Provides Revised Schedule for Submittal of Amend Application to Revise Overpressure Mitigation Sys Tech Specs Covering Heatup & Cooldown Curves & Assumed Flow Capacity of Porvs. Amend Application Delayed from 900131 to 900330
ML13331B252
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/30/1990
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9001310275
Download: ML13331B252 (2)


Text

Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 F. R. NANDY January 30 1990 TELEPHONE MANAGER OF NUCLEAR LICENSING January 3 1990 (714) 587-5400 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Overpressure Mitigation System San Onofre Nuclear Generating Station Unit 1 This letter provides a revised schedule for the submittal of an Amendment Application to revise the Overpressure Mitigation System (OMS) Technical Specifications. This Amendment Application was to be provided to you by January 31, 1990. Due to the extensive engineering analysis effort required to resolve all OMS issues, we now expect to submit this Amendment Application by March 30, 1990.

In our letter dated November 6, 1989, we stated that we were proceeding with a detailed and comprehensive review of the design basis of the OMS. As a result of this review, SCE has revised the entire design basis of the OMS. Some of the more significant revisions include the following:

1. The guidance provided in the NRC's Standard Review Plan 5.2.2, Rev.

2 was used to develop the OMS set point.

2. The heatup and cooldown curves were revised.
3. The assumed flow capacity of the PORV's was revised.
4. The RHR design basis considerations were incorporated into the OMS design basis.
5. The system configuration to meet the single failure criteria was identified.

The review required the development of six design calculations and revision to one existing calculation. These calculations are currently being independently reviewed. The Amendment Application will provide a detailed discussion of the revisions to the OMS design basis.

PDC L

K________

Document Control Desk January 30, 1990 If you have any questions, or if you would like additional information, please let me know.

Sincerely, cc:

J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3