ML14069A577
| ML14069A577 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 03/05/2014 |
| From: | Reis T Division of Reactor Safety II |
| To: | Capps S Duke Energy Corp |
| References | |
| Download: ML14069A577 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 5, 2014 Mr. Steven D. Capps Site Vice President Duke Energy Corporation McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR MCGUIRE NUCLEAR STATION
Dear Mr. Capps:
In a letter dated September 4, 2013, your staff responded to Regulatory Issue Summary 2013-06 and requested we schedule initial license operator examinations for McGuire Nuclear Station. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant /
Station 2014 2015 2016 Date Applicants Date Applicants Date Applicants McGuire 8/11 12 4/27 12 3/7 12 On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm T. Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Eugene F. Guthrie, Chief, Operations Branch II at 404-997-4662.
S. Capps 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Terrence Reis, Director Division of Reactor Safety Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 cc: Distribution via Listserv
__ML14069A577_______
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE
- DXB2 MTW GXG MSM NAME DBACON MWIDMANN EGUTHRIE MMILLER DATE 2/19/2014 3/3/2014 3/ 3/2014 3/4/2014 3/ /2014 3/ /2014 3/ /2014 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Letter to Steven D. Capps from Terrence Reis dated March 5, 2014.
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR MCGUIRE NUCLEAR STATION Distribution:
RIDSNRRDIRS PUBLIC RidsNrrPMMcGuire Resource ORA, RII T. Reis M. Miller M. Widmann G. Guthrie D. Bacon J. Vincent J. Kirby G. McCoy J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing