Revised Third 10 Year Interval Inservice Inspection Plans
ML14035A398
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/24/2014
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06824-TNW/RKR
Download: ML14035A398 (2)


Text

10 CFR 50.55a ap Palo Verde Nuclear Generating Station PO Box 52034 Phoenix, Arizona 85072-2034 102-06824-TNW/RKR Mail Station 7636 January 24, 2014 Tel (623) 393-5774 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, 50-530 Renewed License Nos. NPF-41, NPF-51, NPF-74 Revised Third 10 Year Interval Inservice Inspection Plans Attached please find the Inservice Inspection (ISI) Plan revisions for the third 10-year interval at PVNGS, for Units 1, 2, and 3. Arizona Public Service Company (APS) is providing these plans pursuant to Paragraph IWA-1400(c) of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.

Specifically, this submittal transmits Revisions 2 and 3 for Unit 1, Revisions 3 and 4 for Unit 2 and Revisions 2 and 3 for Unit 3. Electronic files of the revised Plans are provided in the Enclosure. The summary of changes for each document is provided immediately following the Table of Contents in each Plan revision.

APS is providing these plans for information. By copy of this letter, this submittal is being provided to the NRC Region IV Administrator and the PVNGS Resident Inspector. No commitments are being made to the NRC by this letter.

Should you need further information regarding this submittal, please contact Robert K. Roehler, Licensing Section Leader, at (623) 393-5241.

Sincerely, Thomas N. Weber Department Leader, Regulatory Affairs TNW/RKR/CJS/hsc A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak 0 Diablo Canyon 0 Palo Verde 0 Wolf Creek

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Revised Third 10-Year Interval Inservice Inspection Plans Page 2

Enclosure:

Optical Storage Media (OSM) Electronic Files of PVNGS Unit 1, Revised Third 10-Year Interval, Inservice Inspection Plans, PVNGS Unit 2, Revised Third 10-Year Interval, Inservice Inspection Plans and PVNGS Unit 3, Revised Third 10-Year Interval, Inservice Inspection Plans cc:

(with enclosure)

M. L. Dapas NRC Region IV Regional Administrator J. K. Rankin NRC NRR Project Manager for PVNGS A. E. George NRC NRR Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS