Ro:On 791108,discovered Missing Support on Radwaste Disposal Sys Piping Outside containment.Two-day Engineering Evaluation Undertaken to Determine Pipe Operability During Earthquake.New Piping Sys Will Be Installed.Rept to Follow
ML13330A796
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/09/1979
From: Curran J
SOUTHERN CALIFORNIA EDISON CO.
To:
References
79-293, NUDOCS 7911300485
Download: ML13330A796 (3)


Text

REGULATURONFORMATION DISTRIBUTION SOTEM (RIDS)

ACCESSION N8R:7911300485 DOC.DATE: 79/11/09 NOTARIZED: NO DOCKET #

FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206

-AUTH,NAME AUTHOR AFFILIATION CURRANJ.M, Southern California Edison Co, RECIPNAME RECIPIENT AFFILIATION

SUBJECT:

RO:on 791108,discovery of missing support on radwaste disposal sys piping outside containment.Two-day engineering evaluation undertaken to determine pipe operability during earthquakeNew piping sys will be installed,Rept to follow.

DISTRIBUTION CODE; AU02S COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Incident Reports NO'I'ES Z L RECIPIENT COPIES RLC1PIENT COPIES 10 CODE/NAME LTTR ENGL I CODE/NAME LTTR ENCL ACTION:

05 BC 4

INTERNAL:

1 R 1

02 NRC PDR 1

0 2

11 MPA 3

14 TA/EDO 1

15 NOVAK/KNIEL 1

16 EE8 i

17 AD FOR ENGR 1

18 PLANT SYS BR 1

19 I&C SYS BR 1

20 AD PLANi SYS 1

22 REAC SAFT BR 1

23 ENGR BR 1

24 KREGER I

25 PWR SYS BR 1

26 AD/SITE ANAL 1

27 OPERA LIC BR 1

1 28 ACDENT ANLYS i

29 AUX SYS BR 1

1 E JORDAN/IE 1

MANAUERS, 1

STS GROUP LEADR i

TMI-H STREET 1

EXTERNAL: 03 LPDR 1

04 NSIC 1

29 ACRS 16 1

DEC TOTAL NUMBER OF COPIES REQUIRED: LTTR ANT ENCL

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 November 9, 1979

'r\\

U. S. Nuclear Regulatory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94596 Attention:

Mr. R. H. Engelken, Director Docket No. 50-206 San Onofre Unit 1

Dear Sir:

This letter confirms telephone notification to Mr. L. Miller of the Office of Inspection and Enforcement, Region V, on November 8, 1979 of a matter reported in accordance with Section 6.9.2.a(9) of the San Onofre Unit 1 Technical Specifications.

The matter reported was the discovery of a missing support on the Radwaste Disposal System piping outside containment which is required to assure that the operability of the piping will not be jeopardized during an earthquake as defined in the Final Safety Analysis Report (FSAR).

In accordance with IE Bulletin No. 79-14, a field verification/

inspection was performed on the Radwaste Disposal System piping outside containment downstream of the containment penetration to verify that the seismic analysis input information for the piping conforms to the actual as-built configuration of the piping.

As a result of the field verification/

inspection, a missing support was identified, and as required by IE Bulletin No. 79-14, a two day engineering evaluation was undertaken to determine if the operability of the piping might be jeopardized during an earthquake. The engineering evaluation involved re-running the original seismic stress analyses assuming the support was missing. The results of the evaluation indicate that portions of the piping would be overstressed above allowables during an earth quake. Accordingly, as discussed with Mr. L. Miller, a new piping support will be installed during a current station outage to conform the piping system to the seismic analysis input information.

As discussed above, this matter is being reported in accordance with Section 6.9.2.a(9) of the Technical Specifications. A more detailed report I1\\y 7 9113 0o

Mr. R. H. Engelken, NRC November 9, 1979 on this matter, together with a completed Licensee Event Report form, will be submitted within two weeks.

Sincerely, J. M. Curran Plant Manager cc:

Director, Office of Inspection of Envorcement Division of Reactor Operations Inspection