ML13329A267

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-206/93-10,50-361/93-10 & 50-362/93-10 on 930503-07.No Violations or Deviations Noted
ML13329A267
Person / Time
Site: San Onofre  
Issue date: 06/09/1993
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13329A268 List:
References
NUDOCS 9306240037
Download: ML13329A267 (3)


See also: IR 05000206/1993010

Text

o

E-UNITED

STATES

ANUCLEAR

REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CALIFORNIA 94596-5368

Dockets:

50-206, 50-361, 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harold B. Ray

Senior Vice President, Nuclear

Subject:

NRC INSPECTION OF SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1,

2 AND 3 REPORT NOS. 50-206/93-10, 50-361/93-10 AND 50-362/93-10

This refers to the routine inspection conducted by Mr. Louis C. Carson II of

this office on May 3-7, 1993, of the activities authorized by NRC License Nos.

DPR-13, NPF-10, and NPF-15, and to the findings discussed with Mr. J. Fee and

other members of your staff identified in the enclosed report.

Areas examined during this inspection are described in the enclosed inspection

r.eport.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No violations or deviations were identified during this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

Ross A. Scarano, Director,

Division of Radiation Safety and

Safeguards

Enclosure:

Inspection Report Nos. 50-206/93-10, 50-361/93-10, 50-362/93-10

9306240037 930609

PDR ADOCK 05000206

G

PDR

2

Inspection Report Nos. 50-206/93-10, 50-361/93-10, 50-362/93-10

Mr. Harold B. Ray

Senior Vice President, Nuclear

cc w/enclosures:

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas

and Electric Co.

James A. Beoletto, Esq., Southern California Edison Company

Chairman, Board of Supervisors, County of San Diego

Alan R. Watts, Esq., Rourke & Woodruff

Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department

Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power

Mr. R. W. Krieger, Station Manager, Southern California Edison Company

Mr. Don J. Womeldorf, Chief, Environmental Management Branch

Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation

Mr. Robert G. Lacy, Manager Nuclear Department

Mr. Steve Hsu, Radiologic Health Branch

Mayor, City of San Clemente

III)

3

Inspection Report Nos. 50-206/93-10, 50-361/93-10, 50-362/93-10

Mr. Harold B. Ray

Senior Vice President, Nuclear

bcc w/enclosures:

Docket File

G. Cook

B. Faulkenberry

Resident Inspector

Project Inspector

bcc w/o enclosures:

M. Smith

J. Zollicoffer

LCarson

es

[RE

T COPY] [R

T COPY] [SENWTO DCS ] [.kVD TO PDR

  • (YES

NO ][

ES

NO I [

E

NO ]

YE

NO

230031