ML13329A264

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-206/93-09,50-361/93-09 & 50-362/93-09 on 930401-0512.No Violations Noted
ML13329A264
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/11/1993
From: Vandenburgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13329A265 List:
References
NUDOCS 9306240024
Download: ML13329A264 (3)


See also: IR 05000206/1993009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CAUFORNIA 94596-5368

JUN 1 1 19

Docket Nos. 50-206, 50-361, 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harold B. Ray, Senior Vice President, Nuclear

SUBJECT: NRC INSPECTION REPORT NOS. 50-206, 361, 362/93-09

This refers to the routine inspection conducted by Messrs. C. W. Caldwell, J.

J. Russell, D. L. Solorio and T. B. Sundsmo from this office and Messrs. C. M.

Regan, S. P. Sanchez, C. C. Harbuck and J. R. Ball from the office of Nuclear

Reactor Regulation on April 1 through May 12, 1993, of activities authorized

by NRC License Nos. DPR-13, NPF-10 and NPF-15 and to the discussion of our

findings held by the inspectors with Mr. R. W. Krieger and other members of

the Southern California Edison staff on May 21, 1993.

Areas examined during this inspection are described in the enclosed inspection

report.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel,

and observations by the inspectors.

No violations of NRC requirements were identified within the scope of this

inspection. However, weaknesses were noted with Unit 1 procedures used for

sluicing spent resin from the demineralizer to the spent resin storage tank.

While we recognize that your staff is still evaluating the cause of the

apparent resin backup in the piping, these weaknesses contributed to a lack of

understanding of why high radiation levels developed in the piping.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions .concerning this inspection, we will be pleased

to discuss them with you.

Sincerely

C. A. VanDen ur

Chief

Reactor Projects Branch

Enclosure:

1. Inspection Report Nos. 50-206/93-09,

50-361/93-09, and 50-362/93-09

9306240024 930611

PDR

ADOCK 05000206

G

PDR

2

cc w/Enclosure:

D. Womeldorf, California Department of Health Services

R. Lacy, Manager, San Diego Gas and Electric

Mayor, City of San Clemente

Chairman, Board of Supervisors, County of San Diego

H. Kocol, State Department of Health Services

C. Brinkman, ABB Combustion Engineering Nuclear Power

A. Watts, Esq., Rouke & Woodruff

S. Harris, City of Riverside

R. Kosiba, Bechtel Power Corporation

J. Beoletto, Esq., Southern California Edison Company

R. Krieger, Station Manager (San Clemente)

State of California

3

JUN 1 1 1993

bcc w/enclosure:

Project Inspector

Resident Inspector

Docket File

Greg Cook

S. Richards

B. Faulkenberry

bcc w/o enclosures:

M. Smith

J. Zollicoffer

J. Bianchi

CCaldwell

DSolorio

JRusseTl

HWong

CVan

j4V

C // /93

6 //o/93

4 /eo/93

//q/93

V/01/93

[RE UZT COPY ] REqU ST COPY ]REQkST COPY ]RE UET COPY ]R

T COPY]

[ AES V NO

I dES-)/

NO

1 XS)/ NO

I AES/ NO

1

YES / NO

1

TSundsm

0'

CReg a

'n

SSanchez

CHarb

"

JBa 1

/Li /93

6/,/93

/

/93

4 4/0/93

4//q/93

[RE

T COPY ] REQUEST COPY ] REQUEST COPY ] REQAST COPY ] REQUEST COPY ]

r

/ NO

1

YES /NO

1

YES /NO

I

E / NO

1

YES /NO

]

SRic

rd z

[ SEND TO DCS ]

YES / NO]

ST OP

SEND TO PDR 1

/ NO I

g:\\ps2\\songs\\insprpts\\so93-09.hjw

230032