MONTHYEARNLS2024065, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2024-10-0707 October 2024 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2024053, Licensee Guarantees of Payment of Deferred Premiums2024-07-30030 July 2024 Licensee Guarantees of Payment of Deferred Premiums NLS2024055, Data from Metamic Coupon Sampling Program2024-07-29029 July 2024 Data from Metamic Coupon Sampling Program NLS2024052, Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-07-24024 July 2024 Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024051, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2024-07-0303 July 2024 Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2024044, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications NLS2024038, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical.2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. NLS2024035, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications NLS2024025, License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation2024-05-0909 May 2024 License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation NLS2024037, 2023 Annual Radiological Environmental Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Report NLS2024030, Annual Radioactive Effluent Release Report2024-04-25025 April 2024 Annual Radioactive Effluent Release Report NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024029, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications NLS2024031, Notice of Intent to Apply for Subsequent Renewal of Operating License2024-04-22022 April 2024 Notice of Intent to Apply for Subsequent Renewal of Operating License NLS2024036, Nebraska Public Power District 2023 Financial Report2024-04-19019 April 2024 Nebraska Public Power District 2023 Financial Report NLS2024027, Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation2024-04-0303 April 2024 Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation NLS2024024, Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation2024-04-0101 April 2024 Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation NLS2024018, Property Insurance Coverage2024-03-20020 March 2024 Property Insurance Coverage NLS2024017, Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-0012024-03-0808 March 2024 Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-001 NLS2024009, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of2024-03-0808 March 2024 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of NLS2024013, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications NLS2024014, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump NLS2024001, Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-02-16016 February 2024 Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024006, Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 2024-07-30
[Table view] |
Text
N Nebraska Public Power District NLS2014011 Always there when you need us January 31, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Nebraska Public Power District's Response to Nuclear Regulatory Commission's Request for Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns Cooper Nuclear Station, Docket No. 50-298, DPR-46
References:
- 1. Nuclear Regulatory Commission Letter, Request for InformationPursuantto Title 10 of the Code of FederalRegulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insightsfrom the Fukushima Dai-Ichi Accident, dated March 12, 2012 (Accession No. ML12053A340)
- 2. Nuclear Regulatory Commission Letter to Nuclear Energy Institute, Endorsement of Nuclear Energy Institute (NE1) 12-07, "Guidelinesfor Performing Verification Walkdowns of Plant Flood Protection Features,"
dated May 31, 2012 (Accession No. ML12144A142)
- 3. Nebraska Public Power District Letter to Nuclear Regulatory Commission, Flooding Walkdown Report - Nebraska Public Power District'sResponse to Nuclear Regulatory Commission Request for Information Pursuantto 10 CFR 50.540l Regarding the FloodingAspects of Recommendation 2.3 of the Near-Term Task Force Review of Insightsfrom the Fukushima Dai-ichiAccident, dated November 27, 2012 (NLS2012124)
- 4. Nuclear Regulatory Commission Letter, Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns, dated December 23, 2013 (Accession No. ML13325A891)
Dear Sir or Madam:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 requesting information pursuant to Title 10 of the Code of Federal Regulations 50.54(f). Enclosure 4 of Reference 1 contains specific Requested Information associated with Near-Term Task Force Recommendation 2.3 for Flooding. Per Reference 2, the NRC endorsed Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features," dated May 31, 2012. By Reference 3, Nebraska Public Power District (NPPD) submitted the final report in response to the request for information.
COOPER NUCLEAR STATION /d b P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
NLS2014011 Page 2 of 2 One of the requirements of NEI 12-07 is to identify the available physical margin associated with each applicable flood protection feature, determine if the margin provided is small, and evaluate any small margins that have potentially significant consequences through the corrective action process. The results of this effort were to be maintained on site for future NRC audits.
Following the NRC's initial review of the walkdown reports, regulatory site audits were conducted at a sampling of plants. Based on the walkdown report reviews and site audits, the NRC identified additional information necessary to allow the staff to complete its assessments.
Accordingly, by Reference 4, the NRC has issued a request for additional information (RAI). The RAI questions and NPPD's responses are provided in the Attachment.
This letter contains no new regulatory commitments and no revision to existing regulatory commitments. Should you have any questions regarding this submittal, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: i/Z///!
