Southern California Edison Company L A!!1 SAN ONOFRE NUCLEAR GENERATING STATION P.O. BOX 128 SAN CLEMENTE, CALIFORNIA 92672 H. B. RAY TELEPHONE STATION MANAGER July 16, 1982 (714) 492 7700 Z:fI10FIle copy U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. R. H. Engelken, Regional Administrator
Dear Sir:
Subject:
Docket No. 50-206 IE Inspection Report 50-20,6/80-17 Health Physics Appraisal San Onofre Nuclear Generating Station, Unit 1
References:
- 1)
Letter, R. H. Engelken (NRC) to L. T. Papay (SCE),
Health Physics Appraisal, dated August 15, 1980
- 2)
Letter, R. Dietch (SCE) to R. H. Engelken (NRC),
Response to Significant Appraisal Findings, dated September 30, 1980 Reference 1 transmitted IE Inspection Report 50-206/80-17, Health Physics Appraisal Program, as an enclosure with the finding that the existing Health Physics facilities should be evaluated in view of its inadequacies to permit proper performance of a variety of activities. In Reference 2 we indicated that expanded Health Physics facilities would be completed by July, 1982.
As a result of the commitments made in Reference 2, a reevaluation of the Health Physics facilities (Door 16) has been performed and an architectural design for an expanded facility has been completed. This new Health Physics facility is scheduled for completion during August, 1983.
Pending the completion of the new Health Physics structure, an interim facility was made operational in February, 1982 to provide for a low background frisking area, separate male and female decontamination and locker areas, and an additional access point to restricted areas of the plant. The capabilities of this interim facility are sufficient to address the deficiencies noted in Reference 1.
8208160286 820716 PDR ADOCK 05000206 G
Mr. R.
July 16, 1982 If you have any questions or if we can provide additional information, please let me know.
Sincerely, cc:
L. F. Miller (NRC Resident Inspector, San Onofre Unit 1)
August 6, 1982 G. P. YUHAS
SUBJECT:
Health Physics Appraisal San Onofre Nuclear Generating Station, Unit 1
REFERENCE:
Letter, H.B. Ray (SCE) to R.H. Engelken (NRC),
IE Inspection Report 50-296/80-17 Health Physics Appraisal, dated July 16, 1982 In the above referenced letter, the upgrading of the existing Health Physics facilities at SONGS was di-scussed.
For further clarification, the decontamination facility is described in more detail.
There is one shower stall available for decontamination in SONGS Unit 1.
Male and female health physics technicians are trained to assist in the decontamination of male or female individuals, respectively.
The decontamination of male and female individuals would be carried out separately, affording both sexes the same degree of privacy.
If you have further questions, please contact me at 714/492-7700, Extension 264.
M. J.
PEER AWReinsch/vm cc:
Engineering Files CDM Files 0