Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M. 0. MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING (818) 302-1749 AND LICENSING March 16, 1987 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Progress on Selected Regulatory Projects San Onofre Nuclear Generating Station Unit 1
Reference:
Letter, M. 0. Medford, SCE, to Document Control Desk, NRC, dated February 10, 1987 Enclosed with this letter is the seventeenth edition of our description of the progress on selected regulatory projects now ongoing for San Onofre Unit 1. The previous description of this status was submitted via the reference.
When we started providing monthly updates of the information in this letter, we included updates on major ongoing programs such as Seismic Reevaluation, Environmental Qualification and Fire Protection. At that time we had only recently restarted San Onofre Unit 1 from an extended outage. The Davis-Besse event which occurred in June 1985 brought to the attention of the NRC Commissioners a number of plants which had a large number of major outstanding regulatory projects. It was our understanding that San Onofre Unit 1 was on that list primarily because of the unresolved seismic reevaluation program. We have subsequently had another major refueling/backfit outage during which all three of the major projects identified above were completed, including the seismic program. Of the five projects which remain in the enclosure, none are of the magnitude of the three earlier projects.
Four of the projects are included in our Integrated Living Schedule (ILS) which is updated every six months. We expect the fifth project to be completed shortly with any backfits subsequently identified on the ILS.
There does not appear to be a continuing need to have monthly reports on these 8703240382 870316
\\
PDR ADOCK 05000206 R
Document Control Desk March 16, 1987 projects. The plant operating information is available in the monthly reports and can be provided by telephone to our Project Manager on a monthly basis as required. Accordingly, please advise us of the need for continuing these reports.
If you would like to discuss this further or if there are any questions on these projects, please contact me.
Very truly yours, Enclosure cc:
R. F. Dudley, NRR Project Manager, San Onofre Unit 1 J. 8. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3
Enclosure PROGRESS ON SELECTED REGULATORY PROJECTS SAN ONOFRE UNIT 1 EDITION 17 Introduction The following is the seventeenth edition of the progress* on selected regulatory projects at San Onofre Unit 1.
Third Train of Auxiliary Feedwater There has been no change in the status of this item.
TDI Diesel Generators There has been no change in the status of this item.
Control Room Habitability There has been no change in the status of this item.
Supplement 1 to NUREG-0737 There has been no change in the status of this item.
Inadequate Core Cooling There has been no change in the status of this item.
Reactor Trips Experienced in Last Twelve Months In the last twelve months there have been three reactor trips. They occurred on July 17, 1986; August 5, 1986 and March 10, 1987.
Previous Month's Plant Availability The Availability of San Onofre Unit 1 for the month of February 1987 was 100%.
Progress represents the submittal of information to the NRC, completion of a modification with a regulatory due date, meetings or site visits by the NRC staff or their contractors.
Internal actions by SCE or the NRC staff continue on each item but are not reported in this document.
GEH:5077F