ML14021A055
| ML14021A055 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 01/21/2014 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Limpias O Nebraska Public Power District (NPPD) |
| References | |
| 50-298/14-301 | |
| Download: ML14021A055 (3) | |
See also: IR 05000298/2014301
Text
January 21, 2014
Mr. Oscar A. Limpias, Vice President-Nuclear
and Chief Nuclear Officer
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR
LICENSING EXAMINATION 05000298/2014301
Dear Mr. Limpias:
In a telephone conversation on January 14, 2014 between Messrs. Ed Jackson, Operations
Training Instructor, and Kelly Clayton, Chief Examiner, arrangements were made for the
administration of licensing examinations at the Cooper Nuclear Station during the week of
July 28, 2014.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1123, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by May 9, 2014. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by June 6, 2014. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examinations and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled. In addition, your support for on-site validation of the examinations is required
during the week of June 23, 2014.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
O. Limpias
- 2 -
In accordance with ES-302, Sections D.3.f and D.3.p, your staff should retain all original
simulator performance data generated during the dynamic operating tests until the examination
results are final. This includes all parameters, chart recorder paper, and data files necessary for
licensing decisions.
Appendix E to NUREG-1021 contains a number of the NRC policies and guidelines that will be
in effect while the written examinations and operating tests are being administered.
To permit timely review and evaluation by the NRC, your staff should submit preliminary
operator and senior operator license applications (Office of Management and Budget (OMB)
approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and
waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Ed Jackson has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216, or myself
at 817-200-1159.
Sincerely,
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-298
License: DPR-46
O. Limpias
- 3 -
R:\\REACTORS\\CNS\\CNS 2014301 Init Exam Notif - kdc
ADAMS: No Yes
SUNSI Review Complete
Reviewer Initials: VG
Publicly Available
Non-Sensitive
Non-publicly Available
Sensitive
SOE: OB
C: OB
KClayton
VGaddy
/RA/
/RA/
1/21/14
1/21/14
OFFICIAL RECORD COPY