Other: CNL-14-030, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), CNL-14-131, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant, CNL-14-191, Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049, CNL-14-192, Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant, CNL-14-232, Closure of Open Item Discussed in Tennessee Valley Authority'S Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051), ML12307A105, ML13063A440, ML13247A288, ML13254A297, ML13261A038, ML14128A129
|
MONTHYEARML12307A1052012-10-29029 October 2012 Tennessee Valley Authority - Initial Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13063A4402013-02-28028 February 2013 Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13204A2312013-08-0202 August 2013 RAI Related Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI ML13247A2882013-08-28028 August 2013 First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) for Watts Bar Nuclea Project stage: Other ML13254A2972013-08-28028 August 2013 First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13261A0382013-08-28028 August 2013 Tennessee Valley Authority, Watts Bar, First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13254A0652013-09-0606 September 2013 Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Response to RAI ML13275A3732013-10-24024 October 2013 Interim Staff Evaluation and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI CNL-13-125, Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-11-22022 November 2013 Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ( Project stage: Response to RAI CNL-14-007, Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number2014-01-10010 January 2014 Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA Project stage: Response to RAI CNL-14-030, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-28028 February 2014 Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML14128A1292014-05-15015 May 2014 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other CNL-14-072, Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-02014-06-25025 June 2014 Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051 Project stage: Response to RAI ML14211A3462014-08-18018 August 2014 Report for the Westinghouse Audit in Support of Reliable Spent Fuel Instrumentation Related to Order EA-12-051 Project stage: Acceptance Review CNL-14-131, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant2014-08-28028 August 2014 Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant Project stage: Other CNL-14-192, Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant2014-10-29029 October 2014 Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant Project stage: Other CNL-14-191, Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-0492014-10-30030 October 2014 Compliance Status Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049). Project stage: Other CNL-14-232, Closure of Open Item Discussed in Tennessee Valley Authority'S Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2014-12-19019 December 2014 Closure of Open Item Discussed in Tennessee Valley Authority'S Compliance Letter in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Other ML15078A1932015-03-27027 March 2015 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2014-10-29
[Table View] |
|
---|
Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09
[Table view] |
Text
L44 140110 006 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-007 January 10, 2014 10 CFR 2.202 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
Subject:
Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation {Order Number EA-12-051} {TAC Nos. MF0951 and MF1178}
Reference:
Letter from TVA to NRC, "Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC Nos. MF0951 and MF1178)," dated November 22, 2013 On November 22, 2013, the Tennessee Valley Authority (TVA) submitted a response to the Nuclear Regulatory Commission (NRC) regarding a request for additional information (RAI) related to the Watts Bar Nuclear Plant (WBN) Overall Integrated Plan for reliable spent fuel pool instrumentation (referenced letter). TVA noted in Enclosure 2 of the referenced letter that some information would be provided by January 10, 2014, as vendor documentation and calculations were in progress. A teleconference was also held on December 19, 2013, between TVA and the NRC regarding additional questions and clarifications to the referenced letter.
The purpose of this letter is to provide a response to regulatory commitment 1 of Enclosure 2 to the referenced letter. This letter also provides responses to questions from the December 19, 2013, teleconference related to RAI questions 1 and 18c.
Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 January 10, 2014 Regulatory commitment 1a, b, c, and d stated TVA would provide results and notify the NRC that final vendor testing and qualification documentation supporting responses to RAI questions 5, 6, 12, and 15 is available for review. This documentation was scheduled to be complete by December 23, 2013. However, due to EMI/RFI testing issues, this documentation will not be completed until March 10, 2014. The enclosure to this letter revises regulatory commitment 1 to provide the results and notify the NRC that final vendor testing and qualification documentation supporting responses to RAI questions 5, 6, 12, and 15 is available for review by March 14, 2014.
Regulatory commitment 1e and f also stated TVA would provide results of the channel accuracy calculation for RAI questions 16 and 17 and notify the NRC that the calculation is available for review. The results of the calculated value of individual channel accuracy are within the acceptable criteria for any given channel configurations. This calculation is available for review.
During the December 19, 2013, teleconference call, clarification was requested regarding throttling of pump discharge as discussed in response to RAI question 1. Information has been added to the response as underlined below to address this clarification. Sketch 1 has also been revised to include the top and bottom vent elevations as shown. This revised response and Sketch 1 supersede those submitted in the referenced letter.
RAI-1
Please provide the results of the calculation used to determine the water elevation necessary for the pumps required NPSH to confirm that Level 1 has been adequately identified.
