ML14052A216

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report for Unit 1, Cycle 21
ML14052A216
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/17/2014
From: Robinson K
Calvert Cliffs, Constellation Energy Group, EDF Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14052A216 (23)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of Consteation eDF EnergyZ3 CALVERT CLIFFS NUCLEAR POWER PLANT February 17, 2014 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No. 1; Docket No. 50-317 Core Operating Limits Report for Unit 1, Cycle 21 Pursuant to Calvert Cliffs Nuclear Power Plant Technical Specification 5.6.5, the attached Core Operating Limits Report for Unit 1, Cycle 21, Revision 1 (Attachment 1), is provided for your records.

Please replace the Unit 1 Core Operating Limits Report in its entirety, with the attached Revision 1.

Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.

Very truly yours, Manager - Engineering Services KFR/PSF/bjd

Attachment:

(1) Core Operating Limits Report for Unit 1, Cycle 21, Revision 1 cc: Resident Inspector, NRC (Without Attachment)

N. S. Morgan, NRC W. M. Dean, NRC S. Gray, DNR DDl

ATTACHMENT (1)

CORE OPERATING LIMITS REPORT FOR UNIT 1, CYCLE 21, REVISION 1 Calvert Cliffs Nuclear Power Plant, LLC February 17, 2014

C ENG .....

Calvert Cliffs Nuclear Power Plant Core Operating Limits Report (COLR)

Unit 1 Cycle 21 Revision 1 I Effective Date:

qk/~eL,~~ AAIV l*l1 l RESPONSIBLE ENGINEER / DATE INDEPENDENT REVIEWER / DATE 7-% V*_R CORE DESIGN / DATE

CORE OPERATING LIMITS REPORT CALVERT CLIFFS UNIT 1, CYCLE 21 The following limits are included in this Core Operating Limits Report:

Specification Title Page Introduction .......................................................................................................... 4 Definitions ......................................................................................................... 5 Licensing Restrictions ............................................................................................. 6 3.1.1 Shutdown M argin (SDM) ...................................................................................... 8 3.1.3 Moderator Temperature Coefficient (M TC) .......................................................... 8 3.1.4 Control Element Assembly (CEA) Alignment ...................................................... 8 3.1.6 Regulating Control Element Assembly (CEA) Insertion Limits ........................... 8 3.2.1 Linear Heat Rate (LHR) ......................................................................................... 8 3.2.3 Total Integrated Radial Peaking Factor (FT) ........................................................... 9 3.2.5 Axial Shape Index (ASI) ........................................................................................ 9 3.3.1 Reactor Protective System (RPS) Instrumentation - Operating .............................. 9 3.4.1 RCS Pressure, Temperature, and Flow DNB Limits .............................................. 9 3.9.1 Boron Concentration ............................................................................................. 10 List of Approved Methodologies .......................................................................... 19 The following figures are included in this Core Operating Limits Report:

Number Title Page Figure 3.1.6 CEA Group Insertion Limits vs. Fraction of Rated Thermal Power ......................... I1 Figure 3.2.1-1 Allowable Peak Linear Heat Rate vs. Time in Cycle ............................................ 12 Figure 3.2.1-2 Linear Heat Rate Axial Flux Offset Control Limits .............................................. 13 T

Figure 3.2.3 Total Integrated Radial Peaking Factor (Fr ) vs.

Allowable Fraction of Rated Thermal Power ....................................................... 14 Figure 3.2.5 DNB Axial Flux Offset Control Limits ................................................................ 15 Figure 3.3.1-1 Axial Power Distribution - High Trip Setpoint Peripheral Axial Shape Index vs. Fraction of Rated Thermal Power .......................................................... 16 Figure 3.3.1-2 Thermal Margin/Low Pressure Trip Setpoint - Part I ........................................... 17 Figure 3.3.1-3 Thermal Margin/Low Pressure Trip Setpoint - Part 2 ......................................... 18 Rev. I Calvert Cliffs I, Cycle Cliffs 1, COLR 21 COLR Cycle 21 Page 2 Page 2 of2l of 21 Rev. I

UNIT 1 CORE OPERATING LIMITS REPORT LIST OF EFFECTIVE PAGES Pago, No. I Rev. No.

