ML13333A341
| ML13333A341 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/15/1979 |
| From: | Ottoson H SOUTHERN CALIFORNIA EDISON CO. |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7901240196 | |
| Download: ML13333A341 (1) | |
Text
Southern California Edison Company P.O. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 January 15, 1979 Director, Office of Nuclear Reactor Regulation Attention: Mr. D. L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Docket No. 50-206 Provisional Operating License No. DPR-13 Moderator Temperature Coefficient for Cycle 7 San Onofre Nuclear Generating Station, Unit 1 Gentlemen:
In our letter of December 15, 1978, discussing the Cycle 7 Physics Startup Test, the Moderator Temperature Coefficient (MTC) (BOL, HZP, ARO) was incorrectly stated to be -0.75 pcm/oF. The correct value is -1.6 pcm/oF.
The difference between the corrected MTC and the predicted value of -1.2 pC/oF remains within the Review and Acceptance Criteria limit of +3 pcm/ppum.
Should you have any questions, please contact me.
Sincerely, H. L. Ottoson Manager, Nuclear Generation cc: R. H. Engelken (Director, OIE, Region V) 790124