Request for Additional Information Regarding Bulletin 2012-01, Design Vulnerability in Electric Power System
ML14083A614
Person / Time
Site: Seabrook 
Issue date: 03/31/2014
From: John Lamb
Plant Licensing Branch 1
To: Walsh K
NextEra Energy Seabrook
Lamb J
References
BL-12-001, TAC ME9385
Download: ML14083A614 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 31, 2014

SUBJECT:

SEABROOK STATION, UNIT 1-REQUEST FOR ADDITIONAL INFORMATION REGARDING BULLETIN 2012-01, "DESIGN VULNERABILITY IN ELECTRIC POWER SYSTEM" (TAC NO. ME9385)

Dear Mr. Walsh:

On July 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2012-01, "Design Vulnerability in Electric Power System" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12074A115), to all holders of operating licenses and combined licenses for nuclear power reactors.

By letter dated October 22, 2012 (ADAMS Accession No. ML12299A467), NextEra Energy Seabrook, LLC (NextEra) submitted a response to Bulletin 201.2-01 for Seabrook Station, Unit 1 (Seabrook). The NRC sent a request for additional information (RAI) regarding Bulletin 2012-01, by letter dated December 20, 2013 (ADAMS Accession No. ML13351A314). NextEra responaed to the RAI in its letter dated January 29, 2014 (ADAMS Accession No. ML14035A217).

The NRC staff has determined that additional information is required from NextEra regarding Seabrook in order to complete its review. Please provide a written response, signed under oath or affirmation, to the enclosed RAI by April 30, 2014.

If you have any questions regarding this letter, please feel free to contact me at (30 1) 415-31 00 or by e-mail at John.Lamb@nrc.gov.

Docket No. 50-219

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, A~

r. G. Lamb, Senior Project Manager

. lant Licensing Branch 1-2 ivision of Operating Reactor Licensing Office of Nuclear Reactor Regulation

REQUEST FOR ADDITIONAL INFORMATION RELATED TO BULLETIN 2012-01. "DESIGN VULNERABILITY IN ELECTRIC POWER SYSTEM" NEXTERA ENERGY SEABROOK. LLC.

SEABROOK STATION, UNIT 1 DOCKET NO. 50-443 On July 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2012-01, "Design Vulnerability in Electric Power System" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12074A115), to all holders of operating licenses and combined licenses for nuclear power reactors.

By letter dated October 22, 2012 (ADAMS Accession No. ML12299A467), NextEra Energy Seabrook, LLC (NextEra) submitted a response to Bulletin 2012-01 for Seabrook Station, Unit 1 (Seabrook). The NRC sent a request for additional information (RAI) regarding Bulletin 2012-01, by letter dated December 20, 2013 (ADAMS Accession No. ML13351A314). NextEra responded to the RAI in its letter dated January 29, 2014 (ADAMS Accession No. ML14035A217).

The NRC staff has determined that additional information is necessary to complete its review.

REQUEST FOR ADDITIONAL INFORMATION NextEra's response to the NRC staff's RAI regarding Bulletin 2012-01 stated that:

Since a single credible failure that could cause an undetected open phase condition is not a credible event at Seabrook Station, no plant design changes and modifications are being pursued to resolve issues with an open phase of electric power.

Based on the South Texas, Unit 2 and Forsmark, Unit 3 operating events, which identified open phase conditions due to circuit breaker malfunctions, please provide NextEra's engineering assessment as it relates to Seabrook.

Enclosure

ML12299A467), NextEra Energy Seabrook, LLC (NextEra) submitted a response to Bulletin 2012-01 for Seabrook Station, Unit 1 (Seabrook). The NRC sent a request for additional information (RAI) regarding Bulletin 2012-01, by letter dated December 20, 2013 (ADAMS Accession No. ML13351A314). NextEra responded to the RAI in its letter dated January 29, 2014 (ADAMS Accession No. ML14035A217).

The NRC staff has determined that additional information is required from NextEra regarding Seabrook in order to complete its review. Please provide a written response, signed under oath or affirmation, to the enclosed RAI by April 30, 2014.

If you have any questions regarding this letter, please feel free to contact me at (301) 415-3100 or by e-mail at John.Lamb@nrc.gov.

Docket No. 50-219

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNRRDorllpl1-2 Resource RidsNrrDoriDpr Resource RidsAcrsAcnw_MaiiCTR Resource ADAMS Accession No ML14083A614 Sincerely, Ira/

John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPLI-2 R/F RidsNrrPMSeabrook Resource RidsRgn1 Mail Center Resource RidsNrrLAABaxter Resource RMathew, NRR

  • via email OFFICE NRR/LPL 1-2/PM NRR/LPL 1-2/LAit NRR/LPL 1-2/LA NRR/EEIB/BC NRR/LPL 1-2/BC NAME Jlamb KBeckford A Baxter JZimmerman MKhanna DATE 3/27/14 3/26/14 3/26/14 3/31/14 3/31/14