1 1 ________________

i I

1 i

i I

i I

I I

i I

2,)

I I

2..

_ __I i

i Calvert Cliff's I, Cycle 21 COLR Page 3 of 21 Rev. I

INTRODUCTION This report provides the cycle-specific limits for operation of Calvert Cliffs Unit 1, Cycle 21. It contains the limits for:

Shutdown Margin (SDM)

Moderator Temperature Coefficient (MTC)

Control Element Assembly (CEA) Alignment Regulating Control Element Assembly (CEA) Insertion Limits Linear Heat Rate (LHR)

Total Integrated Radial Peaking Factor (Fr-T)

Axial Shape Index (ASI)

Reactor Protective System (RPS) Instrumentation - Operating RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits Boron Concentration In addition, this report contains a number of figures which give limits on the parameters listed above. If any of the limits contained in this report are exceeded, corrective action will be taken as defined in the Technical Specifications.

This report has been prepared in accordance with the requirements of Technical Specifications.

The cycle specific limits have been developed using the NRC-approved methodologies given in the "List of Approved Methodologies" section of this report and in the Technical Specifications.

COLR Revision 0 Initial release of the Unit 1 Cycle 21 (UIC21) COLR per Safety Evaluation SE00512 Revision 0. U I C21 may operate in all plant modes.

The departure from nuclear boiling (DNB) values were removed from the Technical Specifications section 3.4.1 and added to the COLR. This was approved by the NRC in a letter from Douglas V. Pickett (NRC) to George H. Gellrich (CE), entitled "Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2 amendment, Re: Technical Specification Task Force Traveler 487-a, Revision 1, Relocate DNB parameters to the COLR (TAC Nos. ME7086 and ME7087)," dated January 11,2012.

COLR Revision 1 Revision I of the Unit I Cycle 21 (UIC21) COLR was issued per Safety Evaluation SE00512 Revision 1. SE00512 requires a minimum boron concentration of 1747 ppm for the U IC21 core offload, but includes a note specifying that it is acceptable for the COLR to conservatively list higher values. A value of 2548 ppm boron will be used since that is the minimum value required by SE00533 for the Unit 1 Cycle 22 core onload.

21 Rev. I I, Cycle Calvert Cliffs 1, Calvert COLR 21 COLR Cycle 21 Page 44 of Page of 21 Rev. I

DEFINITIONS Axial Shape Index (ASI)

ASI shall be the power generated in the lower half of the core less the power generated in the upper half of the core, divided by the sum of the power generated in the lower and upper halves of the core.

ASI - lower- upper = YE lower + upper The Axial Shape Index (YI) used for the trip and pretrip signals in the Reactor Protection System (RPS) is the above value (YE) modified by an appropriate multiplier (A) and a constant (B) to determine the true core axial power distribution for that channel.

Yj = AYE + B Total Integrated Radial Peaking Factor - FrT The Total Integrated Radial Peaking Factor is the ratio of the peak pin power to the average pin power in an unrodded core.

COLR Rev. I Calvert Cliffs 1, Cycle 21 COLR Calvert Cliffs 1, Cycle 2~Page Page 5 of2l 5 of 21 Rev. I

