ML14022A121

From kanterella
Jump to navigation Jump to search
Technical Specifications Task Force (TSTF) Fee Waiver for TSTF-542, Reactor Pressure Vessel Water Inventory Control
ML14022A121
Person / Time
Site: Technical Specifications Task Force
Issue date: 02/24/2014
From: Dyer J
NRC/OCFO
To:
Technical Specifications Task Force
Howard A
References
Download: ML14022A121 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555-0001 CHIEF FINANCIAL OFFICER February 24, 2014 Technical Specifications Task Force (TSTF) 11921 Rockville Pike Suite 100 Rockville, MD 20852

Dear Members of the TSTF,

On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your December 31, 2013, letter requesting a fee waiver under Title 10 of the Code of Federal Regulations (10 CFR) 170.11(a)(1)(iii) for review of TSTF Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.

The NRC has established regulations for granting fee exemptions under 10 CFR 170.11, Exemptions, for which licensees may apply in accordance with 10 CFR 170.5, Communications. The NRC has reviewed your request based on the following regulation, 10 CFR 170.11(a)(1)(iii):

  • 10 CFR 170.11 (a) No application fees, license fees, renewal fee, inspection fees, or special project fees shall be required for: (1) A special project that is a request/report submitted to the NRC-(iii) As a means of exchanging information between industry organizations and the NRC. In order for the fee waiver to be granted under this paragraph it must meet three criteria.

o (A) The report should be submitted for the specific purpose of supporting ongoing NRC generic regulatory improvements or efforts (e.g., rules, regulations, regulatory guides, and policy statements), and the agency, at the time the document is submitted, plans to use it for that purpose. The exemption applies even if ultimately the NRC does not use the document as planned.

Your December 31, 2013, letter articulates that TSTF-542 was developed in response to the NRCs Enforcement Guidance Memorandum (EGM) 11-003,

[EGM] on Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements during Operations with a Potential for Draining the Reactor Vessel. TSTF-542 addresses the Technical Specification (TS) for operations with a potential for draining the reactor vessel as identified in EGM-11-003. As a result, the NRC believes that TSTF-542 supports ongoing NRC generic regulatory improvement efforts; therefore, TSTF-542 satisfies this criterion.

TSTF o (B) The NRC must be the primary beneficiary of the NRCs review and approval of these documents. This exemption does not apply to a topical report submitted for the purpose of obtaining NRC approval for future use of the report by the industry to address licensing or safety issues, even though the NRC may realize some benefits from its review and approval of the document.

The NRC is the primary beneficiary of TSTF-542, because the NRC will use this document to aid in regulatory efforts with regard to revising the TS for operations with a potential for draining the reactor vessel. The revised TS will clarify the NRCs regulatory guidance and allow the NRC to provide better oversight to the industry. Thus, the NRC concludes that the TSTFs submission of TSTF-542 satisfies this criterion.

o © The fee exemption is requested in writing to the Chief Financial Officer in accordance with 10 CFR 170.5, and the Chief Financial Officer grants this request in writing.

The TSTFs fee exemption request was submitted in writing; therefore, TSTF-542 satisfies this criterion.

The NRC concludes that TSTF-542 meets all criteria under 10 CFR 170.11(a)(1)(iii); therefore, the fee waiver request is approved. If you have any technical questions regarding this matter, please contact Ms. Michelle Honcharik at 301-415-1774. Please contact Mr. Alexander Balkin, of my staff, at 301-415-5835 for any fee-related questions.

Sincerely,

/RA/

J. E. Dyer Chief Financial Officer cc: See next page

TSTF (B) The NRC must be the primary beneficiary of the NRCs review and approval of these documents. This exemption does not apply to a topical report submitted for the purpose of obtaining NRC approval for future use of the report by the industry to address licensing or safety issues, even though the NRC may realize some benefits from its review and approval of the document.

The NRC is the primary beneficiary of TSTF-542, because the NRC will use this document to aid in regulatory efforts with regard to revising the TS for operations with a potential for draining the reactor vessel. The revised TS will clarify the NRCs regulatory guidance and allow the NRC to provide better oversight to the industry. Thus, the NRC concludes that the TSTFs submission of TSTF-542 satisfies this criterion.

o (C) The fee exemption is requested in writing to the Chief Financial Officer in accordance with 10 CFR 170.5, and the Chief Financial Officer grants this request in writing.

The TSTFs fee exemption request was submitted in writing; therefore, TSTF-542 satisfies this criterion.

The NRC concludes that TSTF-542 meets all criteria under 10 CFR 170.11(a)(1)(iii); therefore, the fee waiver request is approved. If you have any technical questions regarding this matter, please contact Ms. Michelle Honcharik at 301-415-1774. Please contact Mr. Alexander Balkin, of my staff, at 301-415-5835 for any fee-related questions.

Sincerely,

/RA/

J. E. Dyer Chief Financial Officer cc: See next page DISTRIBUTION:

DPB R/F Michelle Honcharik Adams: Yes No Initials: AB SUNSI Review: AB Publicly Available Non-Publicly Available Sensitive Non-Sensitive ADAMS Accession No: ML14022A121 *via e-mail CFO-0009 OFFICE OCFO/DPB/ICPB OCFO/DPB/ICPB NRR/DPR/D OCFO/DPB OCFO/DPB NAME ABalkin/lmv1 DHolley LKokajko* RAllwein TGrancorvitz DATE 2/20/14 2/20/14 2/19/14 2/21/14 2/21/14 OFFICE A/DCFO NRR/OD* CFO NAME MMuessle ELeeds JUhle for JEDyer DATE 2/24/14 2/20/14 2/24/14 OFFICAL RECORD COPY

Technical Specifications Task Force (TSTF) Distribution List CC:

Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Brian Mann Telephone: 301-984-4400 E-mail: brian.mann@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, TX 76043 Telephone: 254-897-5727 E-mail: robert.slough@luminant.com Richard A. Loeffler Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 Telephone: 763-295-1247 E-mail: richard.loeffler@xenuclear.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 Telephone: 610-765-5726 E-mail: wendi.croft@exeloncorp.com Otto W. Gustafson Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Telephone: 269-764-2049 E-mail: ogustaf@entergy.com