summer - Cycle 22 1.101 1 1 11 11 (0.0,1.0),1.0) 1.00 (12.0,0.925) 0.90 0.80 0.70 4,,

I-

. 0.60

.N E 0.50 0

N0.40 0.30 0.20 0.10 0.00 0 2 4 6 8 10 12 Bottom Core Height (Feet) Top 10 Revision 1

V. C. Summer Cycle 22 May 2014 Table 1. RAOC W(z) at 150 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.244 6.140 1.117 0.140 1.243 6.279 1.121 0.279 1.248 6.419 1.126 0.419 1.260 6.558 1.130 0.558 1.275 6.698 1.134 0.698 1.282 6.837 1.137 0.837 1.279 6.977 1.140 0.977 1.274 7.116 1.143 1.116 1.269 7.256 1.145 1.256 1.261 7.395 1.146 1.395 1.253 7.535 1.147 1.535 1.243 7.674 1.147 1.674 1.233 7.814 1.146 1.814 1.222 7.953 1.145 1.953 1.213 8.093 1.144 2.093 1.204 8.233 1.142 2.233 1.195 8.372 1.139 2.372 1.185 8.512 1.135

.2.512 1.176 8.651 1.130 2.651 1.167 8.791 1.125 2.791 1.157 8.930 1.122 2.930 1.148 9.070 1.122 3.070 1.142 9.209 1.122 3.209 1.138 9.349 1.127 3.349 1.135 9.488 1.132 3.488 1.133 9.628 1.139 3.628 1.131 9.767 1.144 3.767 1.129 9.907 1.150 3.907 1.125 10.046 1.154 4.046 1.122 10.186 1.158 4.186 1.118 10.326 1.162 4.326 1.115 10.465 1.164 4.465 1.112 10.605 1.166 4.605 1.110 10.744 1.167 4.744 1.108 10.884 1.167 4.884 1.106 11.023 1.165 5.023 1.105 11.163 1.168 5.163 1.103 11.302 1.188 5.302 1.102 11.442 1.185 5.442 1.102 11.581 1.171 5.581 1.103 11.721 1.140 5.721 1.105 11.860 1.105 5.860 1.108 12.000 1.071 6.000 1.112 I1I Revision 1

V. C. Summer Cycle 22 May 2014 Table 2. RAOC W(z) at 3000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.408 6.140 1.112 0.140 1.407 6.279 1.120 0.279 1.410 6.419 1.125 0.419 1.417 6.558 1.131 0.558 1.427 6.698 1.135 0.698 1.428 6.837 1.140 0.837 1.421 6.977 1.144 0.977 1.411 7.116 1.147 1.116 1.401 7.256 1.150 1.256 1.388 7.395 1.152 1.395 1.373 7.535 1.154 1.535 1.356 7.674 1.155 1.674 1.339 7.814 1.155 1.814 1.321 7.953 1.155 1.953 1.302 8.093 1.154 2.093 1.282 8.233 1.153 2.233 1.262 8.372 1.150 2.372 1.242 8.512 1.147 2.512 1.223 8.651 1.142 2.651 1.203 8.791 1.138 2.791 1.182 8.930 1.139 2.930 1.165 9.070 1.146 3.070 1.154 9.209 1.153 3.209 1.148 9.349 1.159 3.349 1.145 9.488 1.164 3.488 1.143 9.628 1.169 3.628 1.142 9.767 1.171 3.767 1.140 9.907 1.173 3.907 1.138 10.046 1.176 4.046 1.136 10.186 1.181 4.186 1.133 10.326 1.188 4.326 1.131 10.465 1.195 4.465 1.129 10.605 1.200 4.605 1.127 10.744 1.205 4.744 1.124 10.884 1.209 4.884 1.122 11.023 1.211 5.023 1.119 11.163 1.213 5.163 1.115 11.302 1.212 5.302 1.112 11.442 1.209 5.442 1.108 11.581 1.196 5.581 1.104 11.721 1.179 5.721 1.100 11.860 1.160 5.860 1.100 12.000 1.137 6.000 1.105 12 Revision 1

V. C. Summer Cycle 22 May 2014 Table 3. RAOC W(z) at 5000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.330 6.140 1.109 0.140 1.328 6.279 1.117 0.279 1.331 6.419 1.125 0.419 1.338 6.558 1.131 0.558 1.348 6.698 1.137 0.698 1.349 6.837 1.143 0.837 1.343 6.977 1.148 0.977 1.335 7.116 1.153 1.116 1.326 7.256 1.157 1.256 1.315 7.395 1.161 1.395 1.302 7.535 1.163 1.535 1.287 7.674 1.166 1.674 1.272 7.814 1.167 1.814 1.256 7.953 1.168 1.953 1.239 8.093 1.168 2.093 1.222 8.233 1.168 2.233 1.205 8.372 1.167 2.372 1.187 8.512 1.164 2.512 1.169 8.651 1.160 2.651 1.153 8.791 1.160 2.791 1.142 8.930 1.160 2.930 1.134 9.070 1.168 3.070 1.125 9.209 1.177 3.209 1.119 9.349 1.184 3.349 1.116 9.488 1.190 3.488 1.115 9.628 1.196 3.628 1.114 9.767 1.199 3.767 1.112 9.907 1.202 3.907 1.110 10.046 1.205 4.046 1.108 10.186 1.209 4.186 1.105 10.326 1.217 4.326 1.102 10.465 1.225 4.465 1.099 10.605 1.231 4.605 1.096 10.744 1.237 4.744 1.093 10.884 1.241 4.884 1.089 11.023 1.244 5.023 1.087 11.163 1.246 5.163 1.086 11.302 1.246 5.302 1.086 11.442 1.243 5.442 1.087 11.581 1.231 5.581 1.088 11.721 1.215 5.721 1.090 11.860 1.196 5.860 1.095 12.000 1.172 6.000 1.101 13 Revision 1

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Table 4. RAOC W(z) at 8000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.289 6.140 1.110 0.140 1.287 6.279 1.121 0.279 1.290 6.419 1.130 0.419 1.298 6.558 1.138 0.558 1.308 6.698 1.146 0.698 1.309 6.837 1.154 0.837 1.304 6.977 1.161 0.977 1.297 7.116 1.167 1.116 1.289 7.256 1.173 1.256 1.279 7.395 1.178 1.395 1.266 7.535 1.183 1.535 1.253 7.674 1.187 1.674 1.239 7.814 1.190 1.814 1.223 7.953 1.192 1.953 1.208 8.093 1.194 2.093 1.192 8.233 1.195 2.233 1.175 8.372 1.195 2.372 1.159 8.512 1.194 2.512 1.143 8.651 1.191 2.651 1.127 .8.791 1.190 2.791 1.111 8.930 1.190 2.930 1.097 9.070 1.196 3.070 1.085 9.209 1.204 3.209 1.078 9.349 1.212 3.349 1.077 9.488 1.220 3.488 1.077 9.628 1.228 3.628 1.077 9.767 1.235 3.767 1.077 9.907 1.240 3.907 1.077 10.046 1.245 4.046 1.077 10.186 1.248 4.186 1.079 10.326 1.250 4.326 1.081 10.465 1.254 4.465 1.082 10.605 1.261 4.605 1.083 10.744 1.267 4.744 1.084 10.884 1.271 4.884 1.085 11.023 1.274 5.023 1.086 11.163 1.275 5.163 1.086 11.302 1.275 5.302 1.087 11.442 1.272 5.442 1.087 11.581 1.260 5.581 1.088 11.721 1.244 5.721 1.089 11.860 1.224 5.860 1.091 12.000 1.200 6.000 1.099 14 Revision 1

V. C. Summer Cycle 22 May 2014 Table 5. RAOC W(z) at 10000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.246 6.140 1.118 0.140 1.244 6.279 1.128 0.279 1.248 6.419 1.137 0.419 1.256 6.558 1.146 0.558 1.267 6.698 1.154 0.698 1.270 6.837 1.161 0.837 1.266 6.977 1.168 0.977 1.260 7.116 1.175 1.116 1.253 7.256 1.181 1.256 1.244 7.395 1.186 1.395 1.234 7.535 1.190 1.535 1.222 7.674 1.194 1.674 1.209 7.814 1.197 1.814 1.195 7.953 1.199 1.953 1.181 8.093 1.200 2.093 1.167 8.233 1.201 2.233 1.153 8.372 1.201 2.372 1.138 8.512 1.199 2.512 1.124 8.651 1.196 2.651 1.109 8.791 1.193 2.791 1.094 8.930 1.193 2.930 1.084 9.070 1.196 3.070 1.084 9.209 1.202 3.209 1.084 9.349 1.210 3.349 1.083 9.488 1.218 3.488 1.082 9.628 1.225 3.628 1.082 9.767 1.231 3.767 1.082 9.907 1.235 3.907 1.082 10.046 1.239 4.046 1.083 10.186 1.241 4.186 1.084 10.326 1.243 4.326 1.085 10.465 1.246 4.465 1.086 10.605 1.252 4.605 1.087 10.744 1.257 4.744 1.088 10.884 1.261 4.884 1.088 11.023 1.263 5.023 1.088 11.163 1.264 5.163 1.088 11.302 1.263 5.302 1.088 11.442 1.259 5.442 1.088 11.581 1.246 5.581 1.089 11.721 1.230 5.721 1.092 11.860 1.210 5.860 1.098 12.000 1.186 6.000 1.107 15 Revision I

V. C. Summer Cycle 22 May 2014 Table 6. RAOC W(z) at 14000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.172 6.140 1.121 0.140 1.171 6.279 1.130 0.279 1.175 6.419 1.138 0.419 1.186 6.558 1.145 0.558 1.199 6.698 1.152 0.698 1.205 6.837 1.159 0.837 1.205 6.977 1.165 0.977 1.203 7.116 1.170 1.116 1.199 7.256 1.175 1.256 1.193 7.395 1.179 1.395 1.186 7.535 1.182 1.535 1.179 7.674 1.184 1.674 1.170 7.814 1.186 1.814 1.161 7.953 1.187 1.953 1.152 8.093 1.188 2.093 1.142 8.233 1.187 2.233 1.133 8.372 1.186

.2.372 1.123 8.512 1.184 2.512 1.114 8.651 1.180 2.651 1.104 8.791 1.177 2.791 1.094 8.930 1.177 2.930 1.086 9.070 1.180 3.070 1.081 9.209 1.183 3.209 1.079 9.349 1.192 3.349 1.081 9.488 1.201 3.488 1.082 9.628 1.210 3.628 1.084 9.767 1.218 3.767 1.085 9.907 1.225 3.907 1.087 10.046 1.232 4.046 1.089 10.186 1.238 4.186 1.092 10.326 1.243 4.326 1.095 10.465 1.248 4.465 1.097 10.605 1.251 4.605 1.099 10.744 1.253 4.744 1.101 10.884 1.253 4.884 1.103 11.023 1.253 5.023 1.104 11.163 1.251 5.163 1.105 11.302 1.247 5.302 1.106 11.442 1.238 5.442 1.106 11.581 1.222 5.581 1.107 11.721 1.205 5.721 1.107 11.860 1.184 5.860 1.108 12.000 1.161 6.000 1.113 16 Revision 1