LICENSING RESTRICTIONS

1) For the Asymmetric Steam Gencrator Transient analysis performed in accordance with the methodology of Technical Specification 5.6.5.b.8, the methodology shall be revised to capture the asymmetric core inlet temperature distribution and application of local peaking augmentation factors. T'he revised methodology shall be applied to Calvert Cliffs Unit I core reload desigmn starting with Cycle 21.
2) For the Seized Rotor Event analysis performed in accordance with the methodology of Technical Specification 5.6.5.b.A, the methodology shall be revised to capture the asymmetric core inlet flow distribution. The revised methodology shall be applied to Calvert Cliffs Unit I core reload designs starting with Cycle 21.
3) For the Control Element Assembly Ejection analysis performed in accordance with the methodology of Technical Specification 5.6.5.b. 11, the cycle-specific hot zero power peak average radial fuel enthalpy is calculated based on a modified power dependent insertion limit with Control Eleiient Assembly Bank 3 assumed to be fully inserted (only in the analysis, not in actual plant operations). This revised methodology shall be applied to Calvert Cliffs Unit I core reload designs starting with Cycle 21.
4) The Small Break Loss of Coolant accident performed in accordance with the methodology of Technical Specification 5.6.5.b.9 shall be analyzed using a break spectrum with augmented detail related to break size. This revised methodology shall be applied to Calvert Cliffs Unit I core reload designs starting with Cycle 21.
5) Core Operating Limits Report Figures 3.1.6, 3.2.3, and 3.2.5 shall not be changed without prior NRC review and approval until an NRC-accepted generic, or Calvert Cliffs-specific, basis is develop.d for analyzing the Control Element Assembly Rod Bank Withdrawal Event, the Control Element Assembly Drop, and the Control Element Assembly Ejection (power level -sensitive transients) at full power conditions only.
6) Approval of the use of S-RELAP5 (Technical Specification 5.6.5.b.8) is restricted only to those safety analyses that confirm acceptable transient performance relative to the specified acceptable fuel design limits. Prior transient specific NRC approval is required to analyze transient performance relative to reactor coolant pressure boundary integrity until NRC-approval is obtained ibr a generic or Calvert Cliffs-specific basis for the use of the methodology in Technical Specification 5.6.5.b.8 to demonstrate reactor coolant pressure boundary integrity.

Calvert Cliffs 1, Cycle 21 COLR Page 6 of 21 Rev. 1

7) For the RODEX2-based fuel thermal-mechanical design analysis performed in accordance with the methodology of Technical Specification 5.6.5.b.3, Calvert Cliffs Unit I core reload designs (starting with Cycle 21) shall satisfy the following criteria:
a. Predicted rod internal pressure shall remain below the steady state system pressure.
b. The linear heat generation rate fuel centerline melting safety limit shall remain below 21.0 KW/ft.
8) For the Control Element Assembly Ejection analysis, Calvert Cliffs Unit I core reloads (starting with Cycle 21) shall satisfy the following criteria:
a. Predicted peak radial average fuel enthalpy when calculated in accordance with the methodology of Technical Specification 5.6.5.b. I1 shall remain below 200 cal/g.
b. For the purpose of evaluating radiological consequences, should the S-RELAP5 hot spot model predict fuel temperature above incipient centerline melt conditions when calculated in accordance with the methodology of Technical Specification 5.6.5.b.8, a conservative radiological source term (in accordance with Regulatory Guide 1.183, Revision 0) shall be applied to the portion of fuel beyond incipient melt conditions (and combined with existing gap source term), and cladding failure shall be presumed.
9) The approval of the emergency core cooling system evaluation performed in accordance with the methodology of Technical Specification 5.6.5.b.7 shall be valid only for Calvert Cliffs Unit 1, Cycle 21. To remove this condition, Calvert Cliffs shall obtain NRC approval of the analysis of once- and twice-burned fuel for core designs following Unit I Cycle 21.

Reference:

Letter from Douglas V. Picket (NRC) to George H. Gellrich (CCNPP) dated February 18, 2011, Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2 -Amendment Re: Transition from Westinghouse Nuclear Fuel to AREVA Nuclear Fuel (TAC Nos. ME2831 and ME2832) 21 Rev. 1 Calvert Cliffs 1, Calvert Cliffs 21 COLR Cycle 21 1, Cycle COLR Page 77 of Page of 21 Rev. I

CYCLE SPECIFIC LIMITS FOR UNIT 1, CYCLE 21 3.1.1 Shutdown Margin (SDM) (SR 3.1.1.1)

Tavg > 200'F - Modes 3 and 4:

The shutdown margin shall be > 3.5% Ap.

