Entergy Operations, Inc.

River Bend Station St.5485 U.S. Highway 617N St. Francisville, LA 70775 February 20, 2014 RBG-47439 Mr. Rob Kuntz Mail Stop 11F1 Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, MD 20852 RBFI-14-0026

Subject:

Withdrawal of Request for NRC Assistance River Bend Station - Unit I Docket No. 50-458 License No. NPF-47

References:

1. NRC Letter to Entergy, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (RBC-51012) (ADAMS Accession No. ML12053A340)
2. Entergy Letter to NRC, Assistance in Obtaining Information on Dams, dated September 30, 2013 (RBG-47394) (ADAMS Accession No. ML13277A357)

Dear Mr. Kuntz:

Entergy Operations, Inc. (Entergy) is re-evaluating flooding hazards at its nuclear power plant sites for the purpose of responding to the March 2012 request for information (RFI)

(Reference 1.). As part of this effort, Entergy initially contacted several districts of the United States (U.S.) Army Corps of Engineers (Corps). These conversations revealed that obtaining the information directly from the Corps is not possible due to its sensitive nature. By way of Reference 2, Entergy requested the assistance of the NRC in obtaining this information.

Subsequent development of the flood hazard analysis for River Bend Station has determined that there is no credible scenario in which the failure of any dam on the Mississippi River or its tributaries will have adverse effects on the site. This letter is being provided to withdraw the request for assistance.

If you have any questions on this topic, please contact me at 225-381-4177.

Sini Joseph A. Clark Manager - Regulatory Assurance A 0\\o

RBG-47439 February 20, 2014 Page 2 of 2 cc:

U.S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Central Records Clerk Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Mr. Alan Wang, Project Manager U.S. Nuclear Regulatory Commission MS 0-8B1 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission Attn: Mr. Chris Cook Two White Flint North MS 7-F3 11555 Rockville Pike Rockville, MD 20852

'ý Enterigy Entergy Operations, Inc.

River Bend Station 5485 U. S. Highway 61 N St. Francisville, LA 70775 U.S.. Nuclear"Rej6ato-r Commission

,s..Document Control Desk

-11555 Rockville Pike Wa:.washington,' DC 20852-2738