V. C. Summer Cycle 22 May 2014 Table 7. RAOC W(z) at 20000 MWD/MTU V. C. Summer - Cvcle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.153 6.140 1.177 0.140 1.150 6.279 1.186 0.279 1.155 6.419 1.194 0.419 1.166 6.558 1.201 0.558 1.181 6.698 1.207 0.698 1.188 6.837 1.212 0.837 1.188 6.977 1.217 0.977 1.187 7.116 1.220 1.116 1.183 7.256 1.223 1.256 1.178 7.395 1.225 1.395 1.171 7.535 1.225 1.535 1.164 7.674 1.225 1.674 1.155 7.814 1.224 1.814 1.147 7.953 1.222 1.953 1.138 8.093 1.219 2.093 1.128 8.233 1.214 2.233 1.119 8.372 1.209 2.372 1.109 8.512 1.206 2.512 1.100 8.651 1.204 2.651 1.090 8.791 1.203 2.791 1.081 8.930 1.201 2.930 1.073 9.070 1.197 3.070 1.069 9.209 1.194 3.209 1.068 9.349 1.194 3.349 1.073 9.488 1.194 3.488 1.080 9.628 1.193 3.628 1.087 9.767 1.194 3.767 1.094 9.907 1.197 3.907 1.100 10.046 1.202 4.046 1.105 10.186 1.207 4.186 1.111 10.326 1.211 4.326 1.117 10.465 1.214 4.465 1.122 10.605 1.217 4.605 1.126 10.744 1.219 4.744 1.130 10.884 1.221 4.884 1.134 11.023 1.221 5.023 1.137 11.163 1.219 5.163 1.139 11.302 1.215 5.302 1.141 11.442 1.209 5.442 1.143 11.581 1.192 5.581 1.146 11.721 1.172 5.721 1.151 11.860 1.151 5.860 1.157 12.000 1.127 6.000 1.166 1 17 Revision 1

V. C. Summer Cycle 22 May 2014 Table 8. RAOC FQ Margin Decreases in Excess of 2% Per 31 EFPD - Cycle 22 Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Margin 665 1.0200 836 1.0200 1008 1.0251 1179 1.0248 1351 1.0242 1522 1.0231 1694 1.0216 1866 1.0200 2037 1.0200 2209 1.0200 2380 1.0200 2552 1.0200 2723 1.0200 2895 1.0200 3067 1.0200 3238 1.0200 3410 1.0200 3581 1.0200 6841 1.0200 7012 1.0213 7184 1.0235 7356 1.0254 7527 1.0231 7699 1.0200 Note: All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.2e. Linear interpolation is adequate for intermediate cycle burnups.

18 Revision I

V. C. Summer Cycle 22 May 2014 Table 9. BASELOAD W(z) at 150 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.113 6.140 1.062 0.140 1.114 6.279 1.060 0.279 1.115 6.419 1.058 0.419 1.116 6.558 1.057 0.558 1.118 6.698 1.055 0.698 1.118 6.837 1.055 0.837 1.118 6.977 1.054 0.977 1.118 7.116 1.056 1.116 1.117 7.256 1.058 1.256 1.117 7.395 1.060 1.395 1.116 7.535 1.062 1.535 1.114 7.674 1.064 1.674 1.113 7.814 1.065 1.814 1.112 7.953 1.067 1.953 1.110 8.093 1.069 2.093 1.108 8.233 1.070 2.233 1.106 8.372 1.072 2.372 1.104 8.512 1.073 2.512 1.102 8.651 1.074 2.651 1.099 8.791 1.076 2.791 1.097 8.930 1.077 2.930 1.094 9.070 1.078 3.070 1.091 9.209 1.079 3.209 1.088 9.349 1.080 3.349 1.086 9.488 1.081 3.488 1.084 9.628 1.082 3.628 1.082 9.767 1.083 3.767 1.081 9.907 1.084 3.907 1.079 10.046 1.085 4.046 1.078 10.186 1.085 4.186 1.077 10.326 1.086 4.326 1.075 10.465 1.087 4.465 1.074 10.605 1.088 4.605 1.074 10.744 1.088 4.744 1.073 10.884 1.089 4.884 1.072 11.023 1.089 5.023 1.071 11.163 1.090 5.163 1.071 11.302 1.090 5.302 1.070 11.442 1.091 5.442 1.069 11.581 1.090 5.581 1.068 11.721 1.090 5.721 1.066 11.860 1.090 5.860 1.065 12.000 1.090 6.000 1.064 1 19 Revision I

