Amends 851112 Response to Violation Noted in Insp Repts 50-206/85-28,50-361/85-27 & 50-362/85-26.Rev Date for Procedure SO23-WPP/QCI-802 Re Installation of Temporary Scaffolds & Cables Extended from 851231 to 860215
ML13323B080
Person / Time
Site: San Onofre  
Issue date: 12/30/1985
From: Baskin K
Southern California Edison Co
To: Martin J
NRC/IE, NRC/RGN-V
References
NUDOCS 8601140147
Download: ML13323B080 (2)


Text

Southern California Edison Cqlga P. O. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 KENNETH P. BASKIN TELEPHONE VICE PRESIDENT 818-302-1401 December 30, 1985 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. J. B. Martin, Regional Administrator

Dear Sir:

Subject:

Docket No. 50-362 I. E. Inspection Reports Nos.

50-361/85-27, and 50-362/85-26 Amended Response to Notice of Violation San Onofre Nuclear Generating Station, Unit 3

Reference:

Letter, K. P. Baskin (SCE) to J. B. Martin (NRC), same subject, dated November 12, 1985.

The referenced letter provided Southern California Edison's (SCE) response to a Notice of Violation in the subject inspection reports. In the referenced letter, SCE stated a revision to Procedure S023-WPP/QCI-802 (now SO123-WPP/QCI-1802), "Construction Work Order" would be issued by December 31, 1985. This revision would include additional guidance for the installation of temporary scaffolds and the routing of temporary power cables.

In order to develop a comprehensive program to assure adequate control of these installations, SCE requires additional time to issue this procedure.

Our current schedule will issue this procedure and all other related Maintenance procedures to support the implementation of this program by February 15, 1986.

In the interim, SCE is performing engineering evaluations, verification, and documentation of each installation, as required, to meet the provisions of 10 CFR 50.59 and 10 CFR 50, Appendix B.

601140147 8512306 PDR. AD0CK4 0500020

MR. J. B. MARTIN

-2 If you require additional information, please so advise.

Sincerely, cc:

F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2, and 3)