Tavg _<200 'F - Mode 5:

The shutdown margin shall be > 3.0% Ap.

3.1.3 Moderator Temperature Coefficient (MTC) (SR 3.1.3.2)

The Moderator Temperature Coefficient (MTC) shall be less negative than -3.0 x 104 Ap/°F at rated thermal power.

3.1.4 Control Element Assembly (CEA) Alignment (Action 3.1.4.B.1)

The allowable time to realign a CEA is 120 minutes when the pre-misaligned Fr is < 1.65 and zero (0) minutes when the pre-misaligned FrT is> 1.65.

The pre-misaligned FrT value used to determine the allowable time to realign the CEA shall be the latest measurement taken within 5 days prior to the CEA misalignment. If no measurements have been taken within 5 days prior to the misalignment and the full core power distribution monitoring system is unavailable then the time to realign is zero (0) minutes.

3.1.6 Regulating Control Element Assembly (CEA) Insertion Limits (SR 3.1.6.1 and SR 3.1.6.2)

The regulating CEA groups insertion limits are shown on COLR Figure 3.1.6.

Figure 3.1.6 will not be changed unless the requirements in Licensing Restriction 5 are met.

3.2.1 Linear Heat Rate (LHR) (SR 3.2.1.2 and SR 3.2.1.4)

The linear heat rate shall not exceed the limits shown on COLR Figure 3.2.1-1.

The axial shape index power dependent control limits are given in COLR Figure 3.2.1-2.

When using the excore detector monitoring system (SR 3.2.1.2):

The alarm setpoints are equal to or less than the ASI limits; therefore when the alarms are adjusted, they provide indication to the operator that ASI is not within the limits.

The axial shape index alarm setpoints are shown as a function of fraction of thermal power on COLR Figure 3.2.1-2.

Calvert Cliffs 1, Cycle 21 COLR Page 8 of 21 Rev. I

When using the incore detector monitoring system (SR 3.2.1.4):

The alarm setpoints are adjusted to protect the Linear Heat Rate limits shown on COLR Figure 3.2.1-1 and uncertainty factors are appropriately included in the setting of these alarms.

The uncertainty factors for the incore detector monitoring system are:

I. A measurement-calculational uncertainty factor of 1.07

2. An engineering uncertainty factor of 1.03, 3.a For measured thermal power less than or equal to 50 percent but greater than 20 percent of rated full core power a thermal power measurement uncertainty factor of 1.035.

3.b For measured thermal power greater than 50 percent of rated full core power a thermal power measurement uncertainty factor of 1.020.

3.2.3 Total Integrated Radial Peaking Factor (Fr ) (SR 3.2.3.1)

The calculated value of F.T shall be limited to < 1.65.

The allowable combinations of thermal power, CEA position, and FrT are shown on COLR Figure 3.2.3.

Figure 3.2.3 will not be changed unless the requirements in Licensing Restriction 5 are met.

3.2.5 Axial Shape Index (ASI) (SR 3.2.5.1)

The axial shape index and thermal power shall be maintained equal to or less than the limits of COLR Figure 3.2.5 for CEA insertions specified by COLR Figure 3.1.6.

Figure 3.2.5 will not be changed unless the requirements in Licensing Restriction 5 are met.

3.3.1 Reactor Protective System (RPS) Instrumentation - Operating (Reactor Trip Setpoints) (TS Table 3.3.1-1)

The Axial Power Distribution - High trip setpoint and allowable values are given in COLR Figure 3.3.1-1.

The Thermal Margin/Low Pressure (TM/LP) trip setpoint is given in COLR Figures 3.3.1-2 and 3.3.1-3. The allowable values are to be not less than the larger of(]) 1875 psia or (2) the value calculated from COLR Figures 3.3.1-2 and 3.3.1-3.

