UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 10, 2014
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3-WITHDRAWAL OF AMERICAN SOCIETY OF MECHANICAL ENGINEERS, SECTION XI CODE, INSERVICE INSPECTION (lSI) PROGRAM, REQUEST FOR RELIEF ISI-44 (TAG NOS. MF3538, MF3539, AND MF3540)
Dear Mr. Shea:
By letter dated February 11, 2014, Tennessee Valley Authority (TVA, licensee) submitted a relief request for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 for certain full penetration welds included in the BFN intergranular stress corrosion cracking augmented inspection program. The relief was requested for BFN Units 1, 2, and 3 ten-year Inspection Intervals, which began on June 2, 2008, May 25, 2011, and November 19, 2005, respectively.
During a conference call between TVA and the Nuclear Regulatory Commission (NRC), the NRC staff stated that the licensee's augmented inspection program is described in the BFN's Updated Final Safety Analysis Report, Appendix 0, Section 0.1.1 0 "Boiling Water Reactor Stress Corrosion Cracking Program" and is not an American Society of Mechanical Engineers Code requirement. Therefore, the NRC staff does not have authority to grant relief under Title 10 of Code of Federal Regulations, Section 50.55a(g)(6)(i) for these augmented inspections. As a result of that discussion, TVA decided to pursue corrective actions through alternate means.
Subsequently, by "CNL-14-038, Tennessee Valley Authoritys Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Acci|letter dated March 31, 2014]], TVA withdrew the relief request.
The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.
Docket Nos. 50-259, 50-260, and 50-296 cc: Distribution via Listserv Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Mr. Joseph W. Shea Vice President - Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 April10, 2014
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3-WITHDRAWAL OF AMERICAN SOCIETY OF MECHANICAL ENGINEERS, SECTION XI CODE, INSERVICE INSPECTION (lSI) PROGRAM, REQUEST FOR RELIEF ISI-44 (TAC NOS. MF3538, MF3539, AND MF3540)
Dear Mr. Shea:
By letter dated February 11, 2014, Tennessee Valley Authority (TVA, licensee) submitted a relief request for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 for certain full penetration welds included in the BFN intergranular stress corrosion cracking augmented inspection program. The relief was requested for BFN Units 1, 2, and 3 ten-year Inspection Intervals, which began on June 2, 2008, May 25, 2011, and November 19, 2005, respectively.
During a conference call between TVA and the Nuclear Regulatory Commission (NRC), the NRC staff stated that the licensee's augmented inspection program is described in the BFN's Updated Final Safety Analysis Report, Appendix 0, Section 0.1.1 0 "Boiling Water Reactor Stress Corrosion Cracking Program" and is not an American Society of Mechanical Engineers Code requirement. Therefore, the NRC staff does not have authority to grant relief under Title 10 of Code of Federal Regulations, Section 50.55a(g)(6)(i) for these augmented inspections. As a result of that discussion, TVA decided to pursue corrective actions through alternate means.
Subsequently, by "CNL-14-038, Tennessee Valley Authoritys Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Acci|letter dated March 31, 2014]], TVA withdrew the relief request.
The purpose of this letter is to advise that the above-cited relief request is being treated as withdrawn.
Sincerely, IRA/
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsN rrDorl Lpl2 -2 RidsNrrLABCiayton LPL2-2 R/F RidsNrrPMBrownsFerry RidsNrrDeEpnb RidsNrrDoriDpr Resource RidsRgn2MaiiCenter SCumblidge, NRR ADAMS Accession No.: ML14094A036 OFFICE LPL2-2/PM LPL2-2/LA DE/EPNB/BC LPL2-2/BC NAME FSaba BCiayton TLupold JQuichocho DATE 4/10/14 4/10/14 4/10/14 4/10/14 OFFICIAL AGENCY RECORD