Forwards Reload Safety Evaluation,San Onofre Nuclear Generating Station,Unit 1,Cycle 9. Cycle 9 Core Remains within Previous Design Bases & No Tech Spec Changes Required
ML13324A852
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/06/1986
From: Medford M
Southern California Edison Co
To: Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML13324A853 List:
References
NUDOCS 8605080343
Download: ML13324A852 (1)


Text

Southern California Edison Company P. 0.

BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING (818) 302-749 May 6, 1986 Director, Office of Nuclear Reactor Regulation Attention: G. E. Lear, Director PWR Project Directorate No. 1 U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-206 Reload Safety Evaluation for Cycle 9 Operation San Onofre Nuclear Generating Station Unit 1 San Onofre Nuclear Generating Station Unit 1 completed its eighth cycle of operation on November 21, 1985.

The cycle burnup at the end of Cycle 8 was 9460 MWD/MTU. Return to power for Cycle 9 operation is now scheduled for June 14, 1986. Enclosed is the reload Safety Evaluation which documents that the Cycle 9 core remains within the previous design bases and that no Technical Specification changes are required. This document is being provided for your information only as we have concluded that no unreviewed safety questions per 10 CFR 50.59 are caused by the reload.

Please contact me if there are any questions.

Very truly yours, Enclosure PDR AI)flK (o0206 paoR