3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits The RCS DNB parameters for pressurizer pressure, cold leg temperature, and RCS total flow rate shall be within the limits specified below:

a. Pressurizer pressure -- 2200 psia;
b. RCS cold leg temperature (T.) < 548'F; and
c. RCS total flow rate > 370,000 gpm.

Calvert Cliffs 1, Cycle 21 COLR Page 9 of 21 Rev. I

3.9.1 Boron Concentration (SR 3.9.1.1)

The refueling boron concentration will maintain the kfr at 0.95 or less (including a 1% Ak/k conservative allowance for uncertainties). The refueling boron concentration shall be maintained uniform. For Mode 6 operation the RCS temperature must be maintained

< 140"F.

U1C21 Refueling Boron Concentration Limits U1C21Burnup= UIC21Burnup>

0 GWD/MTU 16 GWD/MTU 0 Credited CEAs 0 Credited CEAs Post-Refueling UGS or RV Head Lift Height No Restriction No Restriction Restrictions.

Minimum Required Refueling Boron Concentration:

This number includes:

" Chemistry Sampling Uncertainty >2505 ppm >2548 ppm

" Boron-10 Depletion Allowance

" Margin for dilution of refueling pool (Note 1) (Note 1) between low and high level alarms

" Unlimited number of temporary rotations of fuel assemblies

" Extra Conservatism for empty locations during refueling operations.

Note: (1) The limit in the above table represents the minimum required refueling boron concentration. It is acceptable for NEOP-13 to conservatively specify higher values.

Calvert Cliffs 1, Cycle 21 COLR Page 10 of 21 Rev. I

1.000 p.-

(1.00 FRTP, Group 5 @ 35% Inserted) 0.900 JNACCEPTABLE S (0.90 FRTP,Group 5 @35% Inserted) rI- OPERATING 0.800 (0.75 FRTP, Group5 @ 50% Inserted) REGION LU S.(0.70 FRTP, GroupS @ 60%/Inserted) 0.700 0

. (0.65 FRTP, Group 5 @ 85% Inserted)

-J 0.600 * . .

(0.56 FRTP, Group4 @ 50OY Inserted)

LuJ 0.500 E* e LU 0.400

.. Transient Insertion Limit U.

0.300 z

0 (0.20 FRTP, Gro up3 @ 60%Inserted)

LP 0.200 ° o

0.100 -

Above ZPPDIL clrro llIT r I (Above Zero Power PDIL Setpoint, Group 3 @ 60% Inserted)

SEMr INT

-w I I1 0% 20% 40% 60% 80% 100% 0% 20% 40% 60% 80% 100% 0% 20% 40% 60% 80% 100%

135" 108" 81" 54" 27" 0" 135" 108" 81" 54" 27" 0" 135" 108" 81" 54" 27" 0" 0% 20% 40% 60% 80% 100%0% 20% 40% 60% 80% 100%

135" 108" 81" 54" 27" 0" 135" 108" 81" 54" 27" 0"

%CEA INSERTION INCHES CEA WITHDRAWN (ARO is defined in NEOP-13)

Note:

Per Tech Spec Bases 3.1.5 and 3.1.6, CEAs are considered to be fully withdrawn at 129 inches.

Figure 3.1.6 CEA Group Insertion Limits vs. Fraction of Rated Thermal Power This figure cannot be changed without prior NRC approval.

Calvert Cliffs 1, Cycle 21 COLR Page I I of 21 Rev. I

17.0 16.5 I-Li 16.0 15.5 ww

+ 15.0 UNACCEPTABLE OPERATION IL-J 14.5 mu. 14.3 0

..J

,-J 14.0 ACCEPTABLE OPERATION 13.5 13.0 BOC EOC TIME IN CYCLE Figure 3.2.1-1 Allowable Peak Linear Heat Rate vs. Time in Cycle Calvert Cliffs 1, Cycle 21 COLR Page 12 of 21 Rev. I

1.10 1.05 1.00 0.95 -0.091, 0.950 0.075, 0.950 0.90 0.85 UNACCEPTABLE W OPERATION UNACCEPTABLE LU 0.80 REGION OPERATION

)0.75 REGION 0.75 0.70 ACCEPTABLE LU 0.65 OPERATION REGION LL 0.60 -0.264, 0.600 0.248, 0.600 0

z 0.55 0-0.50 0.45 0.40 0.35 0.30 0.25 - 0.248, 0.200

-0.264, 0.200 0.20 i i I I I

-0.60 -0.40 -0.20 0.00 0.20 0.40 0.60 PERIPHERAL AXIAL SHAPE INDEX, Yi Figure 3.2.1-2 Linear Heat Rate Axial Flux Offset Control Limits (AXIAL SHAPE INDEX limits for Linear Heat Rate when using Excore Detector Monitoring System)

(LCO Limits are not needed below 20% thermal power per SE00433)

(See NEOP-13 for Operational Limits)

Calvert Cliffs 1, Cycle 21 COLR Page 13 of 21 Rev. I

1.05 w10.95 OPERATION R.

  • REGION 0

CL 0.85 0.~~.5 (1.7325, 0.80)

0.75 FrT LIMIT CURVE I-U0 0.65

, 0.55 0

z 0 0.45 ACCEPTABLE OPERATION REGION 0.35 w

_J m 0.25 0(1.819,0.20) 0.15 0.05 1.60 1.65 1.70 1.75 1.80 1.85 FrT Figure 3.2.3 Total Integrated Radial Peaking Factor (FrT) VS.

Allowable Fraction of Rated Thermal Power While operating with FT greater than 1.65, withdraw CEAs to or above the Long Term Steady State Insertion Limits (Figure 3.1.6)

This figure cannot be changed without prior NRC approval.

Rev. I Calvert Cliffs 1, Cycle Cliffs 1, 21 COLR Cycle 21 COLR Page 14 of2l Page 14 of 21 Rev. I

1.10 1.05 1.00 (-0.08,1.00) (0.15, 1.00) w 0.95 UNACCEPTABLE UNACCEPTABLE 0.u OPERATION OPERATION

.- J 0.90 REGION REGION 3l 0.85 0

d- 0.80 (0.3, 0.80) w

  • 0.75 ACCEPTABLE 0.70 (-0.3, 0.70) OPERATION o REGION 0.65
  • 0.60 0.55 20S0.50

.50 (-0.3, 0.50)

U,.

0 0.45 z

0

. 0.40

< 0.35 UL 0.30 0.25 (-0.42, 0.20) (0.3, 0.20) 0 .2 0 i I 6, I

-0.60 -0.40 -0.20 0.00 0.20 0.40 0.60 PERIPHERAL AXIAL SHAPE INDEX, Yi Figure 3.2.5 DNB Axial Flux Offset Control Limits (LCO Limits are not needed below 20% thermal power per SE00433)

(See NEOP-13 for Operational Limits)

This figure cannot be changed without prior NRC approval.

Page 15 of2l Rev. I Cliffs 1, Calvert Cliffs 1,Cycle 21 COLR Cycle 21 COLR Page 15 of 21 Rev. I

1.300 1.250 1.200 1.150 1.100 1.050 1.000

.Ix 0.950 LU.

0 0.900 0.

0.850

"-J 0.800 I-0.750 0.700 It.

0 0.650 z 0.600 0

0.550 LI. 0.500 0.450 0.400 0.350 0.300 0.250 0.200 0.150

-0.80 -0.60 -0.40 -0.20 0.00 0.20 0.40 0.60 0.80 PERIPHERAL AXIAL SHAPE INDEX, Yi Figure 3-3.1-1 Axial Power Distribution - High Trip Setpoint Peripheral Axial Shape Index vs. Fraction of Rated Thermal Power of2l 16 of Rev. I Calvert Cliffs 1, Cycle 21 COLR Calvert Cliffs 1, Cycle 21 Page COLR Page 16 21 Rev. I

1.60 -

P var 2869.5 x (Ai) x (QR1) + 17.98 x Tin - 10820 1.50 QDNBA1ix QR1 1.40 1.3 (-0.6 1.3) 1.20 Al +0.16 7 x AI + 1.0 1.10(+0.6, 1.1)

AI= 0.5x SI+1.,

1.00 - - " __ ___

(0.0, 1 0) 0.90

-0.60 -0.50 -0.40 -0.30 -0.20 -0.10 0.00 0.10 0.20 0.30 0.40 0.50 0.60 ASI Figure 3.3.1-2 Thermal Margin/Low Pressure Trip Setpoint - Part 1 (ASI vs. A 1 )

Calvert Cliffs 1, Cycle 21 COLR Page 17 of 21 Rev. I

pTrip = 2869.5 x (Al) x (QR1) + 17.98 x T1n - 10820 var QDNB = Al x QR1 1.2 - 1 1 (1.2,1.2) 1.1 -- QR,=.(RTP)C +0 1.0 0.9 0.8

0. - - 1 QR = 0.375 x (RTP) + 0.625 X 0.6 - -

0.5 - -- -l 0.4 0.0QR.

0 1 0.9167 x(RTP) 0.3 0.3Fi (o.0, 0.31 0.2 0.1 0.0*

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 FRACTION OF RATED THERMAL POWER (RTP)

Figu re 3.3.1-3 Thermal Margin/Low Pressure Trip Setpoint - Part 2 (Fraction of Rated Thermal Power vs. QR 1 )

Rev. 1 Calvert Cliffs 1, Cycle 21 COLR Calvert Cuffs 1, Cycle 21 Page COLR Page 18 of2l 18 of 21 Rev. I

LIST OF APPROVED METHODOLOGIES

1. ANF-88-133 (P)(A) and Supplement 1, "Qualification of Advanced Nuclear Fuels' PWR Design Methodology for Rod Burnups of 62 GWd/MTU" Advanced Nuclear Fuels Corporation, December 1991
2. BAW- 10240(P)(A), Revision 0, "Incorporation of M5 Properties in Framatome ANP Approved Methods" Framatome ANP, May 2004
3. EMF-92-116(P)(A), Revision 0, "Generic Mechanical Design Criteria for PWR Fuel Designs" Siemens Power Corporation, February 1999 [Licensing Restriction 7]
4. EMF-92-153(P)(A), Revision 1, "HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel," Siemens Power Corporation, January 2005
5. EMF-96-029(P)(A) Volumes I and 2, "Reactor Analysis System for PWRs Volume 1 -

Methodology Description, Volume 2 - Benchmarking Results," Siemens Power Corporation, January 1997

6. EMF-1961 (P)(A), Revision 0, "Statistical Setpoint/Transient Methodology for Combustion Engineering Type Reactors," Siemens Power Corporation, July 2000
7. EMF-2103 (P)(A), Revision 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors" Framatome ANP, April 2003 [Licensing Restriction 9]
8. EMF-23 I0(P)(A), Revision I, "SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors" Framatome ANP, May 2004 [LicensingRestrictions 1, Z 6, and 8b]
9. EMF-2328(P)(A), Revision 0, "PWR Small Break LOCA Evaluation Model, S-RELAP5 Based" Framatome ANP, March 2001 [Licensing Restriction4]
10. XN-NF-75-32(P)(A), Supplements 1, 2, 3 & 4, "Computational Procedure for Evaluating Fuel Rod Bowing" Exxon Nuclear Company Inc., February 1983
11. XN-NF-78-44(NP)(A), "A Generic Analysis of the Control Rod Ejection Transient for Pressurized Water Reactors" Exxon Nuclear Company Inc., October 1983 [Licensing Restrictions 3 and8a]
12. XN-NF-79-56(P)(A), Revision I and Supplement 1, "Gadolinia Fuel Properties for LWR Fuel Safety Evaluation" Siemens Power Corporation, October 1981
13. XN-NF-82-06(P)(A), Revision I & Supplements 2, 4, and 5, "Qualification of Exxon Nuclear Fuel for Extended Burnup" Exxon Nuclear Company lnc., October 1986
14. XN-NF-82-21 (P)(A), Revision 1, "Application of Exxon Nuclear Company PWR Thermal Margin Methodology to Mixed Core Configurations" Exxon Nuclear Company Inc., August 1983 Calvert Cliffs I, Cycle 21 COLR Page 19 of 21 Rev. I
15. XN-NF-85-92(P)(A), Revision 0, "Exxon Nuclear Uranium Dioxide/Gadolinia Irradiation ExaminatiOn and Thermal Conductivity Results" Exxon Nuclear Company Inc., September 1986
16. CEN-124(B)-P, "Statistical Combination of Uncertainties Methodology Part 2: Combination of