Sincerely, Kenneth Higginboth General Manager of lant Operations
/bk
Attachment:
Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns cc: Regional Administrator, w/attachment USNRC - Region IV Director, w/attachment USNRC - Office of Nuclear Reactor Regulation Cooper Project Manager, w/attachment USNRC - NRR Project Directorate IV-I Senior Resident Inspector, w/attachment USNRC - CNS NPG Distribution, w/attachment CNS Records, w/attachment
NLS201401 1 Attachment Page 1 of3 Attachment Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns Cooper Nuclear Station, Docket No. 50-298, DPR-46 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter requesting information per 10 CFR 50.54(f). The request for information letter contained specific requested actions, requested information and required responses associated with Recommendation 2.3 for flooding walkdowns. By letter on May 31, 2012, the NRC endorsed Nuclear Energy Institute (NEI) 12-07 as providing acceptable guidelines for performing walkdowns of plant flood protection features. Nebraska Public Power District (NPPD) submitted a final walkdown report for Cooper Nuclear Station (CNS) in response to the request for information on November 27, 2012.
Following the NRC's initial review of the walkdown reports, regulatory site audits were conducted at a sampling of plants. Based on the walkdown report reviews and site audits, the NRC identified additional information necessary to allow the staff to complete its assessments.
The NRC observed that several licensees did not always determine and document available physical margin (APM) in a consistent manner that met the expected interpretation of NEI 12-07.
On December 23, 2013, the NRC transmitted a request for additional information (RAI) regarding the determination and documentation of APM. Below are the NRC's RAI questions and NPPD's responses.
NRC Request:
Pleaseprovide the following:
- 1. Confirmationthat the processfor evaluatingAPM was reviewed; NPPD Response: NPPD confirms that it has completed a review of the process used at CNS to evaluate APM.
- 2. Confirmationthat the APM process is now or was always consistent with the guidance in NEI 12-07 and discussed in this RAI; NPPD Response: NPPD confirms the original walkdown effort was consistent with the guidance provided in NEI 12-07. A numerical value for a small APM was not initially established.
NLS2014011 Attachment Page 2 of 3
- 3. If changes are necessary, a generaldescriptionof any process changes to establish this consistency; NPPD Response: No changes were necessary as the original walkdown effort followed the guidance provided in NEI 12-07. While a numerical value for small APM was not established, judgment was used to determine if a feature had to be entered into CNS' Corrective Action Program (CAP). In response to this RAI, an engineering report, ER-14-001, was developed to determine a numerical value for small APM. This report concluded that features with one foot or more APM were determined to be not small. Features with less than one foot APM were entered into the CAP. In the case of building walls, the walkdown team judged that excess margin was available. As such, walls were not entered into the CAP, although the walkdown sheets state that the APM is zero.
- 4. As a result of the audits and subsequent interactionswith industry duringpublic meetings, NRC staff recognized that evaluation of APMfor seals (e.g., flood doors,penetrations,flood gates, etc.) was challengingfor some licensees. Generally, licensees were expected to use either Approach A or Approach B (describedbelow) to determine the APMfor seals:
a) If sealpressure ratings were known, the seal ratings were used to determine APM (similarto example 2 in Section 3.13 of NEI 12-07). A numerical valuefor APM was documented. No further action was performed if the APM value was greater than the pre-establishedsmall-margin thresholdvalue. If the APM value was small, an assessment of "significantconsequences" was performed and the guidance in NEI 12-07 Section 5.8 was followed.
b) If the sealpressure rating was not known, the APMfor seals in a flood barrieris assumed to be greaterthan the pre-establishedsmall-margin threshold value if the following conditions were met: (1) the APMfor the barrierin which the seal is located is greaterthan the small-margin threshold value and there is evidence that the seals were designed/procured,installed,and controlled asflooding seals in accordancewith the flooding licensingbasis. Note that in order to determine that the seal has been controlled as a flooding seal, it was only necessary to determine that the seal configurationhas been governed by the plant's design controlprocess since installation.In this case, the APM for the seal could have been documented as "not small".
As part of the RAI response, state ifeither Approach A or Approach B was used as partof the initial walkdowns or as part of actions taken in response to this RAI. No additionalactions are necessary if either Approach A or B was used.
If neither Approach A or B was used to determine the APM values for seals (either as part of the walkdowns or as part of actions taken in response to this RAI), then perform the following two actions:
Enter the condition into the CAP (note: it is acceptable to utilize a single CAP entry to capture this issue for multiple seals). CAP disposition of "undetermined"APM valuesfor seals should consider the guidance provided in NEI 12-0 7, Section 5.8. The
NLS2014011 Attachment Page 3 of 3 CAP disposition should confirm all seals can perform their intended safety function againstfloods up to the current licensing basisflood height.Disposition may occur as part of the IntegratedAssessment. If an IntegratedAssessment is not performed, determine whether there are significant consequences associatedwith exceeding the capacity of the seals and take interim action(s), if necessary, via the CAP processes.
These actions do not need to be complete prior to the RAI response.
- Report the APM as "undetermined"and provide the CAP reference in the RAI response.
NPPD Response: Approach "A" was used to determine APM for seals as part of the original walkdowns. As such, no additional actions are necessary.