ML14093A929
| ML14093A929 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/31/2014 |
| From: | Polson K Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML14093A929 (2) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 March 31, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 10 CFR 50.4 10 CFR 50.55a Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Withdrawal of ASME Society of Engineers, Section Xl Code, Inservice Inspection Program for the Unit 1 Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval, Unit 3 Third Ten-Year Inspection Interval, Request for Relief ISI-44
Reference:
Letter from TVA to NRC, "ASME Society of Engineers, Section Xl Code, Inservice Inspection Program for the Unit 1 Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval, Unit 3 Third Ten-Year Inspection Interval, Request for Relief ISI-44," dated February 11, 2014 (ADAMS Accession No. ML14056A268)
By reference letter dated February 11, 2014, the Tennessee Valley Authority (TVA) submitted a relief request for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3, for certain full penetration welds included in the BFN intergranular stress corrosion cracking (IGSCC) Augmented Inspection Program. Relief had been requested for the BFN, Units 1, 2, and 3, Ten-Year Inspection Intervals, which began June 2, 2008, May 25, 2011, and November 19, 2005, respectively.
A conference call was held between TVA and the Nuclear Regulatory Commission staff on March 25, 2014. As a result of that discussion, TVA has decided to withdraw relief request ISI-44. TVA will pursue corrective actions through alternate means.
0 (4-
U.S. Nuclear Regulatory Commission Page 2 March 31, 2014 There are no new regulatory commitments contained in this submittal. Please address any questions to Mr. Jamie L. Paul at (256) 729-2636.
Respectfully, K. J. Poso Site Vice President cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant