AC40 - RA NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206 DATE 1/3/79 COMPLETED BY Wayne GoUld TELEPHONE (714) 492-7700 OPERATING STATUS I. Unit Name:
San Onofre Nuclear Generating Station - Unit 1
- 2. Reporting Period: December 1 to December 31, 1978
- 3. Licensed Thermal Power (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
456
- 5. Design Electrical Rating (Net MWe): 436
- 6. Maximum Dependable Capacity (Gross MNe): 456
- 7. Maximum Dependable Capacity (Net MWe):
436
- 8. If Chgs Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N.A.
- 10. Reasons For Restrictions, If Any:
N.A.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 8,760 101,216.3
- 12. Number Of iours Reactor Was Critical 737.01 7,156.58 74,715.88
- 13. Reactor Reserve Shutdown Hours 0
0 731.82 7,023.26 71,247.42
- 14. Hours Generator On-Line 0
.0 U
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 972,362 8,538,342 91,008
- 17. Gross Electrical Energy Generated (MWH) 329,400 2,830
- 18. Net Electrical Energy Generated (MWH) 313,845 2,678,860 29,491,835 98.36 80.7 13.8
- 19. Unit Service Factor 98.36 80.17-
/3.6
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 96.75
.14
/1.
96.75 70.14 11.3
- 22. Unit Capacity Factor (Using DER Net)
. 38
..3
- 23. Unit Forced Outage Rate 0
.338
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
None
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N.A.
- 26. Units In Test Status (Prior to Commercial Operation):
N.A.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 7 9 0 3100 2 4_4E rSSO(
) 371 NEW 8/78
AVERAGE DAILY UNIT POWER LEVEL 56-206 DOCKET NO.
UNIT SONGS 1 DATE 1/3/79 COMPLETED BY Wayne Gould TELEPHONE (714) 492-7700 MONTH
- December, 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' (MWe-Net (MWe-Net) 431 17 432 432 18 431 3
404 19 431 4
431 20 130 5
432 21 432 6
432 22 431 434 432 8
432 24 433 432 435 9
1-5 16 433
_-6_435 434 24 434 433 18 433 13 431
)g 431 14 433 30 431 1s 434 31 431 16 433 PSSO 1) 311 NEW 8/78
50-206 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME SUNbb I DATE 1/3/79 REPORT MONTH.December, 1978 COMPLETED BY Wayne Gould TELEPHONE (71) 492-7700 Licensce Cause & Corrective
_3 Date Event 7Action to Reporit Prevent Recurrence 38 12-03-78 S
0 B
4 NA HC HTEXCH Load reduced for heat treatment of circulating water system and for turbine stop and control valve testing 39 12-20-78 S
12.18 E
1 NA ZZ ZZZZZZ NRC Oper. License Test.
4 F: Forced Reason:
Method I
F Inst ructjols S: Scheduled A-Equipment Failure (Explain) 1 -Man md Ior Ptepara tt Data B-Maintenance oi Test 2-Manual Scram.
Entr Shees toi Licensee C-Refueling 3-Automatic Scram.
Eveni Repmi IIR) File (NIREC, D-Regulatory Restriction 4-0ther 0 xplain) 0161)
F-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
V-xhihii 1-- Smw Source 4--Ohhee (Explain)
PSSO(v Re7 NEWF
/78
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-206 UNIT SONGS 1 DATE 1/3/79 COMPLETED BY Wayne Gould TELEPHONE (714) 492-7700 12/1/78 Unit operating at full load 451 MWe gross.
Reactor power at 100%.
12/3/78 Unit load reduced to 360 MWe net at 0730 for heat treatment of circulating water system and turbine stop and control valve test.
12/3/78 Unit returned to full load at 1300. Reactor power 100% after completion of heat treatment.
12/20/78 Started unit load reduction at 0300 for operator testing and minor maintenance.
Unit off line at 0451.
12/20/78 Unit on line at 1702.
Unit returned to full load 450 MWe gross at 2255. Reactor power at 100%.
12/31/78 Unit load at 450 MWe gross. Reactor power 100%.
PSSO(l ) 371 NEW 8/78
REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS 1 DATE 1/3/79 COMPLETED BY Wayne Gould TELEPHONE (714) 492-7700
- 1. Scheduled date for next refueling shutdown.
March 21, 1980
- 2. Scheduled date for restart following refueling.
May 5, 1980
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No changes expected at this date.
What will these be?
N.A.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
N.A.
- 5. Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None
- 6. The number of fuel assemblies.
a) In the core 157 b) In the spent fuel storage pool.
58
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
January 11, 1983 esso(t) 371 NEW 8/78