ML14035A556

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000261-14-301
ML14035A556
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/04/2014
From: Widmann M
NRC/RGN-II/DRS/OLB
To: William Gideon
Progress Energy Carolinas
References
IR-14-301
Download: ML14035A556 (5)


See also: IR 05000261/2014301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

February 4, 2014

Mr. William R. Gideon

Vice President

Progress Energy

H. B. Robinson Steam Electric Plant, Unit 2

3581 West Entrance Rd

Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000261/2014301

Dear Mr. Gideon:

In a telephone conversation on January 21, 2014, between Mr. Robert Adams, Operations

Training Superintendent, and Mr. Mark Bates, Senior Operations Engineer, arrangements were

made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant.

The operating test is scheduled to be administered during the weeks of August 18 and 25, 2014.

The written examination is scheduled to be administered either the week of August 25, 2014 or

September 1, 2014. The on-site preparatory week is scheduled for the week of July 21, 2014.

As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory

Commission (NRC) will prepare the written examination and your staff will prepare the operating

test based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." The NRC regional office will discuss with your

staff any changes that might be necessary before the examinations are administered. Your staff

has also agreed to make copies of all examination materials that are necessary for

administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish reference materials

identified in Attachment 3 to ES-201, including your exam banks, by February 18, 2014 and the

operating test outline by June 4, 2014. The operating test will be due by June 30, 2014.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outline and test before they are submitted to the NRC for review and approval. All materials

shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

W. Gideon

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the

Public Electronic Reading Room).

W. Gideon

3

Thank you for your cooperation in this matter. Mr. Adams has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Bates at (404) 997-4612, (Internet E-mail:

Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch 1

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

cc: Distribution via Listserv

__ML14035A556______________

xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

AXT6 FOR MAB7

MTW

NAME

MBates

MWidmann

DATE

2/4/2014

2/ 4 /2014

2/

/2014

2/ /2014

2/ /2014

2/ /2014

2/ /2014

E-MAIL COPY?

YES

NO

YES

NO

YES

YES

NO

YES

NO YES

NO

YES

NO

Letter to William R. Gideon from Malcolm T. Widmann dated February 4, 2014

SUBJECT:

H. B. ROBINSON STEAM ELECTRIS PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000261/2014301

Distribution:

RIDSNRRDIRS

PUBLIC

RidsNrrPMRobinson Resource