Letter Sequence RAI |
---|
|
|
MONTHYEARML14034A1732014-01-29029 January 2014 Revised Proposed Alternative for Mitigation of Buried Saltwater Piping Degradation (RR-ISI-04-08, Revision 1) Project stage: Request ML14041A4272014-02-11011 February 2014 Request for Additional Information Regarding Relief Request RR-ISI-04-08, Revision 1, Mitigation of Buried Saltwater System Piping Degradation Project stage: RAI ML14050A1272014-02-14014 February 2014 Response to Request for Additional Information Proposed Alternative RR-ISI-04-08, Revision I Project stage: Response to RAI ML14055A2132014-02-25025 February 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request RR-ISI-04-08, Revision 1 Project stage: Other ML14246A0692014-12-19019 December 2014 Relief Request RR-ISI-04-08, Revision 1, Request for Relief Using Alternative Repair for Buried Saltwater Piping (Tac Nos. MF3413 and MF3414) Project stage: Other 2014-02-11
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21130A0382021-05-21021 May 2021 Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21053A3142021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20275A0032020-09-30030 September 2020 Request for Additional Information Regarding Alternative Request Re Inservice Inspection Impracticality (L-2020-LLR-0089) ML20167A2532020-06-15015 June 2020 Second Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20157A0782020-06-0505 June 2020 Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H0132020-05-14014 May 2020 IP 71111.17T (50.59) List of Documents Request ML20083F5892020-03-21021 March 2020 Request for Additional Information Regarding License Amendment Request Concerning Reactor Coolant Pump Flywheel Inspection Program ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19261B2202019-09-18018 September 2019 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19155A1612019-06-11011 June 2019 Changes to Draft Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Systems, Structures and Components ML19155A1272019-06-0404 June 2019 Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 Risk Informed Categorization and Treatment of Systems, Structures, and Components ML19070A0192019-03-11011 March 2019 Request for Additional Information Regarding Exemption Request from 10CFR50.46(A)(1) to Support Resolution of GSI-191 ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18347A3972018-12-13013 December 2018 Request for Additional Information Regarding Relocation of Emergency Operation Facility ML18138A1372018-05-22022 May 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Risk Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18128A3842018-05-0808 May 2018 Plants, Units 1 and 2 - Draft Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17345A0912018-01-19019 January 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Alternative Request SI-RR-01, Rev. 0 (CAC Nos. MG0068 and MG0069; EPID L-2017-LLR-0078) ML17346A9092017-12-21021 December 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17304A9412017-11-13013 November 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17075A0152017-03-16016 March 2017 E-mail from R. Guzman to E. Villar - Calvert Cliffs Unit Nos. 1 and 2 - Request for Additional Information License Amendment Request - Control Room Emergency Ventilation System ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16222A1252016-08-0909 August 2016 Request for Additional Information - Relief Request No. RR-ISI-04-11, 2016/08/08 E-mail from R.Guzman to T.Loomis ML15299A2792015-11-0303 November 2015 Request for Additional Information Regarding Relief Request for Dissimilar Metal Butt Welds ML15230A0322015-08-13013 August 2015 Request for Additional Information Regarding the National Association Standard 805 License Amendment Request Fire Protection 2024-01-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 11, 2014 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2-REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQEUST RR-ISI-04-08, REVISION 1, MITIGATION OF BURIED SALTWATER SYSTEM PIPING DEGRADATION (TAC NOS. MF3413 AND MF3414)
Dear Mr. Gellrich:
By letter dated January 29, 2014, Calvert Cliffs Nuclear Power Plant, LLC, the licensee, submitted a request for authorization of a proposed alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, IWA-4000 for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. Specifically, the licensee proposed the installation of a sleeve assembly primarily consisting of a pressure retaining backing plate, an internal rubber gasket and four retaining bands, as a repair system for defects in the buried saltwater system piping.
The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The NRC staff requested a response to the RAI by February 14, 2014.
If you have any questions regarding this issue, please contact me at (30 1) 415-1 016.
Sincerely, Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQEUST RR-ISI-04-08. REVISION 1 ALTERNATIVE REPAIR FOR BURIED SALTWATER SYSTEM PIPING CALVERT CLIFFS NUCLEAR POWER PLANT. LLC CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NOS. 1 AND 2 DOCKET NOS. 50-317 AND 50-318 By letter dated January 29, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14034A173), Calvert Cliffs Nuclear Power Plant, LLC (Calvert Cliffs), the licensee, submitted a request for authorization of a proposed alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, IWA-4000 for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. Specifically, the licensee proposed the installation of a sleeve assembly primarily consisting of a pressure retaining backing plate, an internal rubber gasket and four retaining bands, as a repair system for defects in the buried saltwater system piping.
In order to complete its review, the Nuclear Regulatory Commission (NRC) staff requests the following information:
- 1. Page 4 of the RR-ISI-04-08, Rev. 1 contains text which states:
Prior to installation of the sleeve, the cement lining for the entire length of the sleeve assembly will be removed and repaired with an approved sealant. To prevent galvanic corrosion, the outer surface of the backing plate will be wrapped with a 1/8" thick rubber gasket so that the stainless steel backing plate does not come in direct contact with ductile cast iron piping.
Page 4 of the RR-ISI-04-08, Rev. 1 also contains Figure 2. Figure 2 appears to be either in conflict with or an over simplification of the above text. Based primarily on the above text, the NRC staff believes that the process of installing the repair will include the following steps:
- Identification and characterization of the location to be repaired
- Removal of the all the mortar lining from the pipe for a length equal to the length of the rubber seal
- Application of sealing material (sealant) in the location from which the mortar has been removed
- Insertion of the 1/8-inch rubber gasket on top of the sealant to ensure that the backing plate will not contact the ductile iron pipe
- Insertion of the A16XN backing plate
- Insertion of the rubber gasket
- Insertion of the AI6XN bands Enclosure
Please correct the text and diagrams in RR-ISI-04-08, Rev. 1, and/or the NRC staff's understanding of the repair process as appropriate.