TVA Response Watts Bar Nuclear Plant (WBN) calculation EPM-JPJ-07-192 documents adequate net positive suction head (NPSH) at elevation 749.125 feet (normal pool level) for Spent Fuel Pool (SFP) temperatures up to 190 degrees Fahrenheit (F). Refer to Sketch 3 on page E1-23. During a BDB-EE, as temperatures rise above 190 degrees F, WBN will control by procedure the throttling of pump discharge to ensure adequate NPSH. The calculation detailing this throttling requirement for BDB-EE has not been issued at this time. WBN has documented this action in the Corrective Action Program Problem Evaluation Report (PER) 770244 and the scheduled completion of calculation and procedure update is by February 21, 2014. Throttling is required because the level 1 reference elevation cannot be raised to provide adequate NPSH above 190 degrees F since ventilation ductwork is approximately 0.8 feet (elevation 750.04 feet) above the existing 100% level (refer to Sketch 1). Access to SFP pumps, heat exchangers, and valves can be achieved from the Shutdown Board Room, shown in sketch 1, on elevation 757 through the Auxiliary Building access point and down the central stairway to elevation 737 or from the Auxiliary Building access point on elevation 713 and up the north or central stairway to elevation 737. Valves that would require manipulation based on which train of SFP cooling is being restored are located in the center south area of elevation 737.
U.S. Nuclear Regulatory Commission Page 3 January 10, 2014 Clarification to reference RAI-7a in response to RAI question 18c was also requested during the teleconference. This reference should be RAI-18a as underlined below in the revised response to RAI 18c. This revised response supersedes the one submitted in the November 22, 2013 letter.
RAI #18 Please provide the following:
c) A description of how calibration tests and functional checks will be performed and the frequency at which they will be conducted. Discuss how these surveillances will be incorporated into the plant surveillance program.
TVA Response c) A description of channel calibration or functional test is shown in the response for RAI-18a. TVA will perform periodic calibration verification using a periodic maintenance procedure. The periodic calibration verification will be performed within 60 days of a refueling outage considering normal testing scheduling allowances (e.g., 25%). Calibration verification will not be required to be performed more than once per 12 months. These calibration requirements are consistent with the guidance provided in NEI 12-02 section 4.3.
U.S. Nuclear Regulatory Commission Page 4 January 10, 2014 Sketch 1 POOL LEVELS AND REFERENCES Mounting ELEVATION REFERENCE Bracket OPERATING FLOOR LEVEL 757.0' 47W200-3 751.13' Top of Ventilation Duct Ref 48N1236-2 R7 750.04' Bottom Ventilation Duct Ref 47W920-7 R18 NORMAL WATER LEVEL (SFPI LEVEL 1) 749.21' 100% Level High water level Ref 47W855-1 R32 749.125' Normal Water Level Ref 47W855-1 Calculation EPM-JP-070192 WBN-78-D053 MEB-WBN-78 pg 23a 745.125' SFP suction strainer 47W454-3 Adequate Radiation Shielding (SFPI LEVEL 2) 734.29' NEI 12-02 section 2.3.2 (Top of Rack + 10 Feet)
Fuel Remains Covered (SFPI LEVEL 3) 724.79' Un-measurable zone.
Top of un-measurable zone is 0% Level TOP OF FUEL RACK 724.29' Top of Active Drawing DCA 38623-01-6 Fuel 722.78' L36 130208 801 BOTTOM LEVEL 709.23' 47W855-1
U.S. Nuclear Regulatory Commission Page 5 January 10, 2014 The Enclosure provides revised regulatory commitment 1. If you have questions regarding this matter, please contact Kevin Casey at (423) 751-8523.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 10th day of January 2014.
ea resident, Nuclear Licensing
Enclosure:
Revised List of Commitments cc (Enclosure):
NRC Regional Administrator- Region II NRR Director- NRC Headquarters NRR Project Manager - Watts Bar Nuclear Plant, Unit 1 NRR Project Manager- Watts Bar Nuclear Plant, Unit 2 NRC Senior Resident Inspector- Watts Bar Nuclear Plant, Unit 1
ENCLOSURE REVISED LIST OF COMMITMENTS
- 1. By March 14, 2014, TVA will:
- a. Notify the NRC that final vendor testing and qualification documentation for RAI
- 5 is available for review;
- b. Provide the results and notify the NRC that final vendor testing and qualification documentation for RAI #6 is available for review;
- c. Provide the results and notify the NRC that testing and qualification documentation for RAI #12 is available for review;
- d. Notify the NRC that testing and qualification documentation for RAI #15 is available for review; E1of 1