-System Parameter Uncertainties in Thermal Margin Analyses for Calvert Cliffs Units I and 2,"

January 1980

17. CEN-191(B)-P, "CETOP-D Code Structure and Modeling Methods for Calvert Cliffs Units I and 2," December 1981
18. Letter from Mr. D. H. Jaffe (NRC) to Mr. A. E. Lundvall, Jr. (BG&E), dated June 24, 1982, Unit 1 Cycle 6 License Approval (Amendment No. 71 to DPR-53 and SER) [Approval to CEN-124(B)-P (three parts) and CEN-191(B)-P)]
19. CENPD-16 1-P-A, "TORC Code, A Computer Code for Determining the Thermal Margin of a Reactor Core," April 1986
20. CENPD-206-P-A, "TORC Code, Verification and Simplified Modeling Methods," June 1981
21. CENPD-225-P-A, "Fuel and Poison Rod Bowing," June 1983
22. CENPD-382-P-A, "Methodology for Core Designs Containing Erbium Burnable Absorbers,"

August 1993

23. CENPD-139-P-A, "C-E Fuel Evaluation Model Topical Report," July 1974
24. CEN-161-(B)-P-A, "Improvements to Fuel Evaluation Model," August 1989
25. CEN-161 -(B)-P, Supplement 1-P, "Improvements to Fuel Evaluation Model," April 1986
26. Letter from Mr. S. A. McNeil, Jr. (NRC) to Mr. J. A. Tiernan (BG&E), dated February 4, 1987, Docket Nos. 50-317 and 50-318, "Safety Evaluation of Topical Report CEN-16 1-(B)-P, Supplement I-P, Improvements to Fuel Evaluation Model" (Approval of CEN- 161 (B),

Supplement I-P)

27. CEN-372-P-A, "Fuel Rod Maximum Allowable Gas Pressure," May 1990
28. CENPD-135, Supplement 5-P, "STRIKIN-Il, A Cylindrical Geometry Fuel Rod Heat Transfer Program," April 1977
29. CENPD-387-P-A, Latest Approved Revision, "ABB Critical Heat Flux Correlations for PWR Fuel"
30. CENPD-404-P-A, Latest Approved Revision, "Implementation of ZIRLO TM Cladding Material in CE Nuclear Power Fuel Assembly Designs".
31. WCAP-l 1596-P-A, "Qualification of the PHOENIX-P, ANC Nuclear Design System for Pressurized Water Reactor Cores," June 1988.
32. WCAP- 10965-P-A, "ANC: A Westinghouse Advanced Nodal Computer Code," September 1986.
33. WCAP-10965-P-A Addendum I, "ANC: A Westinghouse Advanced Nodal Computer Code; Enhancements to ANC Rod Power Recovery," April 1989.

Calvert Cliffs 1, Cycle 21 COLR Page 20 of 21 Rev. I

34. WCAP-16072-P-A, "Implementation of Zirconium Diboride Burnable Absorber Coatings in CE Nuclear Power Fuel Assembly Designs," August 2004.
35. WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON,"

August 2004.

Rev. I Calvert Cliffs 1, Cycle 21 COLR Calvert Cliffs 1, Cycle 21Page Page 21 of2l COLR 21 of 21 Rev. I