Forwards Insp Repts 50-206/93-05,50-361/93-05 & 50-362/93-05 on 930217-0331.No Violations Noted
ML13329A254
Person / Time
Site: San Onofre  
Issue date: 04/30/1993
From: Vandenburgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13329A255 List:
References
NUDOCS 9305190049
Download: ML13329A254 (3)


See also: IR 05000206/1993005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CALIFORNIA 94596-5368

Docket Nos. 50-206, 50-361, 50-362

APR 3 0 1993

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harold B. Ray, Senior Vice President, Nuclear

SUBJECT:

NRC INSPECTION REPORT NOS. 50-206, 361, 362/93-05

This refers to the routine inspection conducted by Messrs. C. W. Caldwell and

D. L. Solorio of this office, and T. A. Greene, of the Office of Nuclear

Reactor Regulation, on February 17 through March 31, 1993, of activities

authorized by NRC License Nos. DPR-13, NPF-10 and NPF-15 and to the discussion

of our findings held by the inspectors with Mr. R. W. Krieger and other

members of the Southern California Edison staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed inspection

.report.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No violations of NRC requirements were identified within the scope of this

inspection. However, we did note that your QA organization identified that

several commitments made in Licensee Event Report 2-91-007 regarding reactor

coolant pump baffle repairs were not implemented. We are concerned about the

accuracy of this report. We acknowledge that your quality assurance

organization independently identified the deviations and that you are

currently conducting an investigation to address this concern. We will review

this issue to determine the reason for these deviations in a future inspection

after you have completed your investigation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you:

Sincerely,

C. VanDenburgh

'ef

Reactor Projects

ranch

Enclosure:

.

1. Inspection Report Nos. 50-206/93-05, 50-361/93-05 and 50-362/93-05

9305190049 930430

PDR ADOCK 05000206

0

PDR

2

cc w/enclosure:

.D.

Womeldorf, California Department of Health Services

R. Lacy, San Diego Gas and Electric

Mayor, City of San Clemente

S. Shu, State Department of Health Services

C. Brinkman, ABB Combustion Engineering, Nuclear Power

S. Harris, City of Riverside

R. Kosiba, Bechtel Power Corporation

R. Krieger, Station Manager (San Clemente)

Chairman, Board of Supervisors, San Diego County

State of California

3

bcc w/enclosure:

Project Inspector

Resident Inspector

Docket File

G. Cook

B. Faulkenberry

J. Martin

S. Richards

bcc w/o enclosure:

M. Smith

J. Zollicoffer

J. Bianchi

.

RV

C

CCaldwell

DSolorio

TGreene

HWong

CVanDenburgh

y'

/j./93

/,o/93

yI/v-Y93

47

,/93

/X0/93

[REQ ST COPY ] REQU ST COPY

RE

T COPY ] RE

S T COPY

R

COPY

/ NO

I

YE

/ NO

/IAE~

NO

]

"EV/

NO

OES? NO

SEND TO DCS]

YE /NO]

>,

r SEND 10 PDR ]

/NO 1

g:\\ps2\\songs\\insprpts\\so93-05.sri

1I0013