ML13324A690

From kanterella
Jump to navigation Jump to search
Forwards 01-0310-1413, Superpipe Verification to Benchmark Problems for Multiple Response Spectra Method, Per SEP Topic III-6.Rept Part of Review of long-term Svc Seismic Reevaluation
ML13324A690
Person / Time
Site: San Onofre 
Issue date: 08/02/1985
From: Medford M
Southern California Edison Co
To: Zwolinski J
Office of Nuclear Reactor Regulation
Shared Package
ML13311A408 List:
References
TASK-03-06, TASK-3-6, TASK-RR NUDOCS 8508060249
Download: ML13324A690 (1)


Text

Southern California Edison Company P. 0. BOX BOO 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER. NUCLEAR LICENSING (213) 572-1749 August 2, 1985 Director, Office of Nuclear Reactor Regulation Attention:

Mr. J. A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Subject:

Docket No. 50-206 SEP Topic 111-6, Seismic Design Considerations Superpipe Benchmark Problems San Onofre Nuclear Generating Station Unit 1 As part of the NRC review of the Long Term Service Seismic Reevaluation of San Onofre Unit 1, it was requested that SCE perform additional verification of the computer codes used for the analysis of piping systems. The approach which was undertaken involved performing the analyses suggested in the NRC Benchmark problems prepared for verification of the multiple level response spectrum method of dynamic analysis used for seismic qualification of piping systems.

This effort has been completed and a report prepared for your review.

Accordingly, enclosed are 3 copies of the report entitled, "Superpipe Verification to Benchmark Problems for Multiple Response Spectra Method," July 31, 1985, Impell Report No. 01-0310-1413.

If you have any questions or desire additional information regarding this subject, please contact me.

Very truly yours, M. 0. Medford Enclosure 60P