Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 F. R. NANDY TELEPHONE MANAGER OF NUCLEAR LICENSING (818) 302-1896 January 20, 1989 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Recertification of Charging Pump Motor Rating San Onofre Nuclear Generating Station Unit 1 By letter dated December 29, 1988, the report for the recertification of the charging pump motors and the justification for continued operation for the rewound charging pump motor were provided to you. Also included with that letter as an Enclosure 3 was the results of the confirmatory load tests required by License Condition 3.L(5). The letter incorrectly indicates that the confirmatory load test information would be provided by January 6, 1989.

The reason for this confusion is that the letter you received dated December 29, 1988 was an earlier version which would have been sent in the event the evaluation of the confirmatory load tests had not been completed.

The confirmatory load tests were in fact completed and the results which indicated that the loads assumed for the pumps in the diesel generator loading calculation are appropriate was provided as Enclosure 3 to the letter dated December 29, 1988. The letter should have indicated that Enclosure 3 was included instead of stating that the information would be provided by January 6, 1989. Accordingly the information provided as Enclosure 3 to the December 29, 1988 letter is valid. Therefore, this letter documents and confirms your receipt of the confirmatory load tests information and corrects the letter sent to you on December 29, 1988.

If you have any questions regarding this matter, please let me know.

Very truly yours, cc:

3. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 8901240159 -890.120 PDR _ADf'CCOCK 05000206