- 2. In the last paragraph on Page 4 of RR-ISI-04-08, Rev. 1, you stated that an approved sealant will be used to repair the cement lining at the defect area prior to installing the rubber seal.
a) Reference the industry standards (e.g., American Society for Testing and Materials sections) to which the sealant was qualified, discuss the qualifying conditions (the temperature and pressure under which the sealant is qualified), and the qualified service life of the sealant.
b) Will the sealant be hard or remain pliable when it is applied to the excavated area of the inside surface of the pipe?
c) How thick or deep will the sealant be when it is applied?
d) Will the backing plate have good contact with the sealant? If not, have the stress calculations, which permit this repair to be used for pipe degradations up to 3 inches in diameter, considered this lack of contact between the backing plate and the sealant?
- 3. On page 6 of RR-ISI-04-08, Rev. 1, you stated that the proposed repair will not apply to through-wall degradation. Discuss the minimum wall thickness of the pipe base metal and at the bell-spigot joint beyond which the proposed seal repair would not be applicable.
- 4. Attachment 2 to RR-ISI-04-08, Rev. 1 specifies two regulatory commitments to inspect one installed seal after two operating cycles for Unit Nos. 1 and 2, respectively. The NRC staff finds that these commitments are an essential aspect of whether or not the proposed alternative should be authorized. The NRC's Office of the General Counsel has indicated to the NRC staff that regulatory commitments on the part of licensees may not be used in NRC safety evaluations as a basis for meeting the criteria contained in Title 10 of the Code of Federal Regulations Section 50.55a(a)(3). The Office of the General Counsel has indicated that when regulatory commitments must be relied upon in authorizing an alternative to the ASME Code, the safety evaluation should clearly state that the commitment is a condition of the authorized alternative. Once the regulatory commitment has been deemed to be a condition of the alternative, the commitment becomes a condition of the NRC's authorization. Please confirm that Calvert Cliffs understands that the regulatory commitments provided as part of this request will become conditions of the authorized alternative.
- 5. In the NRC staff's previous review of this proposed alternative, it considered only sections of straight pipe and not joints between those sections. As a result, the NRC staff did not consider the potential for axial, angular, or rotational motion between opposite ends of the repair.
a) Given the potential for these motions, due to changes in the soil around the pipe caused by changes in temperature, moisture, or seismic activity, and especially in light of the
fact that the sealant material is applied over exactly the length of the repair gasket, please discuss the potential for cracks to develop in the sealant which allow water ingress into the joint.
b) Discuss the potential for and results of a seismic event of sufficient magnitude to cause sliding between pipe segments along the bell and spigot joint, which appears to be constrained only by gasket friction, addressing whether the motion may exceed the ability of the repair to expand or contract.
c) Would such an event result in the rubber gasket washing downstream and plugging safety related equipment?
- 6. The NRC staff notes that post-installation pressure testing was not included in RR-ISI-04-08, Rev. 1. In its May 13, 2013, letter, in response to the NRC request for additional information RAI-19, the licensee provided the requirements for the post-installation pressure testing for RR-ISI-04-08 (ADAMS Accession No. ML13141A270). Discuss whether the post-installation pressure testing for RR-ISI-04-08, Rev. 1 will be performed the same as for RR-ISI-04-08.
- 7. The NRC staff notes that the duration for the proposed alternative was not included in RR-ISI-04-08, Rev. 1. In its November 13, 2013, letter, the NRC authorized RR-ISI-04-08 for the fourth inservice inspection interval which ends on June 30, 2019 for both units (ADAMS Accession No. ML13297A293). Discuss whether the duration for RR-ISI-04-08, Rev. 1 is also applicable for the fourth inservice inspection interval which ends on June 30, 2019 for both units.
February 11, 2014 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2-REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQEUST RR-ISI-04-08, REVISION 1, MITIGATION OF BURIED SALTWATER SYSTEM PIPING DEGRADATION (TAC NOS. MF3413 AND MF3414)
Dear Mr. Gellrich:
By letter dated January 29, 2014, Calvert Cliffs Nuclear Power Plant, LLC, the licensee, submitted a request for authorization of a proposed alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, IWA-4000 for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. Specifically, the licensee proposed the installation of a sleeve assembly primarily consisting of a pressure retaining backing plate, an internal rubber gasket and four retaining bands, as a repair system for defects in the buried saltwater system piping.
The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The NRC staff requested a response to the RAI by February 14, 2014.
If you have any questions regarding this issue, please contact me at (301) 415-1016.
Sincerely, Ira/
Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorl Lpl1-1 RidsNrrPMCalvertCiiffs LPL 1-1 R/F RidsNrrLAKGoldstein RidsAcrsAcnw_MaiiCenter RidsNrrDoriDpr RidsRgn1 MaiiCenter J. Tsao RidsOGCMaiiCenter RidsNrrDeEpnb D. Alley S. Kennedy, Rl E. Torres, Rl ADAMS Accession No: ML14041A427 *See dated email ** via e-mail OFFICE LPLI-1/PM LPLI-1/LA DE/EPNB/BC (A) LPLI-1/BC I NAME NMorgan KGoldstein_** DAiley BBeasley DATE 02/11/14 02/11/14 2/7/2014* 02/11/14 OFFICIAL RECORDS COPY