Southern California Edison Company P. 0.
BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M.O.MEDFORD June 9, 1987 TELEPHONE MANAGER OF NUCLEAR ENGINEERING (818) 302-1749 AND LICENSING U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-206, 50-361 and 50-362 San Onofre Nuclear Generating Station Units 1, 2 and 3
References:
- 1. AEC to Bechtel Corporation letter dated January 15, 1973
- 2. NRC to TVA letter dated January 7, 1983 The purpose of this letter is to request NRC approval of Bechtel Topical Report BN-TOP-1, Rev. 1, 1972 (Enclosure I) for use at San Onofre Units 1, 2 and 3 as the basis for the performance of a short duration Type A containment leak rate test. Appendix 3 to 10 CFR 50 endorses ANSI N45.4 (Enclosure II) as the NRC acceptable test criteria for the performance of Type A containment leak rate testing. This ANSI standard states:
"If it can be demonstrated to the satisfaction of those responsible for the acceptance of the containment structure that the leakage rate can be accurately determined during a shorter test period, the agreed-upon shorter period may be used."
(ANSI N45.4-1972, Section 7.6)
The Atomic Energy Commission approved Bechtel Topical BN-TOP-1, Rev. 1 for referencing in Safety Analysis Reports (Reference 1) and the NRC subsequently approved this report for use as the Type A test acceptance criteria for Tennessee Valley Authority's Sequoyah Nuclear Plant (Reference 2).
SCE intends to use BN-TOP-1, Rev. I as the basis for a short duration Type A test during the upcoming San Onofre Unit 2 refueling outage scheduled to begin in August 1987. SCE requests specific NRC approval of BN-TOP-1, Rev. 1 for use at San Onofre Units 1, 2 and 3 prior to the start of the Unit 2 outage.
If you have any questions, please contact me.
Very truly yours, 8706160543 870609 T(
PDR ADOCK 05000206 P
PDRL Enclosures cc: R. F. Dudley, NRR Project Manager, San Onofre Unit 1 H. Rood, NRR Senior Project Manager, San Onofre Units 2 and 3 J. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3