UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIA LANE
WALNUT CREEK, CALIFORNIA 94596-5368
Docket Nos. 50-206, 50-361, 50-362
APR 3 0 1993
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention: Mr. Harold B. Ray, Senior Vice President, Nuclear
SUBJECT:
NRC INSPECTION REPORT NOS. 50-206, 361, 362/93-05
This refers to the routine inspection conducted by Messrs. C. W. Caldwell and
D. L. Solorio of this office, and T. A. Greene, of the Office of Nuclear
Reactor Regulation, on February 17 through March 31, 1993, of activities
authorized by NRC License Nos. DPR-13, NPF-10 and NPF-15 and to the discussion
of our findings held by the inspectors with Mr. R. W. Krieger and other
members of the Southern California Edison staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
.report.
Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
No violations of NRC requirements were identified within the scope of this
inspection. However, we did note that your QA organization identified that
several commitments made in Licensee Event Report 2-91-007 regarding reactor
coolant pump baffle repairs were not implemented. We are concerned about the
accuracy of this report. We acknowledge that your quality assurance
organization independently identified the deviations and that you are
currently conducting an investigation to address this concern. We will review
this issue to determine the reason for these deviations in a future inspection
after you have completed your investigation.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you:
Sincerely,
C. VanDenburgh
'ef
Reactor Projects
ranch
Enclosure:
.
1. Inspection Report Nos. 50-206/93-05, 50-361/93-05 and 50-362/93-05
9305190049 930430
PDR ADOCK 05000206
0
2
cc w/enclosure:
.D.
Womeldorf, California Department of Health Services
R. Lacy, San Diego Gas and Electric
Mayor, City of San Clemente
S. Shu, State Department of Health Services
C. Brinkman, ABB Combustion Engineering, Nuclear Power
S. Harris, City of Riverside
R. Kosiba, Bechtel Power Corporation
R. Krieger, Station Manager (San Clemente)
Chairman, Board of Supervisors, San Diego County
State of California
3
bcc w/enclosure:
Project Inspector
Resident Inspector
Docket File
G. Cook
B. Faulkenberry
J. Martin
S. Richards
bcc w/o enclosure:
M. Smith
J. Zollicoffer
J. Bianchi
.
RV
C
CCaldwell
DSolorio
TGreene
HWong
CVanDenburgh
y'
/j./93
/,o/93
yI/v-Y93
47
- ,/93
/X0/93
RE
T COPY ] RE
S T COPY
R
COPY
/ NO
I
YE
/ NO
/IAE~
NO
]
"EV/
NO
OES? NO
SEND TO DCS]
YE /NO]
>,
r SEND 10 PDR ]
/NO 1
g:\\ps2\\songs\\insprpts\\so93-05.sri
1I0013