ML13331A312
| ML13331A312 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/06/1989 |
| From: | Nandy F SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEB-88-011, IEB-88-11, NUDOCS 8903090422 | |
| Download: ML13331A312 (4) | |
Text
Southern California Edison Company P 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 F R.NANDY TELEPHONE MANAGER OF NUCLEAR LICENSING March 6, 1989 (818) 302-1896 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 NRC Bulletin 88-11, "Pressurizer Surge Line Thermal Stratification" San Onofre Nuclear Generating Station Unit 1 On December 20, 1988, the NRC issued Bulletin No. 88-11, ""Pressurizer Surge Line Thermal Stratification."
It requests all addressees to establish and implement a program to confirm pressurizer surge line integrity in view of the occurrence of thermal stratification and requires them to inform the staff of the actions taken to resolve this issue.
In order to satisfy the requirements and schedules of Bulletin 88-11, SCE is participating in a program for partial resolution of this issue through the Westinghouse Owner's Group (WOG) for San Onofre Unit 1.
The WOG program was approved at the October 1988 meeting of the group and has the following objectives:
o Develop a generic Justification for Continued Operation (JCO) to assure that plant safety is not compromised while the effects of thermal stratification are being determined.
o Collect and summarize relevant design, operational, analytical, and test data for as many WOG plants as possible. In addition, a representative sampling, of approximately ten plants, will be selected to perform a review of plant records and conduct interviews with operations personnel.
o Evaluate data and identify and prioritize significant parameters contributing to this issue. Categorize (group) plants based on these parameters.
Document Control Desk
-2 o
Recommend additional monitoring to supplement the existing transient data base required to bound all WOG plants.
o Estimate the effect of thermal stratification on fatigue life as a function of key parameters.
o Recommend short term and long term actions.
The HOG program is designed to benefit from the experience gained in the performance of several plant specific analyses on Westinghouse PWR surge lines.
These detailed analyses included definition of revised thermal transients (including stratification) and evaluations of pipe stress, fatigue usage factor, thermal striping, fatigue crack growth, leak-before break, and support loads. The overall analytical approach used in all of these analyses has been consistent and has been reviewed in detail by the NRC staff. A significant amount of surge line thermal monitoring data has been obtained in support of these plant specific analyses. Additional surge line thermal monitoring and plant system data continues to be made available within the HOG, resulting in a steadily increasing data base. A significant amount of progress has been accomplished toward meeting these objectives.
To date, the HOG has completed approximately 80% of the effort of assembling plant specific design information on all domestic Westinghouse PHRs (55 units total).
This effort will establish the range of key design parameters and permit grouping of plants based on these parameters.
Based on the.information assembled to date, and the experience gained in plant specific analyses and monitoring programs, the HOG evaluation has resulted in the following observations regarding plant similarity and thermal stratification:
- 1. Thermal stratification (> 100*F) has been measured on all surge lines for which monitoring has been performed and which have been reviewed by the HOG to date (7 plants).
- 2.
The amount of stratification measured and its variation with time (cycling) varies.
This variation has been conservatively enveloped and applicability demonstrated for plant specific analyses.
Additional monitoring data representing a wider range of surge line configurations may be needed in order to demonstrate the applicability of these thermal stratification transients to other Westinghouse units.
- 3. Significant factors which can influence the structural effects of stratification are:
- a. Location and design of rigid supports and restraints
- b. Pipe layout geometry and size
- c. Type and location of piping components
Document Control Desk
-3
- 4. Although the material and fabrication techniques for Westinghouse surge lines are reasonably consistent and of high quality, the design parameters listed in item 3 vary among Westinghouse PWRs.
This variation in design is primarily a result of plant specific routing requirements. This variability is currently being examined in order to assess the feasibility of a bounding analysis approach.
These observations developed through the on-going WOG program indicate that the development of thermal stratification loadings and the evaluation of fatigue, considering these loadings, is a complex process.
Therefore, in order to precisely evaluate stratification, additional time is needed.
While more time is needed to evaluate the stratification issue in detail, the NDE inspection history at San Onofre Unit 1, as well as all other domestic Westinghouse designed PWR's, has not revealed any service induced degradation in the surge line piping that has been attributed to thermal stratification.
In addition, all the plant specific analyses performed to date that have included the loadings due to stratification and striping have validated the "leak-before break" concept and have substantiated a 40-year plant life.
Thus, a prudent approach for providing a detailed evaluation of the effects of surge line stratification would be to follow the WOG program grouping evaluation recommendations and monitor as determined to be appropriate.
The HOG soon expects to complete a grouping evaluation for the purpose of recommending a list of additional plants where thermal monitoring is needed.
The time required for this additional monitoring will be dependent on plant outage schedules.
To assure that the plant safety is not compromised within the requested period of schedule extension, a 300 will be submitted to the staff. The 300 which is currently being developed, will be submitted to the staff by May 4, 1989.
The 300 will utilize the information, experience, and monitoring data obtained through the WOG program, and will support the alternate schedule discussed herein.
SCE hereby requests an alternate schedule to that requested in Bulletin 88-11.
A schedule of two years, from receipt of the Bulletin, is considered sufficient time to obtain the necessary additional monitoring data, define thermal transients, perform all required analyses and update the stress and fatigue analyses to ensure compliance with applicable code and regulatory requirements.
This schedule, though different from that requested in action l.b of Bulletin 88-11, is consistent with the requirement to update the stress and fatigue analyses within two years as stated in action l.d of the Bulletin. As previously stated, the JCO which is currently being developed, will be submitted by SCE to the staff by May 4, 1989.
0 0
Document Control Desk
-4 At this time, SCE's request for an alternate schedule applies only to item 1.b of NRC Bulletin 88-11.
SCE intends to comply with all other requirements of the Bulletin.
Very truly yours, F. R. Nandy cc:
J. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3