March 11, 1985 9
Docket No. 50-206 LICENSEE:
Southern California Edison Company FACILITY:
San Onofre Nuclear Generating Station, Unit No. 1
SUBJECT:
SUMMARY
OF FEBRUARY 27, 1985 MEETING REGARDING SEISMIC CRITERIA AND METHODOLOGY On February 27, 1985 a meeting was held in Bethesda, Maryland between representatives of Southern California Edison Company (SCE) and members of the NRC staff. The purpose of the meeting was to discuss the licensee's proposed criteria and methodology to be used in the San Onofre Unit No. 1 long term service seismic analysis program. Enclosure 1 is a list of attendees.
The licensee's overall schedule is shown in enclosure 2. SCE stated that they would like to have the staff's approval of the criteria and methodology during March.
SCE plans to submit its proposal on the docket by March 8, 1985.
The staff indicated that they foresee problems in being able to complete the review on this short schedule. In addition, the staff cautioned that pursuing new methodology could result in longer review time. The staff indicated that they would try to respond to SCE in about a week from when the submittal is received and that the response will indicate milestones for the NRC review.
Walter A. Paulson, Project Manager Operating Reactors Branch #5 Division of Licensing
Enclosures:
- 1. Attendee List
- 2. Licensee Schedule DISTRIBUTION Docket NRC PDR Local PDR ORB #5 Reading JZwolinski WPaulson CJamerson OELD EJordan BGrimes ACRS (10)
NRC Participants DL:ORB#5 DL:ORB#5 CJamerson 'b WPaulson JZwolinski 3/l /85 3/11/85
/11/85 8503150459 850311 PD DOC$K 05()006 PPDR APDR
- cc Charles R. Kocher, Assistant Joseph 0. Ward, Chief General Counsel Radiological Health Branch James Beoletto, Esquire State Department of Health Southern California Edison Company Services
.Post Office Box 800 714 P Street, Office Bldg. 8 Rosemead, California 91770 Sacramento, California 95814 David R. Pigott Kenneth P. Baskin, Vice President Orrick, Herrington & Sutcliffe Nuclear Engineering 600 Montgomery Street Licensing and Safety Department San Francisco, California 94111 Southern California Edison Company 2244 Walnut Grove Avenue Dr. Lou Bernath Post Office Box 800 San Diego Gas & Electric Company Rosemead, California 91770 P. 0. Box 1831 San Diego, California 92112 Pesident Inspector/San Onofre NPS c/o U.S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 Director Energy Facilities Siting Division Energy Resources Conservation &
Development Commission 1516 -
9th Street Sacramento, California 95814 U.S. Environmental Protection Agency Region TX Office ATTN:
Regional Radiation Representative 215 Freemont Street San Francisco, California 94105 John B. Martin, Penional Administrator Nuclear Regulatory Commission, Region V 1450 Maria Lane Walnut Creek. California 94596
ENCLOSURE 1 MEETING -
NRC/SCE ON SEISMIC CONCERNS Name AFFILATION John A. Zwolinski NRR/DL/ORB#5 Pandall D. Wheaton IMPELL Pei-Yinq Chen NRR/DL/SEPB Gordie Hau IMPELL Dennis M. Crutchfield NRR/DL Chris Grimes NRR/DL/SEPB Thomas Cheng NRR/DL/SEPB Mark Russell EGG Idaho, NRC Consultant Jack Rainsherry SCE Mark Medford SCE Mike Short SCE R. L. Cloud RLCA/SCE George J. Stawniczy SCE Jeff Yann SCE William Gallo IMPELL Walter A. Paulson NRC
ENCLOSURE 2 Schedule of Seismic Analysis, Design and Construction for SONGS-1 LTS Program MONTH Scope of Work March '85 April '85 May
'85 June
'85 July '85 Aug.
'85 Sept. '85 Oct.
'85 Nov.
'85 Dec. '85 Jan. '86 I
L I
A 3/11 4/22 SSI/Load Generation I
Large Bore Piping 3/11 6/17 Analysis 3/25 7/8 Support Qualification 6/3 11/1 Support Design 3/18 5/3 5/24 10/25 Small Bore Piping I
I Walk-I DeSign I
down 4/22 7/22 11/1 Equipment Analysis Design 7/29 12/1 2/1/81 Construction Outside Containment I
Inside Containment 1 Constrction0