Request for Additional Information Changes to Security Plan Revision 18
ML13336A707
Person / Time
Site: Millstone, Monticello  Xcel Energy icon.png
Issue date: 12/04/2013
From: James Kim
Plant Licensing Branch 1
To: Heacock D
Dominion Nuclear Connecticut
Kim J
References
Download: ML13336A707 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 4, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION, UNITS 1, 2 AND 3- REQUEST FOR ADDITIONAL INFORMATION RE: CHANGES TO SECURITY PLAN REVISION 18

Dear Mr. Heacock:

By letter dated August 6, 2013 (Agencywide Documents Access and Management System Accession No. ML13224A247), Dominion Nuclear Connecticut, Inc., submitted Dominion's Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 18 for the Millstone Power Station. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations, Section 50.54(p}(2).

The NRC staff has determined that the enclosed request for additional information (RAI) is needed in order to complete the review. A response to this RAI is requested to be provided within 45 days of the date of this letter.

If you have any questions regarding this matter, please contact me at 301-415-4125.

Sincerely, James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-263, 50-336 and 50-423

Enclosure:

As stated cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING MILLSTONE POWER STATION UNITS 1. 2 AND 3 10 CFR 50.54{p)(2) CHANGES TO SECURITY PLAN DOCKET NOS: 50-263. 50-336 AND 50-423 By letter dated August 6, 2013 (Agencywide Documents Access and Management System Accession No. ML13224A247), Dominion Generation, submitted Dominion's Physical Security Plan (PSP), Training and Qualification Plan and Safeguards Contingency Plan, Revision 15 for the Millstone Power Station. The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(p)(2). The NRC staff has determined that the additional information requested below is needed to complete its review.

1. The NRC staff request clarification of the cameras depicted on Figure 11, Revision 3 of PSP, Revision 18. Describe the type of cameras (fixed or pan tilt zoom) and their purpose in the site's protective strategy.

Regulatory Basis: Consistent with 10 CFR 73.55 (c) Security plans. (1) Licensee security plans must describe: (i) How the licensee will implement requirements of this section through the establishment and maintenance of a security organization, the use of security equipment and technology, the training and qualification of security personnel, the implementation of predetermined response plans and strategies, and the protection of digital computer and communication systems and networks.

2. The description of changes did not address the cameras depicted in Figure 11, Revision 3 of the PSP, Revision 18. Since the barrier has been relocated confirm that these cameras continue to meet the description cited in Sections 15.2 and 15.3 of the PSP and these changes do not decrease the safeguards effectiveness of the security plan.

Regulatory Basis: Consistent with 10 CFR 73.55(i) Detection and assessment systems.

(1) The licensee shall establish and maintain intrusion detection and assessment systems that satisfy the design requirements of 10 CFR 73.55(b) and provide, at all times, the capability to detect and assess unauthorized persons and facilitate the effective implementation of the licensee's protective strategy.

Enclosure

ML13336A707 *via memo dated November 25, 2013 OFFICE LPL 1-1/PM LPL 1-1/LA NSIR/DSP/BC LPL 1-1/BC NAME JKim KGoldstein RCaldwell* BBeasley DATE 12/3/13 12/3/13 11/25/13 12/4/13