ML13324A722
| ML13324A722 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/27/1985 |
| From: | Zintl W SOUTHERN CALIFORNIA EDISON CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML13324A723 | List: |
| References | |
| NUDOCS 8510070179 | |
| Download: ML13324A722 (2) | |
Text
Southern California Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P.O. BOX 128 SAN CLEMENTE.
CALIFORNIA 92672 September 27, 1985 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. J. B. Martin, Regional Administrator
Dear Sir:
Subject:
Docket Nos.
50-206, 50-361 and 50-362 Revised Emergency Plan Implementing Procedures San Onofre Nuclear Generating Station, Units 1, 2 and 3 Pursuant to 10 CFR 50, Appendix E, Section V, enclosed are two copies of revised Emergency Plan Implementing Procedures:
PROCEDURE TCN/REVISION TITLE S0123-VIII-30.2 TCN 2-2 Emergency Public Address Announcements S0123-VIII-70.1 TCN 3-1 Site Telephone Operator Duties In addition, Procedure S023-VIII-28.2 has been cancelled.
Please delete this procedure from your records.
For your convenience, we have enclosed an updated index (Enclosure I) to replace the previous submittal listing the titles, latest revisions and TCN's PDR
-2 to all of the San Onofre Nuclear Generating Station Emergency Plan Implementing Procedures.
The procedures included in this transmittal are indicated on Enclosure I by a bar in the margin.
Si ncerely, W. G.
N L
- MANAGER, COMPLIANCE Enclosures cc: F. R. Huey, USNRC Senior Resident Inspector, Units 1, 2 and 3 U. S. Nuclear Regulatory Commission Document Control Desk (2 copies of all Enclosures)