V. C. Summer Cycle 22 May 2014 Table 10. BASELOAD W(z) at 3000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.098 6.140 1.058 0.140 1.098 6.279 1.057 0.279 1.098 6.419 1.056 0.419 1.099 6.558 1.054 0.558 1.101 6.698 1.052 0.698 1.102 6.837 1.050 0.837 1.102 6.977 1.048 0.977 1.103 7.116 1.049 1.116 1.103 7.256 1.049 1.256 1.103 7.395 1.050 1.395 1.103 7.535 1.052 1.535 1.103 7.674 1.054 1.674 1.103 7.814 1.056 1.814 1.102 7.953 1.058 1.953 1.102 8.093 1.060 2.093 1.101 8.233 1.062 2.233 1.100 8.372 1.064 2.372 1.099 8.512 1.066 2.512 1.098 8.651 1.067 2.651 1.097 8.791 1.069 2.791 1.096 8.-930 1.071 2.930 1.094 9.070 1.072 3.070 1.093 9.209 1.074 3.209 1.091 9.349 1.075 3.349 1.089 9.488 1.077 3.488 1.087 9.628 1.078 3.628 1.085 9.767 1.080 3.767 1.084 9.907 1.081 3.907 1.082 10.046 1.082 4.046 1.081 10.186 1.083 4.186 1.080 10.326 1.084 4.326 1.078 10.465 1.086 4.465 1.077 10.605 1.087 4.605 1.076 10.744 1.088 4.744 1.074 10.884 1.089 4.884 1.073 11.023 1.090 5.023 1.071 11.163 1.090 5.163 1.069 11.302 1.091 5.302 1.067 11.442 1.092 5.442 1.065 11.581 1.092 5.581 1.064 11.721 1.091 5.721 1.062 11.860 1.092 5.860 1.061 12.000 1.092 6.000 1.060 20 Revision I

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Table 11. BASELOAD W(z) at 5000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z)

O.000 1.097 6.140 1.057 0.140 1.097 6.279 1.056 0.279 1.097 6.419 1.054 0.419 1.099 6.558 1.053 0.558 1.101 6.698 1.050

0. 698 1.102 6.837 1.048 0.837 1.102 6.977 1.047 0.977 1.103 7.116 1.047 1.116 1.103 7.256 1.049 1.256 1.103 7.395 1.051 1.395 1.103 7.535 1.053 1.535 1.103 7.674 1.055 1.674 1.103 7.814 1.057 1.814 1.103 7.953 1.059 1.953 1.102 8.093 1.061 2.093 1.101 8.233 1.063 2.233 1.101 8.372 1.064 2.372 1.100 8.512 1.066 2.512 1.099 8.651 1.068 2.651 1.097 8.791 1.069 2.791 1.096 8.930 1.071 2.930 1.094 9.070 1.073 3.070 1.093 9.209 1.074 3.209 1.091 9.349 1.075 3.349 1.089 9.488 1.077 3.488 1.087 9.628 1.078 3.628 1.085 9.767 1.079 3.767 1.084 9.907 1.081 3.907 1.082 10.046 1.082 4.046 1.080 10.186 1.083 4.186 1.079 10.326 1.084 4.326 1.078 10.465 1.085 4.465 1.077 10.605 1.087 4.605 1.075 10.744 1.088 4.744 1.073 10.884 1.089 4.884 1.072 11.023 1.089 5.023 1.070 11.163 1.090 5.163 1.068 11.302 1.091 5.302 1.066 11.442 1.092 5.442 1.065 11.581 1.092 5.581 1.063 11.721 1.091 5.721 1.061 11.860 1.092 5.860 1.059 12.000 1.092 6.000 1.058 21 Revision 1

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Table 12. BASELOAD W(z) at 8000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.103 6.140 1.058 0.140 1.104 6.279 1.056 0.279 1.105 6.419 1.054 0.419 1.106 6.558 1.052 0.558 1.108 6.698 1.051 0.698 1.109 6.837 1.051 0.837 1.110 6.977 1.051 0.977 1.110 7.116 1.052 1.116 1.110 7.256 1.054 1.256 1.110 7.395 1.057 1.395 1.110 7.535 1.059 1.535 1.109 7.674 1.060 1.674 1.109 7.814 1.062 1.814 1.108 7.953 1.064 1.953 1.107 8.093 1.065 2.093 1.106 8.233 1.067 2.233 1.105 8.372 1.068 2.372 1.103 8.512 1.070 2.512 1.102 8.651 1.071 2.651 1.100 8.791 1.073 2.791 1.098 8.930 1.074 2.930 1.096 9.070 1.075 3.070 1.093 9.209 1.076 3.209 1.091 9.349 1.077 3.349 1.088 9.488 1.079 3.488 1.086 9.628 1.080 3.628 1.083 9.767 1.081 3.767 1.082 9.907 1.082 3.907 1.080 10.046 1.083 4.046 1.079 10.186 1.084 4.186 1.077 10.326 1.085 4.326 1.076 10.465 1.085 4.465 1.074 10.605 1.086 4.605 1.072 10.744 1.087 4.744 1.071 10.884 1.088 4.884 1.069 11.023 1.089 5.023 1.067 11.163 1.090 5.163 1.066 11.302 1.090 5.302 1.065 11.442 1.091 5.442 1.064 11.581 1.091 5.581 1.063 11.721 1.091 5.721 1.062 11.860 1.091 5.860 1.060 12.000 1.091 6.000 1.059 22 Revision I

