Forwards Revised Pump Relief Request 2 Re Alternate Testing of Four Diesel Fuel Transfer Pumps.Hardware Mods Will Be Completed & Alternate Testing of Diesel Fuel Transfer Pumps Will Be Started by End of Cycle XI Refueling
ML13330B359
Person / Time
Site: San Onofre 
Issue date: 08/03/1988
From: Medford M
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808090283
Download: ML13330B359 (2)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 MO.MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING August 3, 1988 (818) 302-1749 AND LICENSING U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-206 Inservice Testing Program for Pumps and Valves San Onofre Nuclear Generating Station Unit 1

References:

A) Letter dated December 28, 1987, from M. 0. Medford (SCE) to the NRC, Inservice Testing Program for Pumps and Valves B) Letter dated November 4, 1987, from M. 0. Medford (SCE) to the NRC, Fifth Edition of the Integrated Implementation Schedule (IIS)

By Reference A, Southern California Edison (SCE) submitted to the NRC a revised Inservice Testing program for pumps and valves for San Onofre Unit 1.

Pump Relief Request (PRR) No. 2 in this revised program specified alternate testing for the four diesel fuel transfer pumps and stated that this alternate testing would commence "by the end of the next refueling outage," which is Cycle X. However, by Reference B, SCE had previously informed the NRC that IST modifications had been rescheduled to Cycle XI.

This letter is to clarify that since alternate testing of the diesel fuel transfer pumps requires hardware modifications, these modifications will be completed and alternate testing will be started by the end of Cycle XI refueling. A revised copy of PRR No. 2 based on this correction is enclosed.

If you have any questions, please call me.

Very truly yours,

~41 Enclosure cc:

J. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 8sO8o9ci2s3 88083 0 PDR ADOCK 050o0206 PDC

Revision 2 (7/88)

PUMP RELIEF REQUEST NO. 2 SYSTEM:

Diesel Fuel Oil - Storage and Supply COMPONENT:

Diesel Fuel Transfer Pumps G-74A, G-74B, G-75A, G-75B CLASS:

3 FUNCTION:

To provide makeup fuel to diesel generator day tank.

TEST REQUIREMENT:

Measure pump bearing vibration and temperature, and observe lubrication level per Article IWP-3000.

BASIS FOR

,RELIEF:

The Diesel Fuel Transfer Pumps are submergence type pumps located inside diesel fuel storage tanks and are not accessible. Therefore, it is not possible to measure bearing vibration or temperature. The pumps are submerged in diesel fuel.

The diesel fuel provides lubrication for the bearings.

ALTERNATE TESTING:

Vibration of the pump motor thrust bearing will be measured and trended on a quarterly basis to provide indirect indication of pump degradation. This activity will commence by the end of the Cycle XI refueling outage.