ML13333B359
| ML13333B359 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/28/1986 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML13333B360 | List: |
| References | |
| NUDOCS 8604070402 | |
| Download: ML13333B359 (3) | |
Text
March 28, 1986 INTEGRATED SAFETY ASSESSMENT PROJECT DIRECTORATE RECORD OF PHONE CONVERSATION Docket No. 50-206 DATE:
March 20, 1986 TIME:
1:00 pm EST PARTICIPANTS:
E. McKenna, T. Cheng, NRC M. Russell, EG&G, Idaho L. Shieh, LLNL T. Tsai, NCT Engineering J. Rainsberry, Southern California Edison M. Swatta, G. Hau, IMPELL
SUBJECT:
ANALYSIS OF INELASTIC BEAMS FOR SAN ONOFRE UNIT 1
SUMMARY
OF CONVERSATION:
The purpose of this discussion was to clarify aspects of SCE's proposal for treatment of inelastic beams. A draft of this proposal (attached) had been provided by the licensee to facilitate this call.
Questions discussed during this phone conversation are also attached. Most of the licensee's responses to the questions during the call seemed reasonable; further information will be provided by the licensee for question 6. Audit reviews of the calculations will be performed by the staff consultants in April. A revised version of Table 1 of the report and project instructions will be provided on April 7, 1986.
The final version of the beam analysis methodology report will be submitted on the docket.
Attachments:
As Noted DISTRIBUTION:
Central Files M. Russell, EGB PDR L. Shieh, LLNL LPDR T. Tsai, NCT T. Cheng J. Rainsberry, SCE R. Dudley M. Swatta, IMPELL E. McKenna
- SEE PREVIOUS CONCURRENCE.
ISAP:DPL-B*
ISAP:DPL-B*
ISAP:DPL EMckenna:lt TCheng CGrimes 03/25/86 03/25/86 03(ft/86 63604070402 860328 PDR ADOCK 05000206 P
INTEGRATED SAFETY ASSESSMENT PROJECT DIRECTORATE RECORD OF PHONE CONVERSATION Docket No.
50-206 DATE:
March 20, 1986 TIME:
1:00 p EST PARTICIPANTS:
E. McKenna, T. Cheng, NRC M. Russell, EG&G, Idaho L. Shieh, LLNL T. Tsai, NCT Engineerin J. Rainsberry, South n California Edison M. Swatta, G. Hau/IMPELL
SUBJECT:
ANALYSIS OF INELASTI BEAMS FOR SAN ONOFRE UNIT 1
SUMMARY
OF CONVERSATION:
The purpose of this discus ion was to clarify aspects of SCE's proposal for treatment of inelastic b ms. A draft of this proposal (attached) had been provided for preliminar staff comments. Questions discussed during this phone conversation are 1so attached. Most of the licensee responses to the questions during the 11 seemed reasonable; further information will be provided by the licen ee for question 6. Audit reviews of the calculations will be performed by the staff consultants in April. A revised version of Table 1 of the repo t and project instructions will be provided on April 7, 1986. The final v sion of the beam analysis methodology report will be submitted on the d cket.
Attachments:
As Noted DISTRIBUTION:
Central Files M. Russell, EGB PDR L. Shieh, LLNL T. Cheng T. Tsai, NCT R. Dudley J. Rainsberry, SCE E. McKenna M. Swatta, IMPELL ISAP:$tLO ISA B
ISAP:DPL-B EMckenna: t TCheen CGrimes 03/a5/86 03/{ /86 03/ /86
0 March 28, 1986 INTEGRATED SAFETY ASSESSMENT PROJECT DIRECTORATE RECORD OF PHONE CONVERSATION Docket No. 50-206 DATE:
March 20, 1986 TIME:
1:00 pm EST PARTICIPANTS:
E. McKenna, T. Cheng, NRC M. Russell, EG&G, Idaho L. Shieh, LLNL T. Tsai, NCT Engineering J. Rainsberry, Southern California Edison M. Swatta, G. Hau, IMPELL
SUBJECT:
ANALYSIS OF INELASTIC BEAMS FOR SAN ONOFRE UNIT 1
SUMMARY
OF CONVERSATION:
The purpose of this discussion was to clarify aspects of SCE's proposal for treatment of inelastic beams. A draft of this proposal (attached) had been provided by the licensee to facilitate this call.
Questions discussed during this phone conversation are also attached. Most of the licensee's responses to the questions during the call seemed reasonable; further information will be provided by 'the licensee for question 6. Audit reviews of the calculations will be performed by the staff consultants in April. A revised version of Table 1 of the report and project instructions will be provided on April 7, 1986. The final version of the beam analysis methodology report will be submitted on the docket.
Attachments:
As Noted DISTRIBUTION:
Central Files M. Russell, EGB PDR L. Shieh, LLNL LPDR T. Tsai, NCT T. Cheng J. Rainsberry, SCE R. Dudley M. Swatta, IMPELL E. McKenna