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Table 13. BASELOAD W(z) at 10000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.107 6.140 1.059 0.140 1.108 6.279 1.057 0.279 1.109 6.419 1.054 0.419 1.110 6.558 1.053 0.558 1.112 6.698 1.053 0.698 1.113 6.837 1.054 0.837 1.113 6.977 1.055 0.977 1.113 7.116 1.057 1.116 1.113 7.256 1.059 1.256 1.113 7.395 1.061 1.395 1.113 7.535 1.063 1.535 1.112 7.674 1.064 1.674 1.112 7.814 1.066 1.814 1.111 7.953 1.067 1.953 1.110 8.093 1.069 2.093 1.108 8.233 1.070 2.233 1.107 8.372 1.071

.2.372 1.105 8.512 1.073 2.512 1.103 8.651 1.074 2.651 1.101 8.791 1.075 2.791 1.098 8.930 1.076 2.930 1.096 9.070 1.077 3.070 1.093 9.209 1.078 3.209 1.090 9.349 1.079 3.349 1.087 9.488 1.080 3.488 1.084 9.628 1.080 3.628 1.082 9.767 1.081 3.767 1.080 9.907 1.082 3.907 1.079 10.046 1.083 4.046 1.077 10.186 1.084 4.186 1.076 10.326 1.084 4.326 1.075 10.465 1.085 4.465 1.074 10.605 1.086 4.605 1.073 10.744 1.087 4.744 1.073 10.884 1.087 4.884 1.071 11.023 1.088 5.023 1.070 11.163 1.089 5.163 1.069 11.302 1.089 5.302 1.068 11.442 1.090 5.442 1.067 11.581 1.089 5.581 1.065 11.721 1.089 5.721 1.064 11.860 1.089 5.860 1.062 12.000 1.090 6.000 1.061 23 Revision I

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Table 14. BASELOAD W(z) at 14000 MWDIMTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.122 6.140 1.059 0.140 1.123 6.279 1.058 0.279 1.124 6.419 1.059 0.419 1.125 6.558 1.059 0.558 1.126 6.698 1.060 0.698 1.127 6.837 1.062 0.837 1.127 6.977 1.064 0.977 1.127 7.116 1.066 1.116 1.127 7.256 1.068 1.256 1.126 7.395 1.069 1.395 1.125 7.535 1.071 1.535 1.124 7.674 1.072 1.674 1.122 7.814 1.073 1.814 1.121 7.953 1.074 1.953 1.119 8.093 1.075 2.093 1.116 8.233 1.076 2.233 1.114 8.372 1.077 2.372 1.111 8.512 1.078 2:512 1.108 8.651 1.078 2.651 1.104 8.791 1.079 2.791 1.101 8.930 1.080.

2.930 1.097 9.070. 1.082 3.070 1.093 9.209 1.085 3.209 1.089 9.349 1.087 3.349 1.086 9.488 1.089 3.488 1.083 9.628 1.091 3.628 1.081 9.767 1.093 3.767 1.079 9.907 1.095 3.907 1.078 10.046 1.096 4.046 1.077 10.186 1.098 4.186 1.075 10.326 1.099 4.326 1.074 10.465 1.100 4.465 1.073 10.605 1.101 4.605 1.072 10.744 1.101 4.744 1.072 10.884 1.102 4.884 1.071 11.023 1.102 5.023 1.070 11.163 1.102 5.163 1.069 11.302 1.102 5.302 1.068 11.442 1.102 5.442 1.067 11.581 1.101 5.581 1.066 11.721 1.099 5.721 1.064 11.860 1.098 5.860 1.063 12.000 1.098 6.000 1.061 1 24 Revision I

V. C. Summer Cycle 22 May 2014 Table 15. BASELOAD W(z) at 20000 MWD/MTU V. C. Summer - Cycle 22 Core Height (ft) W(z) Core Height (ft) W(z) 0.000 1.146 6.140 1.063 0.140 1.147 6.279 1.065 0.279 1.148 6.419 1.067 0.419 1.149 6.558 1.068 0.558 1.150 6.698 1.070 0.698 1.150 6.837 1.072 0.837 1.149 6.977 1.073 0.977 1.148 7.116 1.074 1.116 1.147 7.256 1.075 1.256 1.146 7.395 1.076 1.395 1.143 7.535 1.077 1.535 1.141 7.674 1.077 1.674 1.138 7.814 1.078 1.814 1.134 7.953 1.078 1.953 1.131 8.093 1.078 2.093 1.127 8.233 1.079 2.233 1.122 8.372 1.079 2.372 1.118 8.512 1.079 2.512 1.113 8.651 1.080 2.651 1.107 8.791 1.082 2.791 1.102 8.930 1.084 2.930 1.096 9.070 1.086 3.070 1.090 9.209 1.088 3.209 1.085 9.349 1.090 3.349 1.082 9.488 1.092 3.488 1.081 9.628 1.093 3.628 1.080 9.767 1.095 3.767 1.079 9.907 1.096 3.907 1.077 10.046 1.097 4.046 1.076 10.186 1.098 4.186 1.074 10.326 1.098 4.326 1.073 10.465 1.099 4.465 1.071 10.605 1.099 4.605 1.070 10.744 1.099 4.744 1.070 10.884 1.099 4.884 1.069 11.023 1.099 5.023 1.068 11.163 1.099 5.163 1.067 11.302 1.099 5.302 1.066 11.442 1.098 5.442 1.065 11.581 1.097 5.581 1.063 11.721 1.096 5.721 1.061 11.860 1.095 5.860 1.061 12.000 1.094 6.000 1.062 25 Revision I

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Table 16. BASE LOAD FQ Margin Decreases in Excess of 2% Per 31 EFPD - Cycle 22 Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Margin 1352 1.0200 1523 1.0200 1695 1.0242 1867 1.0286 2038 1.0321 2210 1.0351 2382 1.0336 2553 1.0320 2725 1.0303 2896 1.0288 3068 1.0274 3240 1.0263 3411 1.0255 3583 1.0250 3755 1.0248 3926 1.0248 4098 1.0252 4270 1.0253 4441 1.0254 4613 1.0251 4785 1.0244 4956 1.0233 5128 1.022 5300 1.0205 Note: All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.4e. Linear interpolation is adequate for intermediate cycle burnups.

26 Revision I

V. C. Summer Cycle 22 May 2014 V. C. Summer Cycle 22 May 2014 Figure 5. RCS Total Flowrate vs. R for Three Loop Operation V. C. Summer - Cycle 22 3 0 .0 . .. .

29 .8 . .. . .

29.6 6 --. . .

29.4 , , ,

- _iIi i S29.2 ...

,d - - - [ i ~nL 0 29.0 --

U: Acceptable Operation Unacepabl Unacceptable 290Region - Operation Region I-l

  • 0 - [] -- I_ -I 28.8 2 8 .6 - ' - . . . .

- -- I - - - - I- ,

28.4 ' ] [ 1...

. . . . . (1.00, 28.36) 28.2 ....

28.0 0 -----

0.90 0.95 1.00 1.05 1.10 R = FN-delta-HI1.62[1.0 + 0.3(1.0 - P)]

Measurement Uncertainty of 2.1 % for Flow (includes 0.1 % for feedwater venturi fouling) is included in this figure.

27 Revision I