ML13330B516

From kanterella
Jump to navigation Jump to search
Advises That Util Continuing to Update Emergency Operating Instructions to Reflect Plant Mods Implemented During Refueling Outage.Procedures Generation Package,Including Writers Guide,To Be Revised in 30 Days After Return to Svc
ML13330B516
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/30/1989
From: Nandy F
Southern California Edison Co
To:
NRC/IRM
References
NUDOCS 8904040262
Download: ML13330B516 (1)


Text

Southern California Edison Company P. 0.

BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 F

R NANDY TELEPHONE MANAGER OF NUCLEAR LICENSING March 30, 1989 (8181 302-1896 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Procedures Generation Package (PGP) Review San Onofre Nuclear Generating Station Unit 1

Reference:

Letter from M. 0. Medford, SCE, to NRC Document Control Desk, regarding SONGS 1 PGP Review dated June 8, 1988 The referenced letter provided SCE's responses to NRC comments on the Procedures Generation Package Review for San Onofre Unit 1. The responses indicated SCE's plans to update or consider update of the Emergency Operating Instructions (EOIs) and the EOI Writer's Guide, or provide the justification for not doing so. As indicated in SCE to NRC letter dated January 6, 1989, the status of comments under consideration was to be provided to you by March 31, 1989. The purpose of this letter is to inform you that SCE is continuing to update the EOIs to reflect plant modifications being implemented during this refueling outage, as well as changes to reflect NRC comments on the PGP.

SCE will complete all necessary EOI revisions prior to startup from this refueling outage. The PGP, including the EOI Writer's Guide, will be revised within 30 days after return to service. SCE will provide the NRC with a detailed status addressing how the NRC's comments were dispositioned in the PGP and EOI Writer's Guide. This detailed status will be provided within 60 days after return to service from this refueling outage.

If you have any questions or require additional information, please let me know.

Very truly yours, 63904040262 890330 PD DC PNU~

cc: J. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3