Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 WALTER C. MARSH TELEPHONE ASSISTANT MANAGER, (714) 454-4403 NUCLEAR REGULATORY AFFAIRS June 4, 1993 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Fifteenth Edition of the Integrated Implementation Schedule (IIS)
San Onofre Nuclear Generating Station, Unit 1
Reference:
Letter from W. C. Marsh (SCE) to Document Control Desk (NRC),
dated December 22, 1992;
Subject:
Fourteenth Edition of the Integrated Implementation Schedule (IIS)
San Onofre Nuclear Generating Station, Unit 1 In accordance with License Condition 2.C.(5) to Facility Operating License DPR-13, this letter provides the fifteenth edition of the San Onofre Unit 1 Integrated Implementation Schedule (IIS).
Please note there has been one change from our last letter (Reference): Schedule A, Spent Fuel Pool Cooling Pump modifications have been completed.
If there are, any questions on the enclosure or if you require additional information, please contact me.
Very truly yours, Enclosure cc:
J. B. Martin, Regional Administrator, NRC Region V S. W. Brown, NRC Project Manager, San Onofre Unit 1 C. W. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2&3 R. F. Dudley, Section Chief, Non-Power, Decommissioning, and Environmental Project, Directorate of Reactor Projects - 3, 4, & 5 9306080048 930604 PDR. ADOCK 05000206D R
ENCLOSURE INTEGRATED IMPLEMENTATION SCHEDULE SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 1 FIFTEENTH EDITION JUNE 1993 Introduction This report, the fifteenth edition of the IIS, provides the required status update for the period December 1992 through June 1993. The fourteenth edition of the IIS was provided to the NRC by letter, W. C. Marsh to NRC Document Control Desk, dated December 22, 1992.
The current Schedules A and B are enclosed as Attachments 1 and 2, respectively.
Progress In Implementing NRC Reguirements Spent Fuel Pool Cooling Pump modifications have been completed.
Changes Since The Last Report And The Reasons For Schedule Changes Associated With Schedules A and B.
Because of the decision to permanently cease reactor operation following fuel Cycle 11, all Schedule A, B, and C modifications and major evaluations/submittals scheduled for Cycle 12 and 13 have been cancelled with the following exceptions:
Schedule A Modification-Spent Fuel Pool Cooling Pump modifications, are complete.
Schedule B Modification - Spill Prevention Control and Countermeasures (SPCC)
Modifications.
Appropriate SPCC changes to reflect current Unit 1 shutdown configuration are under review (anticipated completion by the end of 1993).
Expected Percentages Allocation Of Resources On Regulatory And Betterment Projects For The Next Refueling/Modification Outage None
ATTACHMENT 1 INTEGRATED IMPLEMENTATION SCHEDULE A MODIFICATIONS ASSOCIATED WITH RULE, REGULATION OR ORDER NONE ONGOING MAJOR EVALUATIONS REQUIRING SCE SUBMITTAL NONE
ATTACHMENT 2 INTEGRATED IMPLEMENTATION SCHEDULE B MODIFICATIONS ASSOCIATED WITH NRC COMMITMENTS AND OTHER REQUIREMENTS Spill Prevention Control and Countermeasures (SPCC) Modifications. Appropriate SPCC changes to reflect current Unit 1 shutdown configuration are under review (anticipated completion